CS-SWIM Meeting Planning 6 March 2007. Short term pre-PSACI Users/advisory panel identified, invited (CS victims needed; Al Sussman, Andrew Seigel) Schedule.

Slides:



Advertisements
Similar presentations
Current methods for negotiating firewalls for the Condor ® system Bruce Beckles (University of Cambridge Computing Service) Se-Chang Son (University of.
Advertisements

Lectures on File Management
ERP E NTERPRISE R ESOURCE P LANNING Every Monday, 13:30 – 16:00 Last Updated: 31 March 2009ERP – Ir. H. Noor Hidayat, MMT.1.
IU/GA/ORNL Summary. Most of Monday Wael explaining his script and configuration file design  Intent to follow Don's design as closely as possible  Single.
July 2010 D2.1 Upgrading strategy Javier Soto Catalog Release 3. Communities.
Operating Systems Operating system is the “executive manager” of all hardware and software.
SWIM WEB PORTAL by Dipti Aswath SWIM Meeting ORNL Oct 15-17, 2007.
University of Toronto Department of Computer Science © Steve Easterbrook. This presentation is available free for non-commercial use with attribution.
1 When to Switch Processes 3 triggers –System call, Interrupt and Trap System call –when a user program invokes a system call. e.g., a system call that.
Microsoft ® Official Course Interacting with the Search Service Microsoft SharePoint 2013 SharePoint Practice.
Chapter 2- Software Process Lecture 4. Software Engineering We have specified the problem domain – industrial strength software – Besides delivering the.
Operating Systems.
Check Disk. Disk Defragmenter Using Disk Defragmenter Effectively Run Disk Defragmenter when the computer will receive the least usage. Educate users.
The Origin of the VM/370 Time-sharing system Presented by Niranjan Soundararajan.
Submitting Book Chapters via Manuscript Central A Short Guide for Wiley-VCH Authors.
CVSQL 2 The Design. System Overview System Components CVSQL Server –Three network interfaces –Modular data source provider framework –Decoupled SQL parsing.
1 Self-configuring of multiple frameworks for NCB Sean Leslie Ricardo Tirado Graduate Students: Andrew Allen.
CS499 Use Cases References From Alistair Cockburn Writing Effective Use Cases (Book) - Use Case.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
© Grant Thornton | | | | | Guidance on Monitoring Internal Control Systems COSO Monitoring Project Update FEI - CFIT Meeting September 25, 2008.
Surveying patrons with the Impact Survey A fast, easy way to gather feedback from the community about public technology needs Samantha Becker, MLIS, MPA.
VT SMS System User Manual
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
The 1:1 meeting scheduler that runs itself The 1:1 meeting scheduler that runs itself.
Accelerating Scientific Exploration Using Workflow Automation Systems Terence Critchlow (LLNL) Ilkay Altintas (SDSC) Scott Klasky(ORNL) Mladen Vouk (NCSU)
F.Pacini - Milan - 8 May, n° 1 Results of Meeting on Workload Manager Components Interaction DataGrid WP1 F. Pacini
Supported by EU projects 12/12/2013 Athens, Greece Open Data in Agriculture Hands-on with data infrastructures that can power your agricultural data products.
Module 10 Administering and Configuring SharePoint Search.
Weka: Experimenter and Knowledge Flow interfaces Neil Mac Parthaláin
CE Operating Systems Lecture 3 Overview of OS functions and structure.
Privilege separation in Condor Bruce Beckles University of Cambridge Computing Service.
Automated Scheduling and Operations for Legacy Applications.
Systems Analysis and Design in a Changing World, Fourth Edition
Time Management.  Time management is concerned with OS facilities and services which measure real time, and is essential to the operation of timesharing.
Operating System Principles And Multitasking
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
Implementation of EIDE Gateway using ACES Callouts WECC DEWG EIDE Training.
USER DOCUMENTATION Zaheer Shaikh Noshaba Bakht Eric Tse Mayyapan Ramaswamy.
Abstract Modeling of Service Package Result Components 31 March – 3 April 2014 Noordwijkerhout, Netherlands John Pietras Global Science and Technology,
Workflows and Data Management. Workflow and DM Run3 and after: conditions m LHCb major upgrade is for Run3 (2020 horizon)! o Luminosity x 5 ( )
Time Management.  Time management is concerned with OS facilities and services which measure real time.  These services include:  Keeping track of.
The Claromentis Digital Workplace An Introduction
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
Cognos 8 BI Configuration, Administration, and Upgrade Cognos 8 BI.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
1 ETL Framework Definition - For a leading Financial Service Company - Name: Designation: Date: February, 2004 Copyright Wipro Technologies 2004 Consultancy.
Systems Development Life Cycle
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
Chang, Wen-Hsi Division Director National Archives Administration, 2011/3/18/16:15-17: TELDAP International Conference.
University of Southern California Center for Systems and Software Engineering RDCR ARB CS 577b Software Engineering II Supannika Koolmanojwong.
Statistical process model Workshop in Ukraine October 2015 Karin Blix Quality coordinator
Tailoring the ESS Reliability and Availability needs to satisfy the users Enric Bargalló WAO October 27, 2014.
CyVerse Workshop Discovery Environment Overview. Welcome to the Discovery Environment A Simple Interface to Hundreds of Bioinformatics Apps, Powerful.
Oracle HFM Implementation Boot Camp Presented by Saravanan Singaravadivelan Developed by Saravanan Singaravadivelan Senior Consultant Qubix International.
Adient PLC - Global Supplier Scorecard Report Training
CyVerse Discovery Environment
Tango Administrative Tools
WinCC-OA Upgrades in LHCb.
Requirements: Use Case Models and Narratives
OPERATING SYSTEM OVERVIEW
Privilege Separation in Condor
User Manual KC SMS System User Manual
Processor Fundamentals
Mobilize the Resources
Implementation of EIDE Gateway using ACES Callouts
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Adient PLC - Global Supplier Scorecard Report Training
Presentation transcript:

CS-SWIM Meeting Planning 6 March 2007

Short term pre-PSACI Users/advisory panel identified, invited (CS victims needed; Al Sussman, Andrew Seigel) Schedule for PS branch.  Request for capabilities, by 18 March  Branch 25 March or later  Need to have unbroken codes/executables for PSACI runs  Longer term schedule of PS upgrades (and concommittent requests for changes)

Short term pre-PSACI Primary science-driven sims needed  ITER start-up (run on PPPL mhd)  Porcelli test: Linear MHD (run on PPPL mhd)  Rate of tail formation on CMOD (requires Jaguar) At least first two require EPA component, need to get this working with current driver/fmwk  Propogation of time-step backtracking not essential (but we still must allow for it in fmwk and driver)

Short term pre-PSACI Have portal that  Provides active monitoring of job events  Monitoring via ElViz of desired physics thingies  Allows access to data management system for users to filter (via easily generated provenance data) among files generated during a SWIM run Job launch on PPPL systems from portal  Longer term to address others, esp Jaguar

Short term pre-PSACI Getting SWIM framework, driver, and configuration system documented, design explained Need schedule for when runs must be completed for analysis, and who does the runs (DB will propose this schedule)

Mid Term: between PSACI's Need capability for signaling between components (including driver component).  Need use scenarios delineated! Will only need (in fast MHD) to signal from a component when it completes, or from a component in mid- execution? Will a component need to signal in mid-execution for a service that it needs before it can continue? Can use (untested) exception model from CCA for this

Mid Term: between PSACI's Refine data management system  Get what data files, what data objects are of interest For monitoring For ease of extraction later More generally, use cases for portal and use of data by physicists here  Identification of most useful metadata (in end user terms, what kind of questions do you want to ask to locate data from SWIM runs?) Don: find the sim I did for a similar case, find the experimental data used with/for it.

Mid Term: between PSACI's Science runs needed for PSACI 2008  Timelines like for this year's to get geared up earlier  Need to fulfill promise to effectively use the Leadership Class Facility Address job launch from portal to LCF systems  Is this useful, or stick with having LCF runs done separately (but sending data/monitoring to portal) Issues of LCF systems; check particularly the PS being built since it is central.

Mid Term: between PSACI's Regression tests for components  Identification of a few test cases that can be used by CS people. Need not be complete coverage. Performance testing of components (including driver component) Build and configure system  Currently a top-level make system set up by Wael Review is about 1.x years from now. Need to also determine goals for it. Depends on cycle, but may need to detail goals earlier for it.