US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP 500-1-1 ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.

Slides:



Advertisements
Similar presentations
F1B - 1 BU ILDING STRONG SM Flood Risk Management Module F1: Authorities and Policies.
Advertisements

FDR1 - 1 Flood Risk management History/Mission/Policies.
US Army Corps of Engineers BUILDING STRONG ® Public Law 84-99, Rehabilitation and Inspection Program Mike deMasi Chief Emergency Management, PL Program.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
US Army Corps of Engineers BUILDING STRONG ® Vertical Team Roles & Responsibilities Planning Principles & Procedures – FY11.
Corps of Engineers BUILDING STRONG ® Dam Safety Modification Studies Robert Taylor, P.E. Dam Safety Program Manager Great Lakes and Ohio River Division.
Sacramento District Regional Vegetation Variance Paige Caldwell, P.E. Emergency Manager.
Central Valley Flood Protection Board Meeting – September 27,
Flood Risk Management Program Ed Hecker, Chief, Office of Homeland Security National Levee Summit February 2008 St Louis, MO.
Sandy Recovery Improvement Act (SRIA) of 2013 Sandy Recovery Improvement Act (SRIA) of 2013 Public Assistance Program Alternate Procedures Pilot Program.
“Alberta - A Province Prepared” 2008 STAKEHOLDER SUMMIT.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
US Army Corps of Engineers BUILDING STRONG ® Overview of Public Law (PL) Advanced Measures Contingency Operations Directorate.
Fort Bend Flood Management Association Annual Symposium Oct. 3, 2014.
Engineer Circular Requests to Alter USACE Projects
Risk and Emergency Management Division Southside Hampton Roads Hazard Mitigation Plan.
US Army Corps of Engineers BUILDING STRONG ® Missouri River Flood Task Force (MRFTF) Concept Briefing
Seattle District Seattle District U. S. Army Corps of Engineers U. S. Army Corps of Engineers.
US Army Corps of Engineers BUILDING STRONG ® Flood Risk Management Update Stephanie Bray 12/10/2013.
Flood Risk Management Program Rolf Olsen Institute for Water Resources U.S. Army Corps of Engineers.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
US Army Corps of Engineers BUILDING STRONG ® Greater New Orleans Hurricane and Storm Damage Risk Reduction System Armoring Brief Team New Orleans U.S.
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
Module 27 Continuing Authorities Program Module 27 Continuing Authorities Program Civil Works Orientation Course - FY 11.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Central Valley Flood Protection Board Meeting – December 20,
Relevant, Ready, Responsive, Reliable 1 Addressing the Flood Risk Challenge.
1 Slide1 THINGS WE NEED TO UNDERSTAND ABOUT LEVEES: CURRENT INITIATIVES AND FUTURE DIRECTIONS Presentation to Association of State Flood Plain Managers.
ESF #3 – Public Works and Engineering IS-803 – February 2009 Visual 1 Public Works and Engineering ESF #3.
Corps of Engineers Levee Safety Program Levee Safety Program Manager
The New Public Assistance ProgramOV-1 Objectives  Describe the purpose of the New Public Assistance Program  Identify the components of the New Public.
Developing a National Levee Safety Program Mike Stankiewicz - NCLS Arizona Floodplain Management Association November 3, Update on the National.
1 Public Safety Interoperable Communications (PSIC) Grant Program Laura Pettus, Program Specialist Public Safety Interoperable Communications.
Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.
Our Mission MITIGATIONS. MEANING OF MITIGATION MITIGATION IS THE PERMANENT REDUCTION OF THE RISK OF DISASTER MITIGATION IS THE PERMANENT REDUCTION OF.
National Levee Safety Act, Title IX, WRDA 2007 Update for Levee Summit Eric Halpin, P.E. Special Assistant for Dam and Levee Safety Headquarters, US Army.
HAZARD MITIGATION PLAN UPDATE LOCAL EMERGENCY PLANNING COMMITTEE.
LEVEE PERMIT SUBMITTAL & REVIEW PROCESS. Federal Law CODE OF FEDERAL REGULATIONS TITLE CHAPTER II -- CORPS OF ENGINEERS, DEPT OF THE ARMY, PART.
Condition Assessment Of The Hurricane Protection System Larry B. Ardoin, P.E. DIRECTOR, HURRICANE PROTECTION OPERATIONS.
St. Louis – February 25-28, 2008 Extremely Successful -Close to 500 Participants  Jointly Sponsored by ASFPM & NASMA – Supported by Corps and FEMA High.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Federal Interagency Floodplain Management Task Force.
Mississippi River Recovery Task Force Bob Hainly Task Force Member 2012 USACE Flood Risk Management Representing: and Silver Jackets Workshop USGS Water.
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
BUILDING STRONG ® Levee Safety Program  Levee Safety Program Implementation Guidance provided by HQUSACE in 2007 (Post Hurricane Katrina) ► Designate.
Life-Cycle Flood Risk Management
USACE Flood Risk Management and Silver Jackets Workshop Sandra K. Knight, PhD, PE, D.WRE Deputy Associate Administrator for Mitigation, FEMA August.
Federal Interagency Floodplain Management Task Force.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® SMART PLANNING TO SUPPORT FLOOD RISK MANAGEMENT USACE Flood Risk Management and Silver Jackets.
U.S. Army Corps of Engineers Levee Safety Program US Army Corps of Engineers BUILDING STRONG ® December 2013 Update for the NAFSMA Annual Meeting.
California’s Flood Future Recommendations for Managing the State’s Flood Risk Flood Risk Management & Silver Jackets Workshop August 21, 2012.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
US Army Corps of Engineers BUILDING STRONG ® Jody Fischer P.E. Levee Safety Program Manager Los Angeles District U.S. Army Corps of Engineers 14 December.
BUILDING STRONG ® 1 Risk Management Center Silver Jackets Program Overview Jennifer Dunn USACE, Institute for Water Resources Silver Jackets Program Manager.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
2007 Office of Risk Management Annual Conference 2007 David M. Shapiro Disaster Planning & Recovery Consultants
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
US Army Corps of Engineers BUILDING STRONG ® 2011 Flood Recovery The Benefits of Collaboration Maria de la Torre Chief, Emergency Management Baltimore.
US Army Corps of Engineers BUILDING STRONG ® Flood Fighting and Planning US Army Corps of Engineers Omaha District Joel Ames Tribal Liaison.
US Army Corps of Engineers BUILDING STRONG ® Huntington District Floodplain Management Services Dan Bailey, CFM Huntington District August 2012.
K1 Proposed National Levee Safety Program An Introduction for the Tribal Assistance Coordination Group May 12, 2011.
US Army Corps of Engineers BUILDING STRONG ® Levee Safety Policies Supporting a Sustainable Flood Risk Management Program Eric C. Halpin, PE Special Assistant.
Community Health Centers of Arkansas Hazard Vulnerability Assessment Workshop August 11, 2017 Mark Fuller.
Silver Jackets Orientation
Remedial Action Program Workshop
Continuity Guidance Circular Webinar
Revolutionize USACE Civil Works
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management & Silver Jackets Workshop Harrisburg, PA August 21, 2012

BUILDING STRONG ® Purpose of Today’s Presentation  Summarize recommended changes in policy and operational procedure that will better align our business practices  Summarize observations from internal review  Describe the path forward 2

BUILDING STRONG ® Purpose of Policy Revision  Current version is over 10 years old  Align with changes to national preparedness and response frameworks  Transition from flood control to flood risk management and shared responsibility  Incorporate lessons learned from major flood events since Katrina  Align with other CoP programs internally and with federal, state and local partners  Incorporate a “life cycle” risk management approach for natural CW disaster preparedness, response and recovery, and other contingency operations  Consistent application of our policies and procedures 3

BUILDING STRONG ® Chapter 1 – Introduction 2 – Implementation 3 – Preparedness 4 – Response 5 – Rehabilitation (formerly RIP) 6 – Emergency Water 7 – Advance Measures 8 – Flood Risk Management (formerly Hazard Mitigation) 9 – Army Assistance 10 – National Contingency Plan 11 - Contracting 12 – Regulatory Permitting and NEPA (New) 13 – Other Authorities & Mission Areas (New) 4 Overview of Updates/Changes

BUILDING STRONG ® Rehabilitation Program System-Wide Improvement Framework (SWIF) Incorporation of policy guidance for System-Wide Improvements requested by non-federal sponsors  Policy guidance published 29 Nov 2011  Provides process for non-federal sponsors to maintain eligibility for rehabilitation assistance while implementing system wide improvements  SWIF requests for non-federal sponsors are being received and processed 5

BUILDING STRONG ® 6

Summary of SWIF Requests 7 Requests received: 10 LOIs submitted with 4 approved and 6 under review 2 draft LOIs submitted and under review 1 SWIF submitted and under review Breakdown by MSC: LRD – 4 LOIs and 2 draft LOIs NWD – 2 LOIs POD – 1 LOI SPD – 2 LOIs SWD – 1 SWIF, 1 LOI Templates under development: We are circulating for review draft letter templates for a levee sponsor to submit a SWIF Letter of Intent and the attachment that would go with the request. Draft flow chart for processing a SWIF or LOI within the district, MSC, and HQ – under development

BUILDING STRONG ® 8 Rehabilitation Program Project/System Inspections  Inspection policy, process and criteria addressed in the Levee Safety Engineer Circular currently under development  ER revisions will focus how inspection results are used to determine eligibility for rehabilitation assistance Incorporation of “Resiliency” during rehabilitation  Improve a project’s ability to experience and survive flood loads (overtopping) and reduce damage effects of erosion and scour  Implementation extends to the entire project at a 65/35 cost share with non-federal sponsor  Examples include: Hardening, Seepage Control, Slope Stability, and Erosion Reduction Measures

BUILDING STRONG ® Rehabilitation Program Flood Control Dams  Aligns eligibility criteria with the National Dam Safety Act  Eligible dams must meet basic definition of a “Dam” under the National Dam Safety Program Act  Classified as a “High Hazard Dam” or a “Significant Hazard Dam”  Flood control as a primary purpose  Active in and inspected under a State Dam Safety Program  Eligible Dams Include:  Federally authorized dams constructed by USACE, and turned over to non-Federal sponsors to O&M  Non-Federal dams constructed, and maintained by state or local public agencies 9

BUILDING STRONG ® Rehabilitation Program Hurricane Shoreline Protection Projects  Revision of extraordinary storm definition “Length or severity”  Changing from Saffir-Simpson to a project design “exceedance frequency”  Revisions to “Significant Amount of Damages” regarding cost of construction and percent of renourishment fill lost  Percent cost of original construction increased from 2% to 10%  Percent amount of historical or planned renourishment lost due to storm increased from 33% to 50%  “Adequate functioning” redefined as the “beachfill authorized design cross-section profile” which establishes the repair limit under P.L emergency work 10

BUILDING STRONG ® Advance Measures  Deletion of non-federal option to retain temporary structures  Adjust cost share policy for permanent construction to 65% federal 35% non-federal  Incorporation of structural IRRM based on Levee Safety risk assessment  Constructed as permanent construction  Cost shared 65/35  Governor requested  Incorporate Technical Assistance for IRRM plan development 11

BUILDING STRONG ® Flood Risk Management & Hazard Mitigation  Provides policy and procedures for Intergovernmental State & regional teams  Funding for Corps participation on regional or state teams  Provisions of technical assistance to State and local agencies for pre-flood preparedness, response and recovery activities Leveraged through intergovernmental SJ teams Support State and local flood hazard mitigation planning, preparation, and response actions 12

BUILDING STRONG ® Flood Risk Management & Hazard Mitigation, cont.  Establishment of regional/watershed ILTF and Recovery Task Forces  Pre-flood event investigation for NSAP projects  Consider NSAP projects in advance of flood damages  Requested by sponsor  Investigation intended to identify NSAP alternative, willing agency participant, NSAP sponsor 13

BUILDING STRONG ® New Chapters  Chapter 12: Regulatory Permitting and NEPA  Consolidated environmental permitting issues into a single chapter  Chapter 13: Other Authorities & Mission Areas  Broadened to incorporate all potential authorities and mission areas (those outside of P.L that we need to be aware of) 14

BUILDING STRONG ® Summary of Internal Review  Internal review and comment period conducted May – July  Received more than 1,300 comments on the ER and 600 comments on the EP. 15

BUILDING STRONG ® Summary of Internal Review, cont.  Key comment observations:  General concerns were related to timelines, funding, roles and responsibilities, and clarity for implementation  45% of all comments received were on Chapter 5: Rehabilitation (formerly RIP)  Comments identified inconsistencies between ER & EP and provided additional recommendations that are under consideration by the review team. 16

BUILDING STRONG ® 17 JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC 2012

BUILDING STRONG ® Questions Yeah, ask us a question!