HF HV Decision path Y.Onel. HV Micro PRR August 3, 2012 Follow up of August 3 rd Meeting At the meeting the HCAL HF group presented the HV PSU options.

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
ClearCube Blade Manager 4.0 Overview and Demonstration Rev
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
André Augustinus 16 June 2003 DCS Workshop Safety.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
Status of the Clermont-Ferrand R&D works Tilecal upgrade meeting at CERN (11 February 2015) François Vazeille on behalf of Clermont-Fd team ● Active Dividers:
A3016 and MAO test at CAEN Pigi, A. Boaino & CAEN.
ECAL and HCAL status 1Yu. Guz 2014/11/26. TED shots, 24-Nov 2Yu. Guz 2014/11/26.
The New Software Accounting Rules-GASB 51
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
Digital I/O Connecting to the Outside World
AccuMax Multi-Point Injection Mechanics
SDLC Phase 2: Selection Dania Bilal IS 582 Spring 2009.
HF UPGRADE PROJECT Y. Onel PM June 11, Recent Highlights and News-I The PMT deliveries are now completed. Testing is going well. We had a meeting.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
LV and HV status of the RPC system RPC detector and trigger group.
Low Voltage LB status RPC detector and trigger group.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
S. Lusin, T1 ESR, CERN 17 Sep 101 Totem T1 ESR 17 Sep 10 S. Lusin Observations from Electrical Inspection of T1.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Adapting Muon Endcap UF/PNPI HV system for GEM V. Barashko, A. Korytov, A. Madorsky, G. Mitselmakher University of Florida/Physics N. Bondar, V. Golovtsov,
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
PHOTOMULTIPLIER HIGH VOLTAGE POWER SUPPLY SYSTEM FOR THE CMS FORWARD HADRON CALORIMETER Lubomir Dimitrov, Ivan Vankov Nuclear Electronics Laboratory, Institute.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
19/05/10FV 1 HyTec crate – DCS integration issues.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Electronic. Analog Vs. Digital Analog –Continuous –Can take on any values in a given range –Very susceptible to noise Digital –Discrete –Can only take.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
CERN September 29, 20041W.H.Trzaska HIP Jyväskylä T0 – TDR 22 nd LHCC meeting; Open Session CERN, September 29, 2004 W.H.Trzaska (for T0 collaboration)
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
CERN, 17/2/06 S. Paoletti The A4601H board: specifications Two independent Power Supply Units featuring: 2.5V and 1.25V regulators: –I2.5 MAX = 13 A, V2.5.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Software Engineering Requirements Review June 5, 2002 LBNL Chuck McParland.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 Object-Oriented Analysis and Design with the Unified Process Figure 13-1 Implementation discipline activities.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
19/10/11FV 1 Behavior of generic HV channel. Mail’s survey: appeal for general policy VF2 19/10/11 Patrizia: “Based on the running experience of NA48,
Helen Heath, Magnus Loutit.  Useful meetings at CERN before Easter ◦ ML and HH met with John Fullerton from BE for practical advice on the CEDAR motor.
10/09/10FV 1 News and observations from Brussels' meeting.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
Spikes A.Mestvirishvili, I.Schmidt University of Iowa 1.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
S. Feher MICE Magnet Readiness Review RAL, June 28th, 2016
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
LKr status R. Fantechi.
TileCal upgrade EVO meeting Demonstrator tesks
Mini-drawers, FE-ASIC , Integrator
Electrical and electronic systems projects
Unit4 Customer Portal Submitting & Managing Cases.
RPC HV&LV status Introduction HV power supply tender
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

HF HV Decision path Y.Onel

HV Micro PRR August 3, 2012 Follow up of August 3 rd Meeting At the meeting the HCAL HF group presented the HV PSU options for the HF PMT replacement project. The HF group described the experiences and tests with both CAEN and Bulgarian power supplies. The prototype Bulgarian power supply was used at 904 PMT test station. Although it meets with all the specs, Bulgarian power supply produced several problems (e.g. baseboard failure) due to firmware issues. During the tests the firmware was upgraded three times, with waiting time for upgrade. The HCAL HF group expressed that CAEN solution is preferred over Bulgarian solution due to i) long term hardware and firmware maintenance, ii) unified HV and LV system throughout HCAL and with most of the CMS. The HCAL group asked a decision based on the evaluation of the power supply solution by using point evaluation criteria given above, and then the HCAL will inform the PRR committee to obtain final recommendation. Please respond by August 14 th, Comments from the Committee The committee likes the idea to unify the HF HV system with the HCAL Low voltage system and most other high voltage systems in CMS and select a system supplied by CAEN. In addition, the long-term maintenance is dealt with centrally and CERN PH/ESE supports the contract. A study of potential baseboard vulnerability associated with the ramping or tripping of the power supplies should be attached to the final proposal. The project must have a solution to any problems arising from unusual states of the power supply. If there are no problems, the project should say so. Before endorsing a proposed solution the committee must know that the system is robust with respect to the disappearance of any power supply channel from any initial configuration. 2

The Cost Estimate For the CAEN solution there is a need to develop an interlock, patch panel, LED system. We are also considering using CAEN interlock cards but the CERN CAEN members have left for the vacation, and they will not be here for about a month (project deadline for decision is August 15 th, 2012). The attached spreadsheet (for both CAEN and Bulgarian options) considers these components (only for CAEN) to be custom made and therefore their cost are also included. Also, according to latest information from CAEN, they will not charge us to modify modules to meet 10mA value for HF (estimated to be 6000 Euros for both CAEN options). Nevertheless we keep this charge in the cost estimate until we get official information We got the votes from 7 committee members-- The total vote is 58,700 /70,000 for CAEN and 48,300/70,000 for the Bulgarian system. So the CAEN is a clear winner- Once I get your PRR committee recommendations to the HF Upgrade Project I will ask S.Lusin, G.Martinez and A.Mestvirisvili to get ready for the purchase. We have asked the US Project office to pencil in our request and prepare the PO that we can move the money from Iowa to CERN. 3

Magnus Micro PRR Report Follow-up A follow-up review was called by the upgrade project manager with the charge to review the system options for the HF high voltage power system. The CMS committee specifically selected for this review was: Wolfram Zeuner, CERN Magnus Hansen, CERN Ken Bell, STFC/RAL Sergei Lusin, UW/CERN Frank Glege, CERN Two systems are being considered: the first is built by a very capable group at the University of Sofia, Bulgaria, and on the second by CAEN Spa, Italy. Comments CMS HCAL is using and will for years to come be using a CAEN built low voltage power system. The Bulgarian supplies are good hardware wise but serious issues with firmware have been experienced during testing. A CAEN system is installed for component testing and is working flawlessly even though the supplies used are not fulfilling all requirements about e.g. maximal current. CAEN is developing a new high voltage power supply module suitable for e.g. the new HF PMT effectively removing the issue with limited maximal current. The long term maintenance of the CAEN system is dealt with centrally and a support contract is supported by CERN PH/ESE. The long term maintenance situation for the Bulgarian system is less clear and must be considered a weak point. Recommendations A study of potential base board and PMT vulnerability associated with the ramping or tripping of the power supplies should be attached to the final HF high voltage power system proposal. Conclusion The committee likes the idea to unify the HF HV system with the HCAL Low voltage system and most other high voltage systems in CMS. The committee strongly supports selecting the system supplied by CAEN subject to the recommendation about potential base board and PMT vulnerability above. 4

Answers to the Comments-I By design the baseboard with divider is safe for any combination of legal voltages at the photo-cathode, and the last two dynodes (D9 and D10). The divider provides Hamamatsu recommended voltages for photo-cathode -Dy1-...-Dy8, and separate booster voltages at Dy9 and Dy10. V(Dy8) = 0.24*V(photo-cthode) Maximum actual operating voltage for HF PMTs will be 700V, and V(Dy8) - 175Vmax. Since V(Dy9) = 0-112V, V(Dy10)=0-56V, the mostly stressed components would be the bypass capacitors between Dy8 and Dy9. Voltage across C8_9 could be up to 56V in normal operating conditions; 112V if V(Dy9) is maxed at 112V, and V(photo-cathode) = 0-175V if V(photo-cathode) is maxed, and V(Dy9)=0. Bypass capacitors between Dy9 and Dy10 can be subjected maximum to 112V when V(Dy9)=max, and V(Dy10)=0. Bypass capacitors used in the design are Kemet C0603C103K2RACTU, rated at 200V, and having maximum withstanding voltage of 500V. An additional requirement for the maximum withstanding voltage testing is that charging current does not exceed 50mA, and this requirement leads to a ramp-up speed limit of 20MV/s, which is beyond technical abilities of both CAEN, and Bulgarian PSs. It is worth note that internally Bulgarian power supplies are made of independent power supplies, not synchronized during ramp-up or ramp-down, so the above considerations valid for both HV systems under consideration 5

Answers to the Comments-II We plan to use the External trip lines provided by CAEN to interlock the channels. This should provide a normal trip protection, in which if for ay reason a dynode or cathode channel trips, the associated dynodes/cathode would trip also. This probably does not provide a protection for the case for example that a channel or a whole module "dies" without asserting an external trip line. It will not prevent either from mistakes on the settings (for example one could set the voltage of a dynode to 0 (or a very low value) or operators mistakes in which a dynode/cathode channel is turned but not its partners. It is essentially impossible to make a foolproof system; the most that it can be made is a DCS watchdog (as we already have for other DCS parameters) that monitors the channels and sends SMSs and/or takes automatic actions like turning off the affected channels if something is wrong. On the other hand, we wanted to investigate that, if the situation of having power on a cathode, without power on the dynodes, or vice-verse can make any damaging stress at all on the PMTs. We performed some tests with the CAEN power supplies at 904 by using 8 new PMTs (single anode readout) with production baseboards. First a reference data with LED light (which is distributed to individual PMTs) was taken with all voltages on (black line). Then we switched off the cathode voltage and kept PMT's for about 10 minutes with only two last dynodes on. After that we switched back the cathode voltage and took the data again (red line). The plots below show that in both cases the digitized pulse shapes from LED light are indistinguishable. With this test we demonstrated that it is safe for PMTs to be (accidentally) operated with only two last dynode voltage about 10 minutes, which is more than enough to implement a software mechanism to shut down the dynode voltages, if for some reason cathode voltage trips. 6

ItemDescriptionQuantityUnit Price (Euro)Total Amount (Euro) 6New HV System (CAEN Solution, Option-2) 6.1Purchase of A1538D PSU3€ 3,181.00€ 9,543.00$11, Purchase of A1511B Module4€ 4,777.00€ 19,108.00$23, Rework Price**7€ 1,000.00€ 6,000.00$7, HF Integration of CAEN PS Modules 6.4.aSHV Cables36$80.00$2, bSHV patch-panel connectors40$50.00$2, cDB37 cables, and patch-pane connectorsl6$50.00$ dCircular HV connectors (to existing cables going to the detector)15$200.00$3, ePrinted circuit boards (including prototypes)5$400.00$2, fMechanics (3 production + 2 prototypes)5$600.00$3, gComponents for the boards5$400.00$2, hMisc. connectors5$200.00$1, iEngineering Time (between 3months and 6months)3$8,000.00$24, jEngineer Travel to CERN2$3,000.00$6, Total$88, The Cost Estimate including the HF Integration cost for the CAEN Module

CAEN SYSTEM 8