DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.

Slides:



Advertisements
Similar presentations
Readout of the ATLAS Liquid Argon Calorimeters John Parsons Nevis Labs, Columbia University Representing the ATLAS LAr Collaboration ATLAS.
Advertisements

Status of the ATLAS MM project
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
ATLAS MDT Electronics Status ● ASD Chip Design (with Harvard) and Production – Full Rad-Hard test campaign completed – Production order for 67,400 parts.
LAr Frontend Board PRR Introduction 1.Overview of FEB functionality 2.FEB performance requirements 3.Development and evaluation of FEB 4.Organization of.
Muon Week, Dec V. Polychronakos Page1 CSC Detector Control System V. Polychronakos, BNL.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
ATLAS Endcap Muon System WBS 3.5 Frank Taylor MIT M&O Request FY06 Toronto August 3, 2005 V1.1.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
P. Shanahan June 13, Near Detector Electronics Status Status Production Issues Peter Shanahan FNAL MINOS Collaboration Meeting June 13, 2003.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
Installation and Commissioning of the ATLAS LAr Readout Electronics
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
A Study of Proton-Proton Collisions at the LHC The Ohio State University - Task A.2 B.G. Bylsma, L.S. Durkin, D. Fisher, J Gilmore, J.H. Gu, D. Larson,
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
June 6, 2001 Paul O’Connor, BNL ATLAS Cathode Strip Chambers.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
Dec
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
1 Status report on the LAr optical link 1.Introduction and a short review. 2.The ASIC development. 3.Optical interface. 4.Conclusions and thoughts Jingbo.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
University of Wisconsin
LKr status R. Fantechi.
TileCal upgrade EVO meeting Demonstrator tesks
T1 Electronic status Conclusions Electronics Cards:
Mini-drawers, FE-ASIC , Integrator
F.Guber, A.Ivashkin INR, Moscow
MicroMegas Mechanical Meeting --- Cern April 2014
Pierluigi Paolucci - I.N.F.N. Naples
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003

DOE/NSF Review of U.S. ATLAS May 21-23, CSCs are the forward precision muon system of ATLAS 32 four-layer chambers 2.0 < |  | < 2.7 |Z| ~ 7m, 1 < r < 2 m 4 gas gaps per chamber 31,000 channels 32 four-layer chambers 2.0 < |  | < 2.7 |Z| ~ 7m, 1 < r < 2 m 4 gas gaps per chamber 31,000 channels IP

DOE/NSF Review of U.S. ATLAS May 21-23,  Mechanics:  32 chambers  Gas system  Electronics enclosure  HV power  Electronics  On-detector:  32 x 5 = 160 sets of ASM boards  160 x 3 = 480 optical links  LV power & cooling  Calibration system  Off-detector:  16 RODs  TTC, trigger/DAQ interface  Software CSC Deliverables BNL Physics Dept. BNL Instrumentation Div. UCI Physics Dept.

DOE/NSF Review of U.S. ATLAS May 21-23, Building 832 CSC Production Facility  Lab A (main clean room) configured for: u Panel epoxy operations. u Gas Bar and Wire Fixation Bar epoxy installations. u Tooling fabrications (epoxy steps). u Wire Winding and Epoxy setting operations. u Wire Spacing and Tension Tests. u Panel Flatness Tests ( mechanical and electrical). u Chamber Assembly and Electronic Flatness Tests. u High Voltage Cable and Connector installations.

DOE/NSF Review of U.S. ATLAS May 21-23, Building 832 CSC Production Facility  Lab B ( multiple table stations ) configured for: u Connector and part preparations. u Soldering operations on Y-Y, X-X, and Y- Cover Panels u X-X Panel “later steps” u Storage of all constructed Chambers

DOE/NSF Review of U.S. ATLAS May 21-23, Panel Travelers – Part A

DOE/NSF Review of U.S. ATLAS May 21-23, Panel Travelers – Part B

DOE/NSF Review of U.S. ATLAS May 21-23, X-X Panel Curing

DOE/NSF Review of U.S. ATLAS May 21-23, Soldering Connectors

DOE/NSF Review of U.S. ATLAS May 21-23, X-X Panel Wire Winding

DOE/NSF Review of U.S. ATLAS May 21-23, Electronic Flatness Testing

DOE/NSF Review of U.S. ATLAS May 21-23, L-2 Ch. 10 Gap 4

DOE/NSF Review of U.S. ATLAS May 21-23, Faraday Cage Prototype

DOE/NSF Review of U.S. ATLAS May 21-23, CSC Panel Production Rates Tooling Capacity S-1 L-2 80

DOE/NSF Review of U.S. ATLAS May 21-23, CSC Parts LOB

DOE/NSF Review of U.S. ATLAS May 21-23, CSC Chamber Production Plan 16 S-1 L-2 34

DOE/NSF Review of U.S. ATLAS May 21-23, CSC On-detector Electronics ASM1: Preamp/shaper ASM2: Analog memory, ADC & MUX

DOE/NSF Review of U.S. ATLAS May 21-23, Off detector electronics ROD prototype GPU Crate

DOE/NSF Review of U.S. ATLAS May 21-23, Status of major deliverables  On-detector  3 custom ASICs ready for production  ASM1 board ready for production  ASM2 board  Rad-soft proto beam-tested Aug. ’02  Rad-hard proto in design  Production quantities of most components in hand  Cooling and calibration in design

DOE/NSF Review of U.S. ATLAS May 21-23, Deliverables con’t.  Off-detector  ROD, GPU  Prototypes assembled  Most functions have been exercised and tested  Design and layout seem suitable for production  Production quantities of most components on hand  Firmware development proceeds through 2003  Transition module  First proto 3Q ’02 (not full density)  Final version in design  Software in development  Beam test/system test scheduled for 8/03

DOE/NSF Review of U.S. ATLAS May 21-23, On-detector electronics production 3 BNL-designed custom ICs preamp/shaper (2560), digital mux (2560), clock buffer (160) all Agilent 0.5um CMOS prototyping & procurement through MOSIS PRR June ’03 P/S, MUX shared reticle production CK BUF – small quantity, cheapest to buy MPW overruns 2 other custom ASICs SCA, Pos. VREG tested and qualified elsewhere in ATLAS shared procurement with other ATLAS subsystems - done 4 COTS components opamp, ADC, PECL rcvr., G-link tested and qualified elsewhere in ATLAS shared procurement (opamp, ADC, PECL) with LArg – underway preamp/shaper production test fixture

DOE/NSF Review of U.S. ATLAS May 21-23, Milestones June 03Custom chips PRR & begin production Aug 03Rad-hard ASM2 proto System integration test Oct 03ASM boards PRR & begin production Custom chips in hand Nov 03CSC chamber production complete ROD PRR Early 04Assemble & test ASM boards Begin installing electronics on chambers Late 04Certify CSCs, ship to CERN

DOE/NSF Review of U.S. ATLAS May 21-23, Radiation