Bump-bonding: offers F. Marchetto INFN-Torino Technical specification doc has been prepared: Ferdinand, myself, with the help of Alex, Petra and Massimiliano.

Slides:



Advertisements
Similar presentations
3 rd Financial Managers Seminar Brussels 19 May 2010 Eligibility period and reporting eligible expenditure.
Advertisements

STEP 1 ARRIVAL OF MERCHANDISE AND DOCUMENTATION The merchandise arrives at the broker's terminal on the U.S. side of the border. The commercial invoice.
 Fulfillment of Contractual obligations within the stipulated time frame is the essence of any contract.  LIQUIDATED DAMAGES (LD) are charged as a compensation.
HPK FPIX & BPIX sensor research summary at Purdue E. Alagoz 1, M. Bubna 1, A. Krzywda 1, K. Arndt 1, D. Bortoletto 1, I. Shipsey 1, G. Bolla 1, S. Kwan.
QUAD MODULE TESTING 18 th January 2013 Kate Doonan University of Glasgow.
Financial Management and Auditing First Level Controls 3 rd round operations Rostock, Elise Oukka.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Payment Systems The Wire Transfer System. Basic Concepts Method for transferring a credit initiated by the sender of the credit. It does not refer to.
2.A. Budgeting and Payment Procedures for All other Types of Contracts
Plans for Demonstrator Flip Chip Bonding GTK meeting 9/12/08 1.
REPLACEMENT AND MAINTENANCE OF LIFTS GIVING ACCESS TO LHC UNDERGROUND AREAS TENDERING PROCEDURE IT-4056/EN 105 December 2014 Floris Bonthond.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3972/EN PROVISION OF MAINTENANCE SERVICES ON INDUSTRIAL TRUCKS ON THE CERN SITE Insert.
Invitation To Tender Procedure IT – 4005/en Provision of engineering studies and drawings, the supply and installation of piping and its accessories.
TENDERING PROCEDURE IT- 3927/EN
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4123/EN Supply, Replacement and Repair of Crane Rails.
FPIX_flip_chip_test module calibration tests November 14 th 2012.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke.
Purchasing Supplies at CERN
Financial Management MW-Sonet 16 th – 19 th of March 2011, Turkey.
Bump-bonding: Invitation to tender F. Marchetto INFN-Torino Technical specification doc has been prepared: Ferdinand, myself, with the help of Alex, Petra.
Tacis Contracting Procedure Documents to be submitted together with the application:  Original Declaration by the Financial Lead Partner for Tacis  Partnership.
HPD Development Project is DONE! The Future is Quality assurance Database management Alignment Production of cookies and mounts Electronics interfacing.
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
Foundry Characteristics
Update on Micron productions - Comparison of AC & DC coupled devices - Marko Milovanovic*, Phil Allport, Gianluigi Casse, Sergey Burdin, Paul Dervan, Ilya.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
Roadmap to the next 2015 run F. Marchetto GigaTracKer Working Group meeting Dec. 9 th 2014 a)Introductory meeting on Nov. 27, 2014 b)At that meeting several.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
3D sensors for tracking detectors: present and future applications C. Gemme (INFN Genova) Vertex 2013, Lake Starnberg, Germany, September 2013 Outline:
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4134/EN/LHC Supply and Commissioning of HVAC Systems for Five LHC Surface Buildings B.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
Purchasing supplies at CERN Procurement Rules Someone FP-PI.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Timepix test-beam results and Sensor Production Status Mathieu Benoit, PH-LCD.
The medipix3 TSV project
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
Workshop on Appraisal of Disassembled Magnets: Lessons learned March 17 th, 2005 Boundary Conditions-Technical Specification Jos Vlogaert.
Grid Pix Field Simulations and precision needed for a module Peter Kluit, Jan Timmermans Prepared 16 May 2016.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4142/EN Supply, Installation, Testing and Commissioning of the HVAC System for the.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Page 1 Liverpool January 11th, 2012 LHCb Upgrade Meeting Planar Silicon Detectors I. Tsurin Generic sensor R&D ATLAS-oriented commitments LHCb-oriented.
Sensors Pixel dimension 300 x 300 μm2 Standard p-in-n sensors
Chapter 16 using math in sales Section 16.1 Sales Transactions
Financial Documents Bank Statement Purchase Order Credit Note
Administration of a FIDIC Contract - Project Control
Service Provider Training I July 25, 2017
INVITATION TO TENDER PROCEDURE IT-4344/EP Design, Supply, Installation, Testing and Commissioning of a Cleanroom extension for the integration of ATLAS.
Update on Bump Bonding GTK-Meeting Sep. 2, 2008 pr.
Invitation To Tender Procedure IT – 4327/SMB Technical specification for the civil Engineering works for the construction of the new building.
Highlights of Atlas Upgrade Week, March 2011
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
IT-4130/EN Bidders conference
TENDERING PROCEDURE IT-3981/EN
Sensor Wafer: Final Layout
Results from the first diode irradiation and status of bonding tests
IT-4328/EN Bidders conference
LSST Camera Detector Status
Reporting 25 April 2018.
Purchasing cycle Purchase request
Setup for testing LHCb Inner Tracker Modules
IT-4464/EN Bidders conference
Presentation transcript:

Bump-bonding: offers F. Marchetto INFN-Torino Technical specification doc has been prepared: Ferdinand, myself, with the help of Alex, Petra and Massimiliano It has been checked by the Laszlo Abel and Dante Gregorio of Contracts and IT Supplies Section (FP-PI-CO) Tender form has been prepared by Laszlo Abel It has been sent to IZM and VTT Both, IZM and VTT, replied with an offer June, 3rd 2013

IZM

3.2 Requirements for the Assembly Process These requirements are common to both assembly types, single-chip and full-detector: Bump bonding of silicon sensors to front-end chips with a pixel size of 300 µm x 300 µm and a bump pad of octagonal shape of 10 µm apothem (opening in the passivation). The arrangement of the bump pads should follow the scheme presented in Figure 7 and 8. The standoff height between chip and sensor after bump connection should be approximately µm. The handling and processing of the sensors should ensure that the leakage current characteristics allow a high voltage operation, without current breakdown and a total leakage current of less than approximately 8 nA/cm 2 at 20 °C and at the operating voltage of 700 V. The planarity of the external chip surface over the area corresponding to the sensor should deviate from flatness by less than 30µm. The wire bonding pads on the short edge of the read-out chips have to be fully accessible and wire-bondable after assembly and delivery. In order to comply with the physics requirements the yield of working pixels per final GTK assembly should exceed 99%. When polarized with the operating voltage (700 V) the assembly should withstand the voltage without discharge or breakdown. From the doc: Technical specification

4.4.2 Production-series The validation of the production items includes the following assessments, which are derived from the technical specification in section 3.2 a) the X-ray pictures showing the quality of the bonds; b) planarity measurements of the external chip surface over the area corresponding to the sensor, or in other terms the area where the bump-bonds are, showing a deviation from flatness smaller than 30µm; c) no discharges and breakdowns after 24 hours under with the full bias voltage (700 V) between sensor and chips and the leakage current remains within the requirements (8 nA/cm 2 at 20 °C); d) at least 100 temperature cycles in a climatic chamber swinging from 70 °C to -20 °C with a temperature gradient in the range of 3-5 °C /min to prove that the assemblies keep the required planarity and bump- bonds continuity; e) thickness verification (100µm) of the front-end chip with a Scanning Electron Microscope; f) wire bond pads clean and undamaged. From the doc: Technical specification

VTT

5.PAYMENT CONDITIONS 5.1The payment of any invoice by CERN shall be subject to the provision by the contractor of a bank guarantee for the performance of his obligations under the contract. The bank guarantee, in favour of CERN, shall be issued by a bank approved by CERN[1], for an amount corresponding to 10% (ten per cent) of the total amount of the contract and valid until expiry of the warranty of the last batch of the supply delivered. The bank guarantee shall be established using the template provided as Annex 1 of the General Conditions of CERN Contracts.[1] 5.2The total amount of the contract shall be paid by CERN thirty days following acceptance of the supply and receipt of a correct invoice and receipt of the bank guarantee stipulated here above. [1][1] Rating of BBB+ at least or equivalent,with proof of rating.