06.03.2006Preparation for CERN TB - Erika Garutti1 Preparation for CERN test beam H6 test beam area in Prevessin.

Slides:



Advertisements
Similar presentations
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Advertisements

31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
3 Nov 2006News - Paul Dauncey1 The 2006 beam tests have finished! DESY in May, CERN in Jul-Oct Many tens of millions of events and many TBytes of data.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
Biometric Daily Time Record
Quality Control B. von Haller 8th June 2015 CERN.
WIKI IN EDUCATION Giti Javidi. W HAT IS WIKI ? A Wiki can be thought of as a combination of a Web site and a Word document. At its simplest, it can be.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Area Of Study 2 Information And Communications Technology(ICT)
HPS Online Software Discussion Jeremy McCormick, SLAC Status and Plans.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Offline shifter training tutorial L. Betev February 19, 2009.
CS 111 – Dec. 3 Lab recap Problem solving approach for systems analysts –8 phases –Just understand the flow/process/sequence of the steps, not specifically.
The 2007 CALICE Test CERN (part II) Erika Garutti, Fabrizio Salvatore.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
Student Records Training Team
Collisions… … with “non-stable beams” maybe on Thursday –Got experts to converge on goal and how to do it … to check timing, using L1 = zero-bias seeding.
Run Coordination Summary of the May 14, 2004 Run Coordinator Meeting CT-EC2 Run Preparation Meeting May 17, 2004 Slide 1 Peter Loch University of Arizona.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
Nigel Watson / BirminghamCALICE ECAL, UCL, 06-Mar-2006 Test Beam Task List - ECAL  Aim:  Identify all tasks essential for run and analysis of beam data.
SIGNZ V3.1 Overview Sales Information Systems (NZ) Limited
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Pixel-Tilecal-MDT Combined Run E. Pasqualucci INFN Roma.
CALICE meeting - ANL 1 I am sad to announce you that Vincent Lepeltier died this morning by heart attack He was a strong supporter of ILC in France Working.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
Firmware - 1 CMS Upgrade Workshop October SLHC CMS Firmware SLHC CMS Firmware Organization, Validation, and Commissioning M. Schulte, University.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
Objectives Understand Corrective, Perfective and Preventive maintenance Discuss the general concepts of software configuration management.
K. Jon-And, Stockholm University1 Tilecal Team 5 meeting 8 November 2005.
30/06/08E. Garutti1 CALICE testbeam 2008 FNAL. 30/06/08E. Garutti2 The installation.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
1 CERN 2007 Installation and Run Plan Erika Garutti & Fabrizio Salvatore.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 22 February 2011 Time Meeting, BNL.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Thomas Ruf, CERN EP Experience with C++ and ROOT used in the VX Beam Test Thomas Ruf, CERN, EP  Why? Event structure for VX-data rather complex: raw hits.
1 Calice TB Review DESY 15/6/06D.R. Ward David Ward Post mortem on May’06 DESY running. What’s still needed for DESY analysis? What’s needed for CERN data.
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
M4 Operations ● Operational model for M4 ● Shifts and Experts ● Documentation and Checklists ● Control Room(s) ● AOB Murrough Landon 24 July 2007.
Fleet Manager. Features Features Explained The fleet manager module allows fleet companies to do the following Store and manage vehicle related information.
CMS ROC Report Patricia McBride May 26, 2005.
Online Monitoring : Detector and Performance check
the CALICE test beam set-up and running experience
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Calibrating ALICE.
Preparation for CERN test beam
CALICE News The 2007 beam tests have started!
Proposal for obtaining installed capacity
Offline shifter training tutorial
Overview of CLAS12 Calibration
Installation and Run Plan
Technical Board – DCAL Software
Building Disaster Planning
Test Beam models in Mokka
Presentation transcript:

Preparation for CERN TB - Erika Garutti1 Preparation for CERN test beam H6 test beam area in Prevessin

Preparation for CERN TB - Erika Garutti2 Starting a “To Do List” Get all possible documentation & info about CERN TB  from the Web: H6 manual, LCWS talk of M. Hauschild, …  combined visit to CERN (~Apr. 24) with a detailed list of questions Combined plan of installation and data taking  agree on combined physics program (next meeting) Divide tasks / avoid multiplication  clear definition of responsibilities (following the example of Nigel) and good exchange of results Shift schedule (on site / off site (analysis) / expert list) Ease the life of people  accommodation, CERN, VISA, …

Preparation for CERN TB - Erika Garutti3 Daily meeting with machine and with the shift crew

Preparation for CERN TB - Erika Garutti4 Integration of CERN equipment in our DAQ + understanding + shift instruction

Preparation for CERN TB - Erika Garutti5 Start of new shifts! Prepare bureaucracy in advance

Availability of people Availability of people at the CERN test beam in 2006 July-06August-06September-06October # of people INSTECALCALIBHCAL INSTHCAL+ECAL required for shift 6/24h4/16h9/24h DESY needed in addition ITEP+MePHI 6 7 Prague 8 NIU 9 This test beam is the goal of the last 3 years of work: we should give THE BEST!!! preliminary

Shift schedule (1 st proposal) Shift schedule for the CERN test beam in 2006 (HCAL proposal) July-06August-06September-06October INSTECALCALIBHCALINST HCAL*ECAL morning 8-16 evening night 24-8 covered shift (by HCAL / DESY*) * ITEP/MePHI/NIU not counted uncovered shift preliminary

Preparation for CERN TB - Erika Garutti8 General strategy  Common way to look at the data (Marius) online / semi-online display feedback from fast-offline analysis  Common place where to store info (Sven) online logbook online documentation (beam usage, manuals, crew instructions) online updated plots (# ev. collected, detector efficiency)  Common software for calibration and analysis collected in one place (?) easy to access same format (MARLIN) requires common coordination (maybe analysis coordinator ?)  documentation, documentation, documentation

Preparation for CERN TB - Erika Garutti9 The pre-preparation Getting ready for CERN starts DESY: The DESY test beam Apr.-Jun. can be the test bench for combined readout (DAQ) combined online monitoring first level reconstruction software integration of ECAL – HCAL software train shift crews for operating the two detectors !!! Let’s exploit this chance at best

Preparation for CERN TB - Erika Garutti10

Preparation for CERN TB - Erika Garutti11 From Nigel list All checked

Preparation for CERN TB - Erika Garutti12 Check also hadron beam calibration Combined effort when?

Preparation for CERN TB - Erika Garutti13 From Nigel list