800 MHz Rebanding: An Overview

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Proposed Transportation Funding Policy Changes Fairfax County Department of Transportation March.
Advertisements

Key Technical Provisions of the White Paper and Protections Afforded to ITFS Licensees. National ITFS Association Annual Conference February 16 th – 19.
 800 MHz Transition Administrator, All rights reserved. 800 MHz Re-banding for Public Safety NPSPAC Region 39 Nashville, Tennessee September 15,
1 Improving Public Safety Communications in the 800 MHz Band (WT Docket No ) Catherine W. Seidel, Deputy Chief Wireless Telecommunications Bureau.
State of Indiana Integrated Public Safety Commission Federal Communications Commission Mandated 800 MHz Rebanding Project.
 800 MHz Transition Administrator, All rights reserved MHz Reconfiguration National Spectrum Managers Association (NSMA) May.
Exhibit A. 806 TV Broadcast Ch FCC Spectrum Allocation of 800 MHz Band * MHz Interleaved Band (including Bus/ILT/PS/SMR) 300 Channels.
Incentive Auction Overview [DATE]. 2 What are Spectrum Incentive Auctions? Incentive auctions are a voluntary, market-based means of repurposing spectrum.
VHF/UHF Narrowbanding Georgia Webinar March 1, 2012 Federal Communications Commission Public Safety and Homeland Security Bureau.
William E. Ott EMS Summit August 25, 2006 Evolving Communications Technology.
FCC NPRM on 3G Todd D.Gray Dow, Lohnes & Albertson Counsel, National ITFS Association.
SCIP Conference Austin, Texas August 24, Migrating to Narrowband On July 2, 1991, The Commission released a Notice of Inquiry to gather information.
1 Kentucky’s Public Safety Awareness Initiative Program Spectrum Management January 00, 2005.
Upcoming FCC Spectrum Auctions Bryan N. Tramont Wilkinson Barker Knauer, LLP
Introduction and Overview Presentation by Dale N. Hatfield at the Radio Regulation Summit: Defining Out-of-Band Operating Rules Silicon Flatirons Center.
Intelligent Transport Systems (ITS) - Update on spectrum arrangements Spectrum arrangement options to support ITS in the MHz band in Australia.
New Federal Spectrum Access System - US 3.5GHz bands -
April 2009 doc.: IEEE /xxxxr0 May 2015
Florida Institute of technologies ECE 5221 Personal Communication Systems Prepared by: Dr. Ivica Kostanic Lecture 12: Frequency allocation and channelization.
TV Bands Database Administrators Meeting Implementation Update November 3, 2011 FCC Office of Engineering and Technology.
NBTC/ITU Workshop on Cross-Border Frequency Coordination June , 2015 Bangkok, Thailand.
Telecommunications Issues for Wind Power Facilities Interdepartment Radio Advisory Committee Presentation June 14, 2005.
Lucent Technologies 1 CDMA2000 HRPD For Public Safety Jim Chao & Kenneth Budka Lucent Technologies Lucent Technologies grants a free, irrevocable license.
Wireless Broadband Service in Rural America Rural TeleCon ‘06 October 24, 2006 Paul D’Ari Spectrum Competition and Policy Division Federal Communications.
800 MHz Realignment Retuning Methodology. Proposed FCC 800 MHz Realignment Plan (Non-Border Areas) MHz Cellular A & B Band 700 MHz.
A;sldkfj1 Wireless Telecommunications Bureau Agenda Meeting January 13, 2005.
Wireless Telecommunications Bureau (WTB) Licensing System Overview May 19,
1 Software Radio Enabling Dynamic Spectrum Management.
Overview of Service Rules and Due Diligence Dwain Livingston Senior Engineer Mobility Division, WTB November 1, – 1990 MHz BROADBAND PCS Auction.
700 MHz Transition Presented by: Bob Stephens Public Safety Working Group February 15, 2002.
A View from the FCC’s Office of Engineering & Technology NSMA Spectrum 2008 May 21, 2008 Julius P. Knapp Chief Office of Engineering and Technology Federal.
1 Wireless Telecommunications Bureau Agenda Meeting January 20, 2006.
APCO Western Regional Long Beach, CA March 1, MHz Issues Robert Gurss APCO Director of Legal & Government Affairs (202) ,
Overview of Service Rules: Technical Issues Phase II 220 MHz Service (Auction No. 72) Gary Devlin Engineer, Mobility Division Wireless.
Public Safety and Homeland Security Bureau Annual Report—2007 Presentation to the Commission January 17, 2008.
Wireless Roundup Spectrum Management 2007 NSMA Presented by David Meyer May 22, 2007.
Doc.: 18-12/108r0 Submission October 26, 2012 Slide 1 FCC TV Band Incentive Auction: Impact on Unlicensed Operation Notice: This document has been prepared.
1 Public Safety and Homeland Security Bureau Report: Presentation to the Commission January 15, 2009.
Slide 0 National Spectrum Managers Association Industry Round Table: Fixed Service Mitchell Lazarus | May 22, 2007.
Overview of Service Rules and Due Diligence Keith Harper Electronics Engineer Mobility Division, WTB March 7, 2007 BROADBAND PCS Auction No. 71 Seminar.
VHF/UHF Narrowbanding Region IX Webinar March 13, 2012 Federal Communications Commission Public Safety and Homeland Security Bureau.
Technical Issues, Due Diligence and Licensing Parameters Keith Harper Engineer Mobility Division, WTB June 10, 2008 Auction 78 Seminar BROADBAND PCS.
1 WiMAX and the Canadian Radio Spectrum April 28, 2006 Angela Choi Communications Engineer Pacific Region Industry Canada
Public Safety and Homeland Security Bureau 2006 Annual Report January 17, 2007.
700 MHz Public/Private Partnership Upper D Block.
International Bureau 2006 Annual Report January 17, 2007.
Marty Stern, Partner K&L Gates LLP Broadcast Spectrum Reallocation: With Change Comes Real Opportunity.
Doc: IEEE Submission January 2013 Hernandez,Li,Dotlić, Miura (NICT)Slide 1 Project: IEEE P Working Group for Wireless Personal.
FCC Public Safety Regulatory Update IGA State and Local Government Webinar May 2, 2012 Federal Communications Commission Public Safety and Homeland Security.
VHF/UHF Narrowbanding Region X Webinar March 15, 2012 Federal Communications Commission Public Safety and Homeland Security Bureau.
Overview of Service Rules: Technical Issues Gary Devlin Engineer Mobility Division, WTB December 3, MHz SMR Auction No. 55 Seminar.
Air-to-Ground Mobile Broadband on Aircraft FM48#10 - Info 002.
Spectrum Sharing in 3.5 GHz Band
National Public Safety Telecommunications Council Regulatory Update Bette Rinehart.
Innovation, Science and Economic Development Canada (ISED) 600 MHz Repurposing RABC 600 MHz Working Group Meeting Innovation, Science and Economic Development.
Agenda item 1.16 VHF data exchange system (VDES).
Promoting Spectrum Access for Wireless Microphone Operations.
ITFS Becomes EBS New Rules and New Band Plan Presented by Edwin N. Lavergne February 15, 2005.
Basics of the U.S. Table of Frequency Allocations
Exhibit A.
700 MHz Regulatory Update June 11, 2007
Basics of the U.S. Table of Frequency Allocations
700 MHz Narrowband Channel Relocation Plan
600 MHz – Proposed TV Transition Objectives and Methodology
November 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: FCC TV Band Incentive Auction: Impact on.
November 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: FCC TV Band Incentive Auction: Impact on.
Combine Licensing of 800 MHz and 2.6 GHz Band
NRPC WACN/SYSTEM ID ASSIGNMENT PROCESS
Presentation transcript:

800 MHz Rebanding: An Overview David Furth Associate Bureau Chief Public Safety and Homeland Security Bureau March 21, 2007

Outline How Did We Get Here? The Interference Problem The Rulemaking The Transition What’s Next?

History of the 800 MHz Band Established in the 1970s for land mobile use (reallocated from UHF-TV) Intended to relieve crowding of lower band land mobile frequencies Channels allocated for mixture of services Public Safety Business Radio Industrial/Land Transportation (e.g., utilities) Specialized Mobile Radio (commercial service)

SMR, B/ILT, Public Safety Interleaved 800 MHz -- Old Band Plan 806 824 746 747 762 764 849 851 A C D B A B A B Upper 700 MHz Commercial (30 MHz) 700 MHz Public Safety (24 MHz) 800 MHz Band Cellular (50 MHz) ATG 776 777 792 794 894 896 = 700 MHz Guard Band 806 809.75 816 821 824 Channels 1-120 SMR/General Category NPSPAC (Public Safety) SMR, B/ILT, Public Safety Interleaved ESMR 851 854.75 861 866 869 SMR/General Category -7.5 MHz 150 Channels Licensed by EA Blocks of 25 channels (SMR) Some Incumbent Operators Remain (includes Business, I/LT, and Public Safety) Interleaved Spectrum -12.5 MHz 250 Channels 80 SMR Channels (Licensed by EA, Some Incumbent Operators Remain) 70 Public Safety Channels 50 Business Channels 50 Industrial/Land Transportation Channels ESMR/Upper 200 – 10 MHz 200 Channels Licensed by EA A few non-EA incumbents remain; most were relocated or acquired in late 1990s. NPSPAC - 6 MHz 225 Channels @ 12.5 kHz spacing 5 Channels @ 25 kHz spacing 5 Mutual Aid Channels

Outline How Did We Get Here? The Interference Problem The Rulemaking The Transition What’s Next?

Interference Problem Mid-1990s – Nextel starts to deploy cellular-architecture “ESMR” in the 800 MHz band Public safety also expands into 800 MHz as lower bands grow congested Late 1990s -- 800 MHz public safety systems encounter increasing interference and “dead zones” Problem traced to Nextel as well as cellular carriers operating in adjacent spectrum

Interference Problem Caused by incompatible system architecture on adjacent channels Public safety systems use “high-site” architecture -- small number of base stations with high antennas to maximize signal propagation Commercial systems use “low-site” cellular architecture -- numerous cells with low antennas to allow frequency reuse Interference occurs when a mobile user on a high-site system moves far from its own base station but near a low-site commercial base station Interleaved band plan exacerbates problem

Strong signal from cell site from public safety base station Near/Far Problem “Near/far” problem – First responder is near the CMRS cell site and far from its own base station Public Safety Base Station CMRS Cell Site Strong signal from cell site 10 MILES Weak signal from public safety base station 2500 FEET Result: Signal from cell site overloads public safety handset

Public Safety Dead Spots + PUBLIC SAFETY STATION + Dead spots near CMRS cell sites – first responders cannot hear public safety communications + +

Outline How Did We Get Here? The Interference Problem The Rulemaking The Transition What’s Next?

Early Proposals Best Practices Guide (2000) -- voluntary measures to reduce interference Nextel White Paper (2001) – proposes rebanding as a solution 800 MHz NPRM (2002) – seeks comment on rebanding and non-rebanding alternatives “Consensus Proposal” (2002) – Revised rebanding plan proposed by coalition of 800 MHz stakeholders, including Nextel and several public safety organizations

800 MHz Report and Order Adopted in July 2004 Commission adopts a two-pronged solution to the interference problem New rules for protection of public safety systems from interference by commercial systems Rebanding to separate public safety and other high-site systems from cellular systems. Commission’s rebanding plan incorporates some elements of the Consensus Proposal but also has new and additional elements

SMR, B/ILT, Public Safety Interleaved 800 MHz -- Old Band Plan 806 824 746 747 762 764 849 851 A C D B A B A B Upper 700 MHz Commercial (30 MHz) 700 MHz Public Safety (24 MHz) 800 MHz Band Cellular (50 MHz) ATG 776 777 792 794 894 896 = 700 MHz Guard Band 806 809.75 816 821 824 Channels 1-120 SMR/General Category NPSPAC (Public Safety) SMR, B/ILT, Public Safety Interleaved ESMR 851 854.75 861 866 869 SMR/General Category -7.5 MHz 150 Channels Licensed by EA Blocks of 25 channels (SMR) Some Incumbent Operators Remain (includes Business, I/LT, and Public Safety) Interleaved Spectrum -12.5 MHz 250 Channels 80 SMR Channels (Licensed by EA, Some Incumbent Operators Remain) 70 Public Safety Channels 50 Business Channels 50 Industrial/Land Transportation Channels ESMR/Upper 200 – 10 MHz 200 Channels Licensed by EA A few non-EA incumbents remain; most were relocated or acquired in late 1990s. NPSPAC - 6 MHz 225 Channels @ 12.5 kHz spacing 5 Channels @ 25 kHz spacing 5 Mutual Aid Channels

800 MHz – New Band Plan 806 824 746 747 762 764 849 851 A C D B A B A B Upper 700 MHz Commercial 700 MHz Public Safety 800 MHz Band Cellular ATG 776 777 792 794 894 896 = 700 MHz Guard Band 806 824 809 815 816 817 866 NPSPAC (Public Safety) 854 Public Safety B/ILT Non-Cellular SMR 866 Expansion Band ESMR 869 Guard Band 862 851 854 860 861 862 869 Nextel and other ESMRs occupy upper band segment, adjacent to Cellular band Public safety and other high-site systems occupy lower band segment, adjacent to 700 MHz public safety Guard Band and Expansion Band serve as buffers

Post-Rebanding – More Public Safety Spectrum NPSPAC (Public Safety) SMR, B/ILT, Public Safety Interleaved ESMR Expansion Band Guard Band Interleaved spectrum vacated by Nextel is available exclusively to public safety for 3 years After 3 years, vacated spectrum is also opened to Critical Infrastructure for an additional 2 years Other interleaved spectrum available on pool channel basis

800 MHz Report and Order Awards 10 MHz of spectrum in the 1.9 GHz band to Nextel Spectrum is compensation for Nextel paying relocation costs and relinquishing a portion of its 800 MHz spectrum to benefit public safety. Nextel must clear Broadcast Auxiliary Service (BAS) licensees from the 1.9 GHz band Requires Nextel to make a “windfall” payment to the U.S. Treasury if value of the 1.9 GHz spectrum (calculated at $4.8 billion) is greater than: Relocation costs paid by Nextel, plus Value of Nextel’s relinquished 800 MHz spectrum

800 MHz Report and Order Requires Nextel to pay all relocation costs incurred by public safety and other 800 MHz incumbents Costs must be reasonable, but no ceiling on total amount Relocating licensees must receive “comparable facilities” Provides for a 36-month transition to the new band plan Provides for creation of the 800 MHz Transition Administrator (TA) to administer the transition and audit expenditures

Subsequent Orders 800 MHz Supplemental Order (adopted December 2004) Modified the 18-month benchmark requiring Nextel to relocate Channel 1-120 licensees Increased the credit to Nextel for relinquishing 800 MHz spectrum 800 MHz Reconsideration Order (adopted October 2005) Modified eligibility rules for relocating to the ESMR band Affirmed Commission’s authority to award the 1.9 GHz spectrum to Nextel

Preparation for Transition Sept-Oct 2004 -- Transition Administrator selected January 2005 -- TA develops region-by-region rebanding schedule February 2005 -- Nextel accepts 800 MHz R&O conditions (Sprint affirms post-merger) March 2005 – WTB approves schedule June 2005 – Transition begins

Outline How Did We Get Here? The Interference Problem The Rulemaking The Transition What’s Next?

Transition Process The 800 MHz R&O established a 36-month transition process The 36-month clock started on June 27, 2005, and ends on June 26, 2008 Transition is divided into two stages Stage 1 – Relocation of Channels 1-120 Stage 2 – Relocation of NPSPAC Transition is divided into four geographic waves

Rebanding – Stage 1 Channels 1-120 -- SMR/General Category NPSPAC (Public Safety) SMR, B/ILT, Public Safety Interleaved ESMR Expansion Band Guard Band Channel 1-120 Non-ESMR systems move to the Interleaved Band (Nextel vacates interleaved channels) Channel 1-120 ESMR Systems (non-Nextel) move to the ESMR Band Expansion and Guard Bands cleared Nextel can remain in the Non-ESMR spectrum until Phase II

SMR, B/ILT, Public Safety Interleaved Rebanding – Stage 2 Channels 1-120 SMR/General Category NPSPAC (Public Safety) SMR, B/ILT, Public Safety Interleaved ESMR Expansion Band Guard Band Nextel vacates Channels 1-120 NPSPAC licensees move down 15 megahertz to new NPSPAC Band Nextel moves into old NPSPAC Band Nextel vacates remaining channels in Interleaved Band

Transition Waves 1-4

Negotiations and Mediation Nextel and each licensee must negotiate a Frequency Relocation Agreement (FRA) Time period for negotiations 3-month voluntary negotiation period 3-month mandatory negotiation period Mediation If negotiations fail, Nextel and the licensee enter into a 30 working-day mediation period with a TA-designated mediator Mediation can be extended under some circumstances Referral to PSHSB If the parties fail to reach a mediated agreement, the TA refers the case to PSHSB, which has delegated authority under the 800 MHz R&O to rule on disputed issues de novo

Negotiation Period Begins Negotiation Periods Waves (in chronological order) No. of Licensees Negotiation Period Begins Mediation Begins Wave 1 (1-120) 383 6/27/05 12/27/05 Wave 2 (1-120) 234 10/3/05 4/3/06 Wave 3 (1-120) 301 1/3/06 7/3/06 Wave 1 (NPSPAC) 401 2/1/06 11/1/06 Wave 4 (1-120) 160 4/3/07 (Postponed) Wave 2 (NPSPAC) 289 8/1/06 2/1/07 Wave 3 (NPSPAC) 237 5/1/07 Wave 4 (NPSPAC) 196 8/1/07

Stage 1 (Channels 1-120) Relocation Progress Substantial progress has been made in Waves 1-3 negotiations and mediations Physical relocation of Channel 1-120 incumbents is now under way Small number of cases remain open Some licensees with both Channel 1-120 and NPSPAC systems want to relocate all in Stage 2

Stage 2 (NPSPAC) Relocation Progress More complex and time-consuming than Stage 1 NPSPAC has more large, complex public safety systems, more interoperability relationships among licensees Significant time needed for relocation planning by NPSPAC licensees Large number of cases in extended mediation

Wave 4 Border Issues

Wave 4 Border Issues Rebanding in Wave 4 border regions must conform to cross-border spectrum agreements with Canada and Mexico Existing bilateral agreements limit U.S. access to the 800 MHz band in border areas Modifications to agreements are needed for Wave 4 band plan to be consistent with rest of U.S. Commission staff is discussing possible changes to existing agreements with Canadian and Mexican regulators Working in coordination with State Department Bureau has extended Wave 4 timeline to allow time for international issues to be resolved

PSHSB Role in Rebanding Rebanding implementation is a major priority for PSHSB Bureau has delegated authority to rule on disputed issues de novo Has issued five orders in individual cases to date Has issued orders and PNs on issues affecting multiple cases (e.g., ability of public safety licensees to exchange information regarding negotiations with Nextel) Bureau works closely with all major stakeholders to track progress and resolve issues informally

Outline How Did We Get Here? The Interference Problem The Rulemaking The Transition What’s Next?

What’s Next Pending Reconsideration Petitions Stage 2 Scheduling Issues Additional Mediation Cases Negotiations with Canada and Mexico Nextel Network Cost Issues Post-Rebanding Licensing Issues