1 eCoRepair New Release Slide Expanded view of Circuit Details 2 - 3 Change to Circuit Looping text4 View of closed faults up to 30 days old5 - 7 Minor.

Slides:



Advertisements
Similar presentations
Web Shift Booking System
Advertisements

AIMSweb Progress Monitor Online User Training
1 Unit & District Tools Phase 1. 2 To access the new Unit and District Tools, you will need to click on the link embedded in the MyScouting Flash page.
Chapter 07: Lecture Notes (CSIT 104) 1111 Exploring Microsoft Office Excel 2007 Chapter 7 Data Consolidation, Links, and Formula Auditing.
SIS – NBS Online Specimen Tracking System Training
TFACTS Private Provider Financial/Invoicing Overview 1.
7 Day Self Assessment Tool (7 Day SAT) User Guide v7 (June 2015)
Guide to Oracle10G1 Introduction To Forms Builder Chapter 5.
A Guide to Oracle9i1 Introduction To Forms Builder Chapter 5.
USC’s Internet-based Time and Attendance Management System.
Service Definer Roles NHS e-Referral Service
Information for students Welcome to the S 3 P system. Login to the system by entering your User ID and password. The User ID is the same as your normal.
E | W | E | W | NHS e-Referral Service Referring Roles Issued: 3 June.
E | W | E | W | NHS e-Referral Service Provider Roles Issued: 3 rd.
1 Wireless Warehouse Management System Compsee’s M.A.T. Mobile Application Terminal.
1. 2 LXU800 User’s Manual 1.Installation – Windows XP UI Features Introduction Data Connection & Disconnection.
HIPS Procedures for Estate Agents / Suppliers. Updated August 2008HIPSworld guide - Estate Agent / Supplier 2 Content 1.Logging in to Our Home Information.
WEB PRICING SYSTEM User Manual. Click here to Log In The Defense Commissary Agency Vendor Price Change system is located at
Welcome to the Manage Inventory lesson for the North Carolina Immunization Branch. Contents: Adding Inventory Modifying Inventory Inventory Reports **
ERA Manager Training December 19, Propriety and Confidential. Do not distribute. 2 ERA Manager Overview In an effort to reduce the need for Providers,
Remedy – Customer Portal Fiona Gregory McKesson CRM 1.
Lead Management Tool Partner User Guide March 15, 2013
Discipline, Crime, and Violence August New DCV Application The DCV application and submission process has been revised beginning with the
Getting Started with BDI-2™ Mobile Data Solution for Windows®
Routing and Tracking Complaints in CCW. CCW Now that you have learned how to logon to CCW, you will learn how to open a route with and without special.
How to use TREx 1 Disclaimer: TREx under development, minor modifications may occur pending final release. Prepared for Education Service Center TREx Training.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
State of Kansas Travel Authorizations Statewide Management, Accounting and Reporting Tool Entering a Travel Authorization Navigation: Employee Self Service.
WEIGH STAR A Software for Weighing Systems. Features Weigh STAR is a S/W that is designed for weighing systems. It reads the weight (both Gross Weight.
PearsonAccess April 14, PearsonAccess – Agenda Order Tracking Additional Orders Student Data Upload (SDU) files New Student Wizard Online Testing.
FIX Eye FIX Eye Getting started: The guide EPAM Systems B2BITS.
0 eCPIC Admin Training: OMB Submission Packages and Annual Submissions These training materials are owned by the Federal Government. They can be used or.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
E | W | E | W | NHS e-Referral Service Commissioner Role Issued: 3.
Copyright © 2008 Pearson Prentice Hall. All rights reserved Copyright © 2008 Prentice-Hall. All rights reserved. Committed to Shaping the Next.
1 Sponsor Claim Process  Click on the Sponsor Claims menu in order to process claims.  The submenu will display: Sponsor Claims will display the most.
State of Michigan Learning Management System (LMS) for Training Coordinators Updated: 10/29/2015.
Vendor’s Malt Manufacturing Return. Log in with the user id and password provided through the EDS registration process and click on the Login button.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
Indicator 13 Secondary Transition. Main Menu SPP13 has a navigation toolbar located at the top of each screen. If you use the toolbar to navigate to another.
Lesson 11: : Inbound Purchase Orders & Requisitions.
Contract Invoice Guide
3M Partners and Suppliers Click to edit Master title style USER GUIDE Supplier eInvoicing USER GUIDE The 3M beX environment: Day-to-day use.
E | W | E | W | NHS e-Referral Service Referring Roles Issued: 27 th.
Reporter Training for High School RIO TM
Microsoft Customer 2 Partner Connector Quick Reference Guide
Inquiry Tracking. Inquiry Tracking :: Logon Non-Weidmuller employees use the first initial of your first name and your full last name. (i.e. bjones for.
Orders – Create Responses Boeing Supply Chain Platform (BSCP) Detailed Training July 2016.
PMI Returns Management Process
Return Shipment Manifest
SUBMITTING A PAYMENT REQUEST FORM
Multi-host Internet Access Portal (MIAP) Enhancement Guide
I-Supplier Training Guide
How to Create and Start a Test Session
FTS 2 Failure Tracking System 2 User‘s Guide Process Flow
Managing Rosters Screener Training Module Module 5
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Lesson 1: Epic Appointment Scheduling Referrals
Reporter Training for High School RIOTM
QPTM- Application Fundamentals
Epic Referral Processing
Epic Referral Processing
Lesson 4: Managing Events in Case Tracking
Ethernet diagnostic journey explained
How to run the standalone diagnostics test
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Reporter Training for High School RIOTM
Presentation transcript:

1 eCoRepair New Release Slide Expanded view of Circuit Details Change to Circuit Looping text4 View of closed faults up to 30 days old5 - 7 Minor Changes to Date and Time Fields8 - 9 Changes to Structured Questions 10 New ‘Quick Test’ capability for Narrow Band Circuits New Update Summary and Customer Required –Information feature Milestone View - Removal of duplicate entries 18 – 19 Disclaimer – This is not a Training Document but is meant only as a guide to new or changed functionality. There may be some minor differences between the screenshots and the live system.

2 Expansion Of Circuit Details This is to give more information about the technology, speed etc before applying the loop to a certain circuit id. In order to display the technology information, a new collapsible frame ‘Technology Type’ has been introduced just below the Circuit Details Tab. The ‘Technology Type’ will be made visible on clicking the ‘Expand Circuit Details’ button.

3 Expansion Of Circuit Details….continued By default this frame will fetch results from a cached dataset. If there are no results to be displayed then it will start the process of populating the latest records for the looping circuit id. It can also be refreshed manually by clicking the high lighted text. NOTE: This ‘technology type’ frame is available on Create Fault as well as on Circuit looping option in Diagnostics menu.

4 Changes to Circuit Looping – Use of Syntax. Instead of using the generic term ‘node’ eCo Repair will now where possible use location details e.g. A END CUSTOMER, A END EXCHANGE, B END CUSTOMER, B END EXCHANGE becomes

5 View of closed faults up to 30-days old In Live Tracking window, the option to view closed faults is now provided. Clicking the ‘Closed’ button results in……

6 …..something similar to this. Note the LIVE button to toggle back to live faults.. On this screen selecting any listed circuit would return the milestone window for the fault.....

7 View Closed Fault – Milestone New to this view is the showing of references to other faults that have occurred on the same circuit. Clicking on the reference will Switch the milestone view to those details.

8 Date Validations Where possible dates will be validated not only in format but where logic dictates a future date is expected e.g. for access, past dates will be rejected and similarly where an historic date is expected eg for an Alarm, any future date will be rejected. Example where only future dates are expected and accepted….

9 Minute Intervals on the Date Time fields. The Minutes picker on the datetime control is now set to 5 minute intervals and the ‘Cancel’ button for the structured questions has been relabled ‘Cancel Report’ (partially obscured in the picture by the time picker)

10 Changes to Structured Questions These are aimed at reducing the number of questions being asked. For example Input Access Details will now only appear if the diagnostics indicate a fault at a particular end, and input will be compulsory.

11 Narrow Band Quick Test This new functionality is automatically triggered as part of the Structured Questions whilst creating a fault and results in a screen as shown below. Each line is generated as the test progress’. Its available only for KX and NX type circuits and only when there are no alarms indicated. Please Note: The test is intrusive.

12 The Narrow Band Quick Test may end up with one of the following result. Pass, Fail, Inconclusive, Premature Termination Dependent on the outcome links would be made to the next questions and the corresponding question would be displayed to the user.

13 Further Details of Narrowband Quick Test The eCo Repair Narrowband Quick Test is a continuity check for Narrowband circuits only – i.e. those circuits with a prefix of KX and NX. It should be noted the Narrowband Quick Test is an intrusive test and if the circuit is not already ‘down’ then carrying out the test will result in a loss of service for the duration of the test – this can be up to 90 seconds. Once started the test cannot be stopped until it reaches completion The circuit continuity check is carried out by means of remotely applying loops at both circuit ends and sending a known short-duration test pattern around those loops in a Fig 8 format. Circuit continuity is confirmed as a Pass result where the test pattern successfully travels the length of the circuit and arrives back at the point of its introduction. A loop can only be applied at the circuit ends however where that circuit terminates on a Network Terminating Unit or NTU and many narrowband circuits, particularly those provided for mobile operators, do not terminate on a NTU. Where a NTU does not exist at one or both circuit ends a loop will be applied at the BT exchange and the continuity check will be established to this point. In displaying the test results, the Narrowband Quick Test will indicate where the loops were applied – i.e. circuit ends or at the BT exchange. A Fail result indicates a problem has been detected with the circuit and the CP should report the fault to BT using eCo Repair The following should also be noted when using the eCo Repair Narrowband Quick Test; Not all network technologies can support the Narrowband Quick Test and those circuits routed via older non- compatible technologies cannot be continuity checked using this tool. An appropriate message is returned where this is the case All tests must be preceded by an Alarm Check A test can only be performed where the Alarm Check indicates the circuit is alarm free A short-duration continuity check such as the Narrowband Quick Test is not a suitable test for all faults types and problems of an intermittent nature and erroring type problems cannot be detected with this test.

14 The option of performing the Narrow Band Quick Test is also available via the Diagnostics menu on eCo Repair. However….

15 ….continuing with the option of performing the Quick Test will bring up a screen which would ask for the Circuit No on which the test is to be performed. Clicking on the “Check” button will display a warning message.

16 Update/Customer Required Information Summary This is about highlighting specific updates where BT requires urgent information, or a business need to draw to your attention. Updates can be filtered based on the selection of 3 categories by clicking on the respective hyperlink.

17 Clicking on a link would highlight it by changing the colour. And result in only those category of updates being shown.

18 Milestone View – New Buttons. New buttons have been introduced which relate directly to the category’s in the previous screens. Clicking on one of the new buttons will result in the relevant screen opening so that the details can be input eg Provide Access details will open up the Access Details tab.

19 Milestone View - Removal of duplicate entries. Clicking the ‘Mark as Read’ button no longer creates a new log entry, instead It appends the audit entry to the end of the log as shown here in green.