OVEN TEST STAND 17/9/2014 Ville Toivanen. Introduction Test stand for the development of Linac3 GTS-LHC ion source micro oven (used for Pb beam production)

Slides:



Advertisements
Similar presentations
26/2704 Vacuum Feature What is vacuum Vacuum in industry
Advertisements

Pilot Plant Automation Survey AIChE Pilot Plant Benchmarking Study Pilot Plant Automation Sean Murray, Zeton Inc. Pilot Plant Automation Sean Murray, Zeton.
KOREA KIYON COMPANY PROFILE. COMPANY PROFILE Korea Kiyon Company, established in 1985, with the highest quality and most technology advanced inert atmosphere.
Quantum System “ Ion flux fraction measurement system.
MSD 1 P12453 Detailed Design Review Markus Holzenkamp Robin Leili Cody Anderson 5/17/2015 Detailed Design Review 1.
A Solder Reflow Oven Dylan Gifford David Cobler. A typical $30,000 Reflow Oven Solder Paste Surface Mount Technology.
1 VACUUM ATMOSPHERES Co NEW PRODUCT ANNOUNCEMENT November 28, 2001.
16 June 2005 Measuring Phase Variations at the SMA Using the IRMA Water Vapour Monitor Robin Phillips James DiFrancesco Tyler Bourke David Naylor.
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
PRELIMINARY TEST PLANS 6/30/2015 Detailed Design Review 1.
FINAL PRESENTATION P The Team Austin Frazer Role: Lead Engineer - Analysis Major: Mechanical Engineering Eileen Kobal Role: Lead Engineer – Mixtures.
Roland Reiss, Sebastian Deiries The Millikelvin Challenge— Cryogenic Control with Industrial PLCs , Roland Reiss & Sebastian Deiries, Scientific.
Digital PECVD Machine Design and Construction Zlatan Ceric William Edwards Timothy Gurtler David Ogden Quan Tran Date:12/10/2010.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
1 isr Institute for Sustainable Resources CRICOS No J Automated Greenhouse Gas Measurement System.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
Sample System Specialists for Gas Analysis Information on Sample System Capabilities.
Transmission Oil Pump Audit Test Stand Project Overview.
FINAL DESIGN: To make our design “Universal” any sensor that uses the standard 4-20mA Output or any T-type thermocouple may be used. SOLIDWORKS CAD FINAL.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
WYMAN GORDON ROCHESTER INSTITUTE OF TECHNOLOGY Multi-Disciplinary Senior Design Team Nick Perrotte (ME)Lead Mechanical Engineer John Knight (ME)Project.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
2015/10/261 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima:
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Update on Laser Beam Lines Christoph Hessler, Mikhail Martyanov, Valentin Fedosseev (CERN laser team)‎ Thanks to M. Battistin, N. Chritin, F. Galleazzi,
Compressor status AWAKE Technical Board meeting 19 August 2015.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
Digital PECVD Machine Design and Construction Zlatan Ceric William Edwards Timothy Gurtler David Ogden Quan Tran Date:10/25/2010.
Vacuum Fundamentals High-Vacuum Technology Course Week 7 Paul Nash HE Subject Leader (Engineering)
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Engineering H192 - Computer Programming Gateway Engineering Education Coalition Lab 1P. 1Winter Quarter Data Acquisition System Fundamentals Lab 1.
Water. What is SmartMQn Water? SmartMQn Water is a packaged monitoring solution that uses sophisticated and easy to use preconfigured application software.
FINAL PRESENTATION SENIOR DESIGN P14315 UNIVERSAL PUMP DATA ACQUISITION SYSTEM.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
World Leaders in Combustion Management Solutions Module Gas Setup Introduction The Mk7 E.G.A Cell Status Further Information.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
Plumbing and Gas, for better optical cryostats Warren Johnson LSU.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Large Tonnage Chiller WC Screw.
WP4: Instrumentation Tânia Melo Mendonça. 2 ISOLDE target unit Present target unit base at ISOLDE with 7 inlets (including ion source gas leak, heating.
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
CARE SC meeting August 2005 T. Garvey JRA1 – SRF (WP 7 – 11)
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
LINAC3 UPGRADE Strategy for the hardware modification of the GTS-LHC 18/3/2015 Ville Toivanen.
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
Claudia Dias Vacuum, Surfaces & Coatings Group Technology Department Claudia Dias CERN, Technology Department Vacuum, Surfaces and Coatings Group 2 |
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
© 1997, Angus Rockett Section I Evaporation.
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Status of Vacuum Control System
Preliminary Y-chamber specifications – First draft
Recent developments in the Vacuum Control Software
How SCADA Systems Work?.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
XFEL Vacuum System Commissioning
CEDAR Detector Ventilation System Review
Design of a Computer Controlled Test System for
Plasma Cleaning Safety Presentation
Target collaboratin Board Meeting
Mechanical Engineering progress for the Front End Test Stand
Presentation transcript:

OVEN TEST STAND 17/9/2014 Ville Toivanen

Introduction Test stand for the development of Linac3 GTS-LHC ion source micro oven (used for Pb beam production) Aims: Gain better understanding of the oven functionality Improve the oven performance Improve GTS-LHC and Linac3 performance with Pb Means: Correlation between input power and temperature Quantification of evaporation rate Measurement of short and long term stability … Test bench for Linac3 oven control system development A more sophisticated PLC control system

Overview and features 9 1.Vacuum enclosure 2.Pumping group 3.Pressure measurement 4.Oven 5.Oven feedthrough 6.Viewports + shutter 7.Thermocouple feedthrough 8.Venting / gas inlet 9.Evaporation rate detector Quartz crystal sensor Deposition data from shift in the crystal fundamental frequency Shutter allows sampled measurement Industry “standard” Successfully used to diagnose Linac4 Cs oven

Cross section view Oven Thermocouple feedthroughs Evaporation detector Viewport Shutter

Control system (Michael O’Neil) Programmable Logic Control (PLC) Control, monitoring and data logging Oven control Diagnostics (thermocouples, evaporation rate, pressure) Long term operation (Optional) LabVIEW interface for measurement routine development Platform for future Linac3 oven control system upgrade

Current situation FeatureSituation Overall designCompleted Mechanical (vacuum) partsQuote for prices acquired Control systemQuote for prices acquired Custom oven feedthroughDesign decided, next details and manufacturing Frame, mountingPlanning ongoing Diagnostics (evaporation detector)Waiting for a quote Place for the test standNot yet known

Cost and schedule estimations CategoryCost estimateSchedule Mechanical parts, vacuum8100 CHF5 weeks delivery Diagnostics(waiting quote) Control system (PLC)3200 CHFOff the shelf Oven feedthrough (design+manuf.)~4000 CHF(workshop dependent) Support, mounting structures~5000 CHF(manuf. dependent) Bottom line: ~20000 CHF + detector price >1.5 months