F1, F3, F4, F5 PER 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Thermal Christopher Smith Thermal Engineer University of California - Berkeley.

Slides:



Advertisements
Similar presentations
Palestine TV Test Jason Link University of Hawaii ANITA Collaboration Meeting at UCI 4/7/05 – 4/9/05.
Advertisements

MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.
Thermal Modeling and Model Correlation of the LORRI Telescope
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
Observatory - Overview July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 1 Single Observatory Stowed.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 IDPU Mechanical / Thermal Preliminary Design Review Heath Bersch University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April , 2004 EFI Axial Booms Thermal Christopher Smith Thermal Engineer
THEMIS TIMPURGE- 1 UCB, JUNE 16, 2005 THEMIS INSTRUMENT NITROGEN PURGE.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Presenter1 Thermal Control R.Eby Impact Boom Stowed and Deployed SWEA STE Magnetometer Bob.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
MAVEN PER May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Thermal Millan F. Diaz-Aguado Mars Atmosphere and Volatile.
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
LAT TVAC Test Delta-PDR1 GLAST LAT Project25 May 2005 LAT Environmental Test Planning and Design Delta-Preliminary Design Review 25 May 2005 LAT T-Vac.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Prat CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
Spacecraft Level Testing and Verification Part 3 1.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Thermal Analysis Christine Cottingham LM/GSFC 545 Hume Peabody GSFC.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
FIELDS MEP Thermal Vacuum Cycling iPER
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
Gayle K. Martin November 14, 2016
General overview Place : Institue of Space Astrophysic (IAS, Orsay)
THEMIS INSTRUMENT SUITE FM4/FM5 PRE-ENVIRONMENTAL REVIEW
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
Spacecraft Interface and I&T
(EFW Systems Engineer) University of California, Berkeley
SPP FIELDS V1234 Thermal PSR
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
GLAST Large Area Telescope:
THEMIS INSTRUMENT SUITE
FIELDS SCM Thermal iPER
LAT Requirements Verification in TVAC
Jason Link University of Hawaii
University of California, Berkeley
Integration and Test Organization Chart
CRaTER Thermal Analysis
Presentation transcript:

F1, F3, F4, F5 PER 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Thermal Christopher Smith Thermal Engineer University of California - Berkeley

F1, F3, F4, F5 PER 2 UCB, June 23, 2006 Thermal Hardware Status

F1, F3, F4, F5 PER 3 UCB, June 23, 2006 Thermal Hardware Status

F1, F3, F4, F5 PER 4 UCB, June 23, 2006 Thermal Hardware Status

F1, F3, F4, F5 PER 5 UCB, June 23, 2006 Model Correlation Substantially Complete All boxes within 5 degrees of test temperatures Thermostat set points verified –Except IDPU, Transponder and BAU Secondary which could not get cold enough –Except Fuel Line Zone #1 and Service Valve Secondary which would have required turning off RCS Zone #1 and Zone #2 Heater duty cycles less than 70% Predicts for TVAC #2 and #3 complete Flight Predicts in process including correlated heater power predicts Thermal Modeling Status

F1, F3, F4, F5 PER 6 UCB, June 23, 2006 PFRs PFR-186:Thermal Blanket Velcro Adhesion Failure remains open until fix is implemented on all probes RFAs Four recent thermal RFAs assigned at Swales PSRs are currently open –??: VDG optical property monitoring –P1_PSR_2: Transponder Radiator Resizing –P1_PSR_3: Test Versus Flight Radiator Heat Flow Comparison –P1_PSR_4: Comparison of Pre-test Flight Predicts to Correlated Model. RFAs, and PFRs

F1, F3, F4, F5 PER 7 UCB, June 23, 2006 Thermal Cycle Accumulation Individual Instrument TVAC (2 Cycles) Instrument Suite TVAC (6 Cycles) Individual Probe Component TVAC (8 Cycles) Probe Level TVAC (4 Cycles, 3 Balance Points)

F1, F3, F4, F5 PER 8 UCB, June 23, 2006 Thermal Vac Testing History Instruments

F1, F3, F4, F5 PER 9 UCB, June 23, 2006 Thermal Vac Testing History Instruments

F1, F3, F4, F5 PER 10 UCB, June 23, 2006 Thermal Vac Testing History Suite and IDPU

F1, F3, F4, F5 PER 11 UCB, June 23, 2006 Thermal Vac Testing History Mag Booms

F1, F3, F4, F5 PER 12 UCB, June 23, 2006 Thermal Vac Testing History SPB

F1, F3, F4, F5 PER 13 UCB, June 23, 2006 Thermal Vac Testing History AXB

F1, F3, F4, F5 PER 14 UCB, June 23, 2006 Thermal Vac Testing History Probe Components

F1, F3, F4, F5 PER 15 UCB, June 23, 2006 Test Facilities Testing will take place in JPL chamber #7 74”x134” Will simultaneously accommodate two Themis probes for F3-F4 and F1-F5 testing with chamber divider shroud Gaseous or liquid nitrogen controlled shrouds GN2: –130 to +125 deg C LN2: -175 deg C Two TQCMs Nitrogen Vent-back is rate limited 20 power Supplies 168 Type T thermocouple feedthroughs 250 Channel DAQ system 1000 L/sec Leybold and 2000 L/sec Balser Turbo pumps Tank cleanliness certified prior to T-V test

F1, F3, F4, F5 PER 16 UCB, June 23, 2006 TVAC Flow for P2

F1, F3, F4, F5 PER 17 UCB, June 23, 2006 TVAC Flow for P1, P3, P4, and P5

F1, F3, F4, F5 PER 18 UCB, June 23, 2006 Thermal Vac Configuration

F1, F3, F4, F5 PER 19 UCB, June 23, 2006 Feed-through Allocation Feed-through Plate #1 and #2 (Identical 15” Plate) Probe Umbilical (TBF2821PS x3) Thruster Enable Test Set (TBF2821PS) Solenoid Valve Turn Around (TBF2821PS) Virtual Sat/Bridge, MSS Stimulator Controller (TBF2821PS) Feed-through Plate #2 (15” Plate) Heater #1 (10 channels, JPL Provided) Heater #2 (10 Channels, JPL Provided) Thermocouple #1 (55 Channels, JPL Provided) Thermocouple #2 (56 Channels, JPL Provided) Thermocouple #3 (56 Channels, JPL Provided) Miscellaneous 3.5” Feed-through Plates Assigned by JPL TQCM system (x2) EFI Boom Simulator (MS3126E22-55P) Instrument SST Source Shutter (Free pins of TBD connector) Probe RF Cable (TNC Connector)

F1, F3, F4, F5 PER 20 UCB, June 23, 2006 Probe On Thermal Vac Rail Thermal Box - Probe Mounting

F1, F3, F4, F5 PER 21 UCB, June 23, 2006 Baffling Taped In Thermal Box – MLI Baffling

F1, F3, F4, F5 PER 22 UCB, June 23, 2006 P2 Lifted On To Rail

F1, F3, F4, F5 PER 23 UCB, June 23, 2006 TVBOX #2 Test

F1, F3, F4, F5 PER 24 UCB, June 23, 2006 TVBOX #2 Test

F1, F3, F4, F5 PER 25 UCB, June 23, 2006 Test Heaters 12 test heaters provided for the thermal box 1 heater for the Antenna Hat Coupler 1 Heater for the Separation Ring 1 heater provided for Zero Q 1 heater for controlling the beam warm up

F1, F3, F4, F5 PER 26 UCB, June 23, 2006 Instrumentation 80 T-type thermocouples specified for each probe (168 used for F2 alone) 64x2 used on the spacecraft 16x2 used for heaters and environment Transponder fully instrumented Added thermocouples to the RCS system on P3

F1, F3, F4, F5 PER 27 UCB, June 23, 2006 THM-SYS-004, THEMIS Contamination Control Plan THM-SYS-014, THEMIS ESD Control Plan THM-MINT-PROC-010, THEMIS Probe Power On/Off Procedure THM-MINT-PROC-013, THEMIS Probe LPT Procedure THM-MINT-PROC-014, THEMIS Probe AT Procedure THM-MINT-PROC-032, THEMIS Instrument LPT Procedure THM-MINT-PROC-034, THEMIS Instrument AT Procedure THM-MINT-PROC-048, THEMIS Probe TV Functional THM-MINT-PROC-056, THEMIS Probe Rollover Procedure THM-MINT-PROC-058, THEMIS Probe Lift in Rollover Fixture Proc THM-MINT-PROC-059, THEMIS Thermal Vac Chamber Loading Proc THM-MINT-PROC-140, THEMIS Probe Thermal Closeout Procedure THM-MINT-PROC-102, THEMIS TV Functional Configuration Test THM-MINT-PROC-047, THEMIS Probe Pair TV Test Procedure –In Progress TVAC Procedures

F1, F3, F4, F5 PER 28 UCB, June 23, 2006 P2 TVAC Results Before Correlation Comparison of the test data with test predicts show most components are within 5°C of test predicts for Hot and Cold Balance Cases The Survival Balance Case (Cold 2) results indicate that the model is conservative on the cold side which means that flight heater powers will be less than predicted.

F1, F3, F4, F5 PER 29 UCB, June 23, 2006 Correlated Interface Conductances

F1, F3, F4, F5 PER 30 UCB, June 23, 2006 Correlated Blanket e*

F1, F3, F4, F5 PER 31 UCB, June 23, 2006 Correlated Thermostat Set Points

F1, F3, F4, F5 PER 32 UCB, June 23, 2006 Other Changes Added Thermostat masses on RCS Fuel Lines Heater Zones (12 grams per TSTAT) RCS Max Heater Power multiplied by (Accounts for 33V Bus instead of 24V) Adjusted RCS Latch Valve, P-Ducer and Solenoid Valve MCp values to account for single node model (FAC 0.2). Adjusted Sun Sensor outer face emissivity from 0.2 to 0.8 (accounts for black anodized Baffles)

F1, F3, F4, F5 PER 33 UCB, June 23, 2006 P2 TVAC Results After Correlation

F1, F3, F4, F5 PER 34 UCB, June 23, 2006 RFA ??: VDG optical property monitoring Description: Monitor the optical properties of the VDG Top Deck through environmental testing and up to launch. Resolution: The following actions are being taken by THEMIS Project Office to satisfy the intent of Probe 3 PSR RFA #4. THEMIS VDG witness coupons will be cut into sections of 2 x 2 inches square. The square VDG coupons will be sent to GSFC for Alpha and E measurements. The VDG coupons will be exposed to probe thermal vacuum test environment. The VDG coupons will be measured for optical properties up to launch. The VDG test results will be documented and summarized in a report. RFAs, and PFRs

F1, F3, F4, F5 PER 35 UCB, June 23, 2006 RFA_P1_PSR_#2 RFA P1_PSR_#2: Transponder Radiator Resizing Description: Provide rational and supporting data to support the decision to increase the transponder radiator area by 30% rather than replacing the Cho-therm interface material that had been reused. Have the transponder to radiator bolts been re-torqued after the test? How do you know that poor interface conductance experienced for Probe 2 is only attributed to the Chotherm and not surface flatness which may or may not be consistent with other probes. Resolution: In progress, Rommel Zara is working on this issue. All probes now use fresh Chotherm, including P2 All Chotherm interfaces experienced the same degradation from predicts, which suggests this is an issue with Chotherm and the composite deck. Testing of remaining probes will help resolve this question Two thermal balances will be done on the following probes to help nail down the variables. Heater power cost will be analyzed but it is expected that the increase in heater power will be covered by the decrease in the RCS heater power.

F1, F3, F4, F5 PER 36 UCB, June 23, 2006 RFA_P1_PSR_#3 RFA P1_PSR_#3: Test Versus Flight Radiator Heat Flow Comparison Description: Provide a comparison of the energy flows for all un-insulated surfaces (i.e. radiators) between the hot and cold test conditions and the associated flight condition. Also provide a comparison of the combined heat flow through MLI blankets for test and associated flight design cases Resolution: Lou requested this prior to the P2 testing but I was unable to get to this then. I completely agree and this is in the plan. Analysis has started and it will be completed before the 01 July due date.

F1, F3, F4, F5 PER 37 UCB, June 23, 2006 RFA_P1_PSR_#4 RFA P1_PSR_#4: Comparison of Pre-Test Flight Predicts to Correlated Model Description: Provide a comparison of flight predictions using the correlated model with pre-test flight predictions. Identify temperature sensitive components whose temperatures were substantially changed. Revisit correlation changes made to the model that effect these components and assure yourself that the changes make physical sense. Include heater powers and provide a comparison of assumed component power dissipation versus available test measured values. Resolution: Completely agree and this was already in the plan, analysis has started and it will be completed by the 01 July due date.