CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.

Slides:



Advertisements
Similar presentations
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Advertisements

Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
PARTICIPATION IN THE DESIGN AND R&D ACTIVITIES FOR A FUTURE LINEAR COLLIDER: A. Faus-Golfe IFIC - Valencia Accelerator and Detector aspects FPA
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
The Detector and Interaction Region for a Photon Collider at TESLA
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
1 ATF2 Tuning and its application to ILC and CLIC FFS/IR region ASTeC and MAN : working together on tuning methods for the ATF2 and ILC IR/extraction design.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
Machine Detector Interface Lau Gatignon / CERN-EN.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
CLIC main detector solenoid and anti-solenoid impact B. Dalena, A. Bartalesi, R. Appleby, H. Gerwig, D. Swoboda, M. Modena, D. Schulte, R. Tomás.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
Beam Commissioning Marco Oriunno (SLAC), May 14, 2014 ALCW 2014, Fermilab Engineering Issues.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Draft MDI Action plan Presented by Lau Gatignon 25 September 2009.
First calculations of the CLIC Antisolenoid system A. Bartalesi, M. Modena - CERN.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
Status of the Rebaselining D. Schulte for the Rebaselining Team D. Schulte, CLIC Rebaselining, October 2013.
LCWS2004 Paris 1 Beam background study for GLC Tsukasa Aso, Toyama College of Maritime Technology and GLC Vertex Group H.Aihara, K.Tanabe, Tokyo Univ.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
1Frank Simon ALCPG11, 20/3/2011 ILD and SiD detectors for 1 TeV ILC some recommendations following experience from the CLIC detector study
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
Interaction Region & IR integration EDR Planning Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting 13 October 2007.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
MDI towards technical design Lau Gatignon. Very preliminary ! To trigger discussions.
Interaction between Detector and Accelerator Final goal of IR Design is a maximum of useful data on tape In general: There is no clear Boundary between.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
1http:// Lucie Linssen LCWS /3/2010 SiD and CLIC Outline: Adaptation of SiD detector for CLIC Use of SiD software for CLIC Tracking.
An Hybrid QD0 for SID ? Marco Oriunno (SLAC), Nov. 14, 2013 LCWS13, TOKYO.
Introdcution to Workpackage/Activity Reflection D. Schulte.
16 February 2009CLIC Physics & Detectors Konrad Elsener 1... some issues regarding the forward region... (“picking up” from Lucie Linssen, 29 Sept 2008)
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
Mokka simulation studies on the Very Forward Detector components at CLIC and ILC Eliza TEODORESCU (IFIN-HH) FCAL Collaboration Meeting Tel Aviv, October.
LHC Interaction Region Upgrades and the Machine- Experiment Interface Emmanuel Tsesmelis CERN TS/LEA CARE-HHH-APD Mini-Workshop IR'07 Frascati 8 November.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
FCC-ee Interaction Region design
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
Machine Detector Interface
Beam Delivery Systems and the Machine-Detector Interface Terms of Reference for the CLIC-ILC Collaboration Working Group B. Parker (BNL), D. Schulte.
Layout of Detectors for CLIC
Machine-Experiment Interface
CLIC detector at SiD meeting 28/3/2010
The MDI at CEPC Dou Wang, Hongbo Zhu, Huamin Qu, Jianli Wang, Manqi Ruan, Qinglei Xiu, Sha Bai, Shujin Li, Weichao Yao, Yanli Jin, Yin Xu, Yiwei Wang,
CLIC Study Aim Conceptual design report in 2010
Other beam-induced background at the IP
CLIC-ILC BDS & MDI work.
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
CLIC Detector CERN Status + plans
CLIC damping rings working plan towards the CDR
Some of the Points Raised During my JLAB Visit
Crab Crossing Named #1 common technical risk (p. 6 of the report)
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008

Mandate of MDI Working Group The CLIC Machine Detector Interface (MDI) Working Group provides a forum where those technically responsible for issues at the interface between the machine and experiments can meet and discuss matters of mutual interest in preparation for the CLIC Conceptual Design Report. The subjects treated cover technical items of common importance to the machine and experiments and include, but not limited to, the specification of the experimental areas, the experimental beampipes and vacuum, the estimation of the machine-induced background at the particle detectors, the radiation shielding and monitoring, the instrumentation in and around the particle detectors required to measure beam parameters, the data exchange and common safety issues. The Working Group will also provide a forum to discuss issues of common interest for the machine and detector, such as the machine performance (luminosity and background measurement and monitoring) for the experiments. The Working Group acts in close collaboration with other CLIC working groups (Civil Engineering & Services WG, Beam Dynamics & Beam Delivery WG, Physics & Detector WG, and the Stabilisation WG) and reports to the CLIC Technical Committee.

Organization Membership  Co-Chairpersons : D. Schulte & E. Tsesmelis  Beam Delivery System design – R. Tomas Garcia  Machine-induced background – H. Burkhardt  Collimation system – F. Zimmermann  Luminosity performance simulations – J. Resta-Lopez  Design and integration of spent beam line – K. Elsener, V. Ziemann  Experimental beam pipe & vacuum – R. Veness  Representatives from relevant CTC WGs Civil Engineering & Services WG - J. Osborne Beam Dynamics & Beam Delivery WG - D. Schulte Physics & Detector WG - A. Gaddi Stabilisation WG – C. Hauviller Regular meetings planned at a monthly frequency. Work together with ILC in areas of synergy.

Luminosity & Luminosity Spectrum

Introduction

Impact of Luminosity Spectrum

Beamstrahlung & Luminosity Optimisation

Reduction of Incoming Energy Spread

Luminosity Spectrum Reconstruction

Backgrounds

Background Sources

Machine Background

Coherent Pairs

Incoherent Pair Production

Impact of the Pairs on Vertex Detector

Mask Design

Inner Mask

Hadronic Background

Hadronic Events

Luminosity & Background Summary

Background Reduction / Spectrum Improvement

Muon Background

Muon Rates

Simulation Tools

Interaction Region

Interaction Region Lay-out Distance L* between final quadrupole and IP is being evaluated  L* < 3.5. m. compromises luminosity  3.5 < L* < 4.3 m. yields similar luminosity Design of final focusing doublet is challenging  High gradient required.  Mechanical supports need to be very stable due to vibrational transmission from detectors.  A first design of a permanent magnet has been done (S. Russenschuck et al.) Superconducting quadrupoles very challenging due to stability issues but would allow energy adjustments Perhaps some hybrid approach should be studied.

Push-Pull Scenario Baseline scenario assumes two particle detectors that share occupancy of the interaction point in push-pull mode.  Keep a two-beam delivery system under conceptual investigation while detailed engineering study of push-pull mode is on-going. The two particle detectors and associated infrastructure/services should be arranged in such a way as to facilitate a rapid change-over. Engineer the mechanical particle detector concept for push-pull capability.  Access to the inner components of the particle detector (e.g. vertex detector).  Maintenance of internal alignment of the particle detector and need to avoid recalibration after a move.  Ability to service the various superconducting elements of the particle detector during and after a move. Design of underground experiment cavern should be such that one particle detector can be serviced while the other one is running.

Beam Delivery System Elements of the BDS in close proximity to the particle detectors require careful engineering and integration.  Magnet systems (final focusing, corrector, kicker, extraction line), beam instrumentation, and crab cavities.  Connection of magnet cryostat(s) with the particle detector.  Support of the magnets while minimising the vibration transmission between the magnets and the particle detector. Depends on type of magnets (permanent vs. pulsed).

Spectrometer Magnetic Fields Main problem is coupling of the beams to the spectrometer solenoid field.  Due to crossing angle.  Yields statistical energy fluctuations. Previous studies showed that 4 T are the acceptable limit for 20 mrad. Currently including the detector solenoid field into the main beam tracking code PLACET.  End fringe fields are of particular importance.  The as-measured CMS solenoid magnetic field is being used.

CLIC-ILC MDI Collaboration

Terms of Reference Within the overall framework of strengthening the collaboration and synergy between CLIC and ILC, the Beam Delivery Systems and Machine Detector Interface Working Group provides a forum where those technically responsible for the beam delivery systems and for the issues at the interface between the machines and experiments from the ILC and CLIC projects can meet and discuss issues of mutual interest. The subjects treated cover everything of common importance to the machines and experiments and includes, but not limited to, the machine performance for the experiments, the design and integration of the beam delivery system and the corresponding interaction regions and experimental areas, the experimental beampipes and vacuum, the radiation shielding and monitoring, the collimation system, the beam instrumentation, the luminosity and background measurement and monitoring, the mechanical supports and stabilisation, the design of the near-beam forward detectors, the data exchange and common safety issues. The Working Group will endeavour to develop and use common standards and codes and undertake common studies. The Working Group reports to both the CLIC and ILC Project Managements.

Topics of Common Interest  Experimental area lay-out and design. Infrastructure/services, push-pull mode, crossing angle.  Experimental beam pipe and vacuum system.  Final focusing magnets.  Background and luminosity studies. Common simulation tools. Studies of machine-induced backgrounds and mitigation strategies. Study of beam-beam background and luminosity spectrum.  Masking system.  Spectrometer magnet design and field.  Forward calorimetry.  Support, stabilisation and alignment of machine elements inside particle detector.

CLIC-ILC MDI Collaboration Alain Herve et al.

Summary and Conclusions Machine-detector interface considerations/studies are central to CLIC.  An MDI WG has thus been set up to co-ordinate such studies. Work on the MDI is on-going in the following areas:  Lay-out of the interaction region  Study of backgrounds  Luminosity spectrum  Integration of machine elements inside the particle detectors Additional help in issues of the MDI is most welcome.