CERN Test Beam Update and Schedule

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Lau Gatignon / EN-MEF, IEFC Workshop, 8 March 2012.
Tertiary beams at H8 (North Area) Electrons: – use an electron beam as secondary beam – thin Pb target for low energy electron production – pure low-energy.
Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert.
FUTURE IRRADIATION FACILITIES AT CERN Lucie Linssen PH/LCD - for the Irradiation Facilities WG  Introduction.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
PID, trigger and DAQ for the GLAST beam test (preliminary study) Nicola Mazziotta INFN Bari Dec. 6, 2005.
The EHN1 Beams Outline General layout of the North Area The target station Principles of the EHN1 beams (N.D.) Particles and beams  tertiary beams Operational.
Energy Saving Jean-Paul Burnet & Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters.
Magnet Energy Recovery Konstantinos Papastergiou CERN Technology Department | Electrical Power Converters Workshop on Special Compact and Low Consumption.
SETTING UP YOUR BEAM IN THE EAST AREA The secondary beam lines are controlled partly by local electronics in the EBCR control room, partly from two Linux.
Muon analysis – PS and SPS data Started May 21, 2012.
Horst Breuker AIDA March, WP6 TA to Testbeams and Irradiation at CERN AIDA units : 600 in Testbeams; 200 in Irradiation Facility; 1 unit = 1 day;
Irradiation Facilities at CERN for RD-51 Micro-Pattern Gas Detectors (RD-51) Workshop Nikhef, Amsterdam, April Mar CAPEANS CERN.
East Area Secondary Beam Control User Guide L.Gatignon / AB-ATB 12 June 2008.
East Area Secondary Beam Control User Guide Revised version after LS1 L.Gatignon / EN-MEF 5 January 2015.
J.-P. Riunaud PS/AE PSMB 16/09/2002 Report from 59 th SPSC meeting 03/09/2002 OPEN SESSION on Tuesday, 3 September 2002 at 09:00, Main Auditorium 1. Proposal.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
East Area Upgrade Requirements from ALICE A.Tauro.
Crystal channeling 2009 A. Afonin, IHEP, Protvino New results of use and research of crystals at U-70. A.Afonin, IHEP, Protvino 4- th Crystal channeling.
East Area Day, 1 February 2012 Lau Gatignon / EN-MEF.
The East Area Rende Steerenberg, ps/op PS-Days 2001 Evian.
IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 111 Middle-Long Term Needs for Ion Beams S.Maury Thanks to T. Bohl, C. Carli, D.
12/10/05NuPAC – CERN 2005M. Benedikt 1 Potential future proton beam performance at CERN for HIE ISOLDE, n_TOF phase 2 and EURISOL Michael Benedikt AB Department,
Overview on CERN Test Beam Facilities and Plans for Tests for Non-Collider Experiments Edda Gschwendtner, CERN.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
NuFact'06 WG3, Aug. 2006A. Fabich, CERNBeta-beam Ion Losses, 1 The EURISOL Beta-beam Acceleration Scenario: Ion Losses A. Fabich, CERN NuFact’06, UCIrvine.
STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
November 15-18, 2002V. Obraztsov - Prague ECFA/DESY Workshop 1 Proposal for TESLA beam test zone at IHEP ( Protvino ) Vladimir Obraztsov Institute for.
Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.
FINDINGS AND CONCLUSIONS OF THE WORKING GROUP ON FUTURE IRRADIATION FACILITIES I. Efthymiopoulos, EN/MEF - for the Irradiation Facilities WG
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN: mainly LHC related topics CERF: beside LHC topics.
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
Breuker Feb Overview of future East Area Programme T8 : 24 GeV/c (primary protons) 2-3 x 10**11 per PS cycle; T9 (new) : 15 GeV/c 10**6 per spill;
Test Beams: Availability & Plans  KEK  DESY  CERN  Fermilab  SLAC  Other Gene Fisk – Fermilab LCWS_2002 Jeju Do.
1/28 VISITS TO COMPASS / NA58 Seminar for guides 9 March 2005 Susanne Koblitz Gerhard Mallot.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
Fermilab Test Beam and Irradiation Facilities Erik Ramberg 10 January, 2013.
Lau Gatignon, Catania,  Introduction  COMPASS  NA62  SHIP L.Gatignon, SPS fixed target physics at CERN.
RF separated beam and other beam issues Lau Gatignon, COMPASS workshop, 22 March 2016.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
CERN accelerator chain (operating and approved projects)
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
Future Irradiation Facilities at CERN Status report of the working group on future irradiation facilities at CERN
NA61 news and plans (May 2013-October 2013) Publications:
Outlook by the Physics Coordinator
User schedule updates 67th EATM, H. Wilkens.
RF-separated beams and “Physics Beyond Colliders”
Kickoff close-out Joerg Jaeckel, Mike Lamont, Claude Vallée.
Test Beams: Availability & Plans
of secondary light ion beams
of secondary light ion beams
CERN Testbeam facilities
The Proton Beam for the neutron Time Of Flight facility

Primary Beam Intensity
A summary of world-wide test beam facilities
Summary SPSC meeting November 2005 for EA section meeting
Present and Future test facilities for High-intensity Targetry CERN
How to control the local beam density
Experimental Areas – LS2 planning
Search for X - - Pentaquark in COMPASS
Reasons for considering new multi-GeV high intensity proton
Presentation transcript:

CERN Test Beam Update and Schedule 2011 Users at PS Testbeams : ~ 20 Groups 2011 Users at SPS Testbeams : ~ 50 Groups 2011 Users at Irradiation Facility : ~ 15 Groups Horst Breuker ALCPG11 22-03-11 Horst Breuker 27 January 09

Beam Facilities at CERN 2 Beam Facilities at CERN North Area SPS Test Beams East Area PS Test Beams Horst Breuker ALCPG11 22-03-11 Horst Breuker 27 January 09

The East Area Beams T9 beam T10 beam (Schematic view!) IRRAD T7 beam EASTB EASTC DIRAC CLOUD IRRAD T7 beam (not used) T9 beam 12 (15) GeV/c T10 beam 6 GeV/c, 60 mr T11: 3.6 GeV/c, 150 mrad N-target S-target Horst Breuker ALCPG11 22-03-11 Horst Breuker 27 January 09 3

Horst Breuker ALCPG11 22-03-11

*) Intensity is for 1% momentum bite, nominal target and not used in 2011 *) Intensity is for 1% momentum bite, nominal target and 2.1011 ppp on target and intensity collimator(s) wide opened. Spill 400 ms (could be > 500 ms at 20 GeV/c) Some more intensity control exists for the primary beam (0.5-1.0) and via the target efficiency (~0.02-1.0). Horst Breuker ALCPG11 22-03-11

The North Experimental Areas at the SPS The SPS proton beam (400 GeV/c) slowly extracted to North Area Directed towards the three North Area primary targets T2, T4 and T6 (NA49) H2 NA61 T2 H4 CERF++ NA63 GIF++ EHN1 H6 T4 H8 Ion-Exp. Neutrino R&D T10 P42 K12 NA62 ECN3 (NA48) T6 M2 COMPASS EHN2 SPS beam Horst Breuker ALCPG11 22-03-11 Horst Breuker 27 January 09

Horst Breuker ALCPG11 22-03-11

Performance of the EHN1 beams pmax H2 Line pmax (GeV/c) Intensity/pulse for 1012 ppp incident Beam type H2 400 9 107 p+ at 200 GeV/c 3 107 p- at 200 GeV/c 4 106 e± at 150 GeV/c 1 105 Pb at 400 GeV/Z High-energy hadron or electron beam for physics or tests *) Heavy ion beam H4 4 106 e± at 150 GeV/c > 107 p at 400 GeV/c High-energy hadron or electron beam for physics or tests, Att. proton beam H6 200 1 108 p+ at 150 GeV/c 4 107 p- at 150 GeV/c Medium energy hadron beam, also for tertiary test beams H8 1 107 p at 400 GeV/c 2 108 p+ at 200 GeV/c 7 107 p- at 200 GeV/c High-energy hadron or electron beam for physics or tests, *) Horst Breuker ALCPG11 22-03-11

Unofficial Schedule Beams are available : 2011 : begin May to mid November 2012 : begin May to mid November 2013 : no beams at all at CERN 2014 : maybe PS beams restart 2015 : begin May to mid November Horst Breuker ALCPG11 22-03-11