G. Trad on the behalf of the BSRT team LHC BI 2015 summary 13/11/2015.

Slides:



Advertisements
Similar presentations
Observation of beam halo with corona graph
Advertisements

ECFA-DESY workshop, NIKEF 1 st April, 2003Nick Walker, DESY Energy Spread Measurement in the TESLA Extraction Line Nick Walker - DESY.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
BSRT Optics Design BI Days 24 th November 2011 Aurélie Rabiller BE-BI-PM.
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
Non-Contact Photothermal Multilayer Thickness Measurement Christian.
Recent Progress in X-ray Emittance Diagnostics at SPring-8 S. Takano, M. Masaki, and H. Sumitomo * JASRI/SPring-8, Hyogo, Japan SES, Hyogo, Japan *
BROOKHAVEN SCIENCE ASSOCIATES BIW ’ 06 Lepton Beam Emittance Instrumentation Igor Pinayev National Synchrotron Light Source BNL, Upton, NY.
SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo.
1/10 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 10, 2006) Phase.
Tests of AWAKE spectrometer screen and camera at PHIN Introduction Layout Procedure Setup, results (runs 1 – 5) Conclusions L. Deacon, S. Mazzoni, B. Biskup.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
BSRT CALIBRATION MD SUMMARY LSWG #6-15/09/2015 BSRT TEAM.
Tests of spectrometer screens Introduction Layout Procedure Results Conclusions L. Deacon, B. Biskup, S. Mazzoni, M.Wing et. al. AWAKE collaboration meeting,
PyHEADTAIL-PyECLOUD Simulations for LHC and HL- LHC Aaron Axford 27/05/20151.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
LHC BI 2015 Summary: BSRL M. Palm (BE-BI-PM)
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
Charles University Prague Charles University Prague Institute of Particle and Nuclear Physics Absolute charge measurements using laser setup Pavel Bažant,
New emittance monitor beamline
LHC LHC performance with low-emittance h=9 beam Focus on emittance preservation M. Kuhn, H. Bartosik, B. Dehning, A. Guerrero Ollacarizqueta, V. Kain,
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
SL/BI 16/05/1999DIPAC’99 -- JJ Gras -- CERN SL/BI -- Adaptive Optics for the LEP 2 SR Monitors G. Burtin, R.J. Colchester, G. Ferioli, J.J. Gras, R. Jung,
BSRT UPDATE LMC 02-OCT-2012 F.Roncarolo on behalf of the BSRT team W.Andreazza, E.Bravin, A.Boccardi, J-J.Gras, A.Goldblatt, M.Hamani, T.Lefevre, R.Jones,
BI MD# BSRT Measurements Beam 1 and 3.5 TeV 2 bunches with different emittances Bumps: -4, -2,0,2,4 mm Results: 3.5TeV.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
MD377 Schottky diagnostic M. Wendt, M. Betz, T. Lefevre.
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
(Towards a) Luminosity model for LHC and HL-LHC F. Antoniou, M. Hostettler, Y. Papaphilippou, G. Papotti Acknowledgements: Beam-Beam and Luminosity studies.
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
LHC LHC Wire Scanners: Updates on Measurement Accuracy Emittance Meeting 18 November 2015 Maria Kuhn – 18 November 2015 Many thanks to G. Baud, E. Bravin,
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
G. Trad on the behalf of the BSRT team Emittance meeting 04/11/2015.
LIU Day 2014 – M.Bodendorfer - LEIR model. LEIR model A plan for understanding/upgrading the LEIR performance limitations M.Bodendorfer BE/ABP & LEIR.
LHC Wire Scanner Calibration
Beam instrumentation MDs
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
1st LHC MD Period Started
LIU Wire Scanner Milestones June 2017
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
MD2243: Coronagraph commissioning at 6.5 TeV
E. Bravin, A. Goldblatt, S. Mazzoni, F. Roncarolo, M. Palm
LIU Beam Wire Scanners: Status and plans for new SPS and PSB BWS
Summary of the dedicated MD on July 4th 50ns in SPS with nominal and low γt optics – transverse aspects T. Argyropoulos, H. Bartosik, T. Bohl, A. Burov,
MD2036: UFO dynamics studies and UFO fast detection
Emittance growth AT PS injection
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Lebanese Teacher Programme 18/04/2017
DESY Summer Student report
Discussion on Emittance Evolution through FCC-e+e-
LHC Emittance Measurements and Preservation
Luminosity Optimization for FCC-ee: recent results
Thursday morning – optics correction
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
LHC Morning Meeting - G. Arduini
MSWG Report – SPS OP Crew
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
I-LHC NOMINAL ions beam in 2007
Measurement of the beam (transverse) emittances
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
T. Mitsuhashi, John Flanagan G. Mitsuka
LHC BIF test setup - update
Presentation transcript:

G. Trad on the behalf of the BSRT team LHC BI 2015 summary 13/11/2015

2 G. Trad- LHC BI 2015 summary  Introduction  BSRI  Hartmann Mask  Conclusions and Outlook

3 G. Trad- LHC BI 2015 summary

4 HARTMANN MASK LINE BSRI

5 G. Trad- LHC BI 2015 summary Working Principle

6 G. Trad- LHC BI 2015 summary Working Principle Installed Mask

7 G. Trad- LHC BI 2015 summary 1 train of 144 bunches At Injection

8 G. Trad- LHC BI 2015 summary 2 train of 144 bunches At Injection

9 G. Trad- LHC BI 2015 summary 4 trains of 144 bunches At Injection

10 G. Trad- LHC BI 2015 summary 4 trains of 144 bunches At Flattop 0.5 ms exposure

11 G. Trad- LHC BI 2015 summary 4 trains of 144 bunches At Flattop 1 ms exposure

12 G. Trad- LHC BI 2015 summary 4 trains of 144 bunches At Flattop 3 ms exposure

13 G. Trad- LHC BI 2015 summary 4 trains of 144 bunches At Flattop 10 ms exposure

14 G. Trad- LHC BI 2015 summary No Additional Deformation of the extraction mirror linked to Intensity and number of bunches. While checking with Hartmann mask, Abort gap values are compromised. No possible conclusion on deformation linked to energy since SR enters the system with different angle. Studies working on absolute value of deformation of the mirror itself independent of SR.

15  Comparing BSRT optical system vs BSRI optical system (in imaging) N.B: BSRI system could be further optimized finding an optimum focusing point. However it requests additional calibration time Vertical Spread reflects the instrument precision G. Trad- LHC BI 2015 summary

16  Comparing BSRT optical system vs BSRI optical system (in imaging) N.B: BSRI system could be further optimized finding an optimum focusing point. However it requests additional calibration time BSRT BSRI H MAG:68.8 µm/px 10.9 µm/px LSF: µm 348 µm V MAG:76.4 µm/px 10.7 µm/px LSF: 228 µm 293 µm During last MD a performance comparison was foreseen between the NUV BSRT imaging and the visible one. Unfortunately was not successful. G. Trad- LHC BI 2015 summary

17 G. Trad- LHC BI 2015 summary Step 1: Waiting for the design of the double slits to be finalised produced and assembled assembly, we Installed only Slits allowing vertical beam size measurements. Laser Printed Slits on aluminium plate

18 G. Trad- LHC BI 2015 summary Step 2: Prototype of the new assembly installed for horizontal size measurement. A bit complicated with many degree of freedom and will be optimized

19 G. Trad- LHC BI 2015 summary Final Assembly: During Xmass Shutdown, will all be replaced by the final design

20  Vertical beam size measurement by interferometry Bunch 0 Bunch 1785 Data acquired at the end calibration studies (F-4513), with a small emittance bunch (0) and a blown up bunch (1785) Slit scan from D=3mm to D=21 mm G. Trad- LHC BI 2015 summary

21  Vertical beam size measurement by interferometry σ = 185/200 µm Instead of σ = 320/450 µm !!! G. Trad- LHC BI 2015 summary

22  BSRI not yet able to provide a beam size measurement  Further studies are required to disentangle several effects on the visibility measurement (flatness of optics, slits parameter uncertainty, misalignment, out of focus)  Hartmann Mask within the uncertainty of the technique showed no deformation of the mirror linked to the increase of beam intensity (bunch number)  Investigating the possibility of extraction mirror deformation measurement (beam independent, multi layer coating dependent) G. Trad- LHC BI 2015 summary