Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.

Slides:



Advertisements
Similar presentations
Nick Walker – GDE meeting Frascati Discussion and Approval of the BCD Nick Walker ILC-GDE Frascati –
Advertisements

Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Report from the GDE director Barry Barish Snowmass 14-Aug-05.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
A Final Word ILC Jan 8th, 2005 Eric Torrence University of Oregon.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
GDE Report to FALC Status and Plans Barry Barish FALC Fermilab 4-Nov-05 ILC Polarized Electron Source.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
6-7 April 06 MAC Review Global Design Effort 1 BCD Overview Process and Highlights Barry Barish GDE Caltech.
Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
GDE Report from Snowmass to a Baseline Barry Barish ILCSC Meeting Daegu, Korea 27-Aug-05.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010.
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path.
BCD Status: Strengths and Weaknesses Tor Raubenheimer.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
GDE: Status and Plans Barry Barish CERN FALC Resource Board 8- Feb-06.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
GG3 Operations & Reliability (Availability) Eckhard Elsen Tom Himel
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Date Event Global Design Effort 1 CCB Report GDE Meeting, Vancouver, July, 2006 Nobu Toge KEK/GDE.
ILC Global Design Effort Barry Barish GDE 9-March-06.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
1 Status of the BCD GDE Area System Leaders Meeting (Jan.19-20, 2006) Nobu Toge (KEK)
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
EDR Planning, Cost Review and Technical Risk Analysis
Technical Design Report preparation
ILC Global Design Effort
Barry Barish GDE Caltech
Discussion Session “Strawman” BCD  BCD (now)
Yasuhiro Okada, Executive Director, KEK
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05

GDE Frascati - Introduction & Charge2 The GDE after ~3 Months How are we doing? –BOTTOM LINE is that we are on track to produce a BCD by end of 2005 that will provide a sound basis for entering into a reference design effort, globally coordinate R&D program, begin industrialization, determine costs, etc. next year What are our biggest problems? –communication, communication, communication Where are we going next? –Stay tuned for my next talk

7-Dec-05GDE Frascati - Introduction & Charge3 GDE Frascati – Why are we here? Discuss progress since Snowmass Finish the BCD Organize the GDE and the broader R&D and Design efforts for next year

7-Dec-05GDE Frascati - Introduction & Charge4 GDE Began at Snowmass 670 Scientists attended two week workshop at Snowmass

7-Dec-05GDE Frascati - Introduction & Charge5 Global Design Effort –The Mission of the GDE Produce a design for the ILC that includes a detailed design concept, performance assessments, reliable international costing, an industrialization plan, siting analysis, as well as detector concepts and scope. Coordinate worldwide prioritized proposal driven R & D efforts (to demonstrate and improve the performance, reduce the costs, attain the required reliability, etc.)

7-Dec-05GDE Frascati - Introduction & Charge6 GDE Organization for Snowmass WG1 LET bdyn. WG2 Main Linac WG3a Sources WG3b DR WG4 BDS WG5 Cavity GG1 Parameters GG2 Instrumentation GG3 Operations & Reliability GG4 Cost & Engineering GG5 Conventional Facilities GG6 Physics Options Technical sub-system Working Groups Global Group Provide input

7-Dec-05GDE Frascati - Introduction & Charge7 Goals of the Snowmass Workshop Recommendations for the Baseline Configuration Identify - Alternative Configurations Identify R&D –To support the baseline –To develop the alternatives Priorities for detector R&D

7-Dec-05GDE Frascati - Introduction & Charge8 Guidance for Baseline Configuration Baseline: A forward looking configuration which we are reasonably confident can achieve the required performance and can be used to give a reasonably accurate cost estimate by mid-end 2006 in a “Reference Design Report.”

7-Dec-05GDE Frascati - Introduction & Charge9 What are Alternatives and Why? Alternates: Technologies or concepts, which may provide a significant cost reduction, improved performance (or both), but which will not be mature enough to used in baseline by end 2006 Alternatives will be part of the RDR, will form an important element in the R&D program and are the key to evolving the design

7-Dec-05GDE Frascati - Introduction & Charge10 Baseline Configuration Document Our ‘Deliverable’ by the end of 2005 A structured electronic document –Documentation (reports, drawings etc) –Technical specs. –Parameter tables –… A ‘printable / readable’ summary document (~100 pages) (ready in early 2006)

7-Dec-05GDE Frascati - Introduction & Charge11 Structure of the BCD Summary-like overview for those who want to understand the choice and the why Technical documentation of the baseline, for engineers and acc. phys. making studies towards RDR

7-Dec-05GDE Frascati - Introduction & Charge12 Alternatives Section(s) Note ACD is part of the BCD

7-Dec-05GDE Frascati - Introduction & Charge13 The Key Decisions Critical choices: luminosity parameters & gradient

7-Dec-05GDE Frascati - Introduction & Charge14 Making Choices – The Tradeoffs Many decisions are interrelated and require input from several WG/GG groups

7-Dec-05GDE Frascati - Introduction & Charge15 From Snowmass to a Baseline AugustSeptemberOctoberNovemberDecember 2005 Snowmass WW/GG summaries Response to list of 40+ decisions All documented ‘recommendations available on ILC Website (request community feedback) Review by BCD EC BCD EC publishes ‘strawman’ BCD Public Review Frascati GDE meeting BCD Executive Committee: Barish Dugan, Foster, Takasaki Raubenheimer, Yokoya, Walker

7-Dec-05GDE Frascati - Introduction & Charge16 Baseline Configuration Document Review Process BCD executive committee has monitored BCD progress –Review WG/GG summary write-ups (recommendations) –Review each question on the list of 40+ decisions BCD EC identified and solicited needed additional input –Commissioned 5 “white papers” –Invited independent reviewers (Oide, Richter & Rivkin) Strawman BCD available mid-November Presentation of strawman BCD at Frascati GDE meeting (Dec ) Final agreed BCD to be documented by end of 2005 Final BCD becomes property of ‘Change Control Board’ in early 2006 Reference Design to be completed by end of 2006

7-Dec-05GDE Frascati - Introduction & Charge17 The Prospects for the ILC The science motivation for the ILC is our strongest weapon The technical basis for the ILC is very stong A global effort to design the ILC is underway and working Establishing a baseline will make the ILC more real and taken more seriously A sound design must be established with convincing and affordable costing. Global R&D program to demonstrate the ILC, improve over the baseline and reduce costs.