TPTF Verifiable Cost Sub-group Summary Final Report 3/xx/2008 Jim Galvin- TPTF VC Sub-group Chair.

Slides:



Advertisements
Similar presentations
1 Appeal to ERCOT Board Regarding Use of Fuel Oil Index Price (FOIP) Larry Gurley TXU Wholesale June 19, 2007.
Advertisements

RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Split Generation Resources (SGRs) (Also known as Jointly Owned.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 7, 2008.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Real Time Mitigation During Exceptional Fuel Cost Events.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
Guidelines for Verification of Resource Specific Fuel Adders RCWG Paul Vinson.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
Mitigated Offer Cap Presented to: NATF Date: September 29, 2009 By: Mark Patterson, Manager Market Operations Support (ERCOT) 1September 29 NATF Meeting.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
RCWG Update to WMS July 10, General Update Agenda Items for Today: Fuel Adder NPRR 485-(no vote) Variable O&M for Technology Types (vote) Seasonal.
1Texas Nodal Texas Nodal Commercial Systems COMS CSD Presentation By ERCOT Wednesday, 1/10/2007.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process TPTF Meeting Nov 28, 2007 Ino Gonzalez.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
Real Time Settlement Timeline Workshop Debrief To TAC 11/29/2012 Evaluation and consideration of reducing the RT Settlement Timeline Jim Galvin- CSWG Chair.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
PRS Response to Steel Companies’ Appeal of NPRR’s 351 and 378 Tom Payton on behalf of PRS August 4, 2011 Disclaimer: This response attempts to capture.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Resource Cost Working Group October 7, 2015 WMS Update.
Resource Cost Working Group December 2, 2015 WMS Update.
Unit-Specific Bid Limits based on Modified Generic Cost.
QMWG Update to WMS S. Looney December 3, Assignments from WMS ERCOT Market Operations Report – Two SASMs in October, no AS insufficiency – Two unique.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
QMWG Report to WMS S. Looney April 9, NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load.
NPRR 617 Overview and Justifications. Overview Current protocols place restrictions on Day-Ahead Three-Part Supply Offers – Part 1 (Startup Offer) – capped.
TPTF Verifiable Cost Sub-group Summary Report to TPTF 1/21/2008 Jim Galvin- TPTF VC Sub-group Chair.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
Market Credit Working Group update to the Wholesale Market Subcommittee 03/04/
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
RUC Startup Discussion. Problem The RUC language in the Nodal Protocols allows little or no ability for a generator to recover risk associated with operating.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
1 TAC Report to the ERCOT Board November 14, 2006.
NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
Utilization of Fuel Costs in Ercot Markets Ino González RCWG Meeting 2/24/2016.
Lead from the front Texas Nodal 1 Texas Nodal Ancillary Service Qualification Self-Certification approach ROS Discussion March 16,
Verifiable Cost Escalation Cost Factors ERCOT WMS 11/13/2013.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
Nodal Program Update to Cops
Fuel Cost Components in the Fuel Adder
Exceptional Fuel Costs in LMP
Fuel Cost Components in the Fuel Adder
Verifiable Cost Working Group (VCWG) Update
General Overview Of Resource Costs
Fuel Cost Components in the Fuel Adder
Resource Cost Working Group
Vendor Definition of DAM Commitment
Presentation transcript:

TPTF Verifiable Cost Sub-group Summary Final Report 3/xx/2008 Jim Galvin- TPTF VC Sub-group Chair

Process  The VC Sub-group drafted a set of 9-principles to guide the discussions  Some principles identified multiple issues for which the group discussed resolving  Only issues that received consensus are brought forth from the group to identify as resolved  The group will report on items that did not receive consensus  Today’s report summarizes the group’s findings

Start-up and Minimum Energy- (Principle 1)  Verifiable Start-up and Min Energy Capturing Costs from Breaker Close to LSL (resolved) Including Shut-down Costs in Start-up (resolved) Recovering Start Costs when RUC is cancelled (by ERCOT) and Cost recovery during SPS  Rare occurrences will be noted in Protocols and cost recovery through dispute process Use of Auxiliary Equipment for Start-up (resolved)

Incremental Heat Rate- (Principle 2)  Verifiable Incremental Heat Rate Creating monotonically non-decreasing Incremental Heat Rate Curve (resolved) Actual System design will change a decreasing curve in MMS, setting a segment of the curve that is less than the previous segment, equal to that previous segment For verification of the Incremental Heat Rate, the submitting entity may utilize data from a Heat Rate Test, or Historical Data

Variable O&M (Principle 3)  Verifiable O&M Costs 10-year requirement for data/evidence of costs  For submitting entities who do not have 10-years worth of data, they may submit all the history they have Escalation rate will utilize the Handy-Whitman Index The Manual will reference types of Verifiable O&M; however, submitting entities will have the ability to submit O&M costs based on their formats and data sources (extremely difficult to create a O&M standard across the market) The VC Sub-group agrees with ERCOT in having a stakeholder group track O&M types and/or issues over the course of the Nodal Market

Risk by Resource Owners- (Principle 4)  Actual Principle that was defined: “ There is a level of risk that Resource owners take in the recovery of Start-up and Minimum Energy costs”  Some discussions centered around that there will be days when a Generator recovers costs and days when they may not  Some market participants requested that this Principle is not appropriate and is contrary to Principle 5  No systematic or procedural issues were brought up under this Principle

Make Generators Whole at Min Cost to Load (Principle 5)  The Over-riding theme throughout all discussions  No issues were presented under this Principle

Use of FIP and FOP (Principle 6)  Index pricing for fuel using Fuel Index Price and Fuel Oil Price was agreed upon by the group  Discussions around fuel costs during exceptional events, such as: Imbalance Fees Swing Costs Spot Gas (gas purchased at close of Day Ahead that diverges significantly from Index)  The VC Group agrees that cost recover mechanism will be needed for “Exceptional Events” that significantly harm a resource entity  Exceptional Events will also have to be defined

Emissions Costs- (Principle 7)  Submitting entities may submit verifiable incremental emissions costs for Start-up and Minimum Energy  All emissions costs were included in discussions  Open items around emissions The applicable rate for emissions costs was discussed as using Index or historical costs to come up with a $/MWh rate Some concern expressed about discussing opportunity costs as they are more complex than incremental historical costs

Prospective and Voluntary- (Principle 8)  The group agreed that the process was prospective and that only anomalous events would be considered under “Exceptional Events” for cost recovery  The current protocols reference a single RUC event as the trigger for a resource entity to be required to submit Verifiable Costs The VC group recommends that the trigger of the mandatory submittal for Verifiable Costs be 5 RUC events Recommendation relaxes the restriction for resources that are RUC’d infrequently and reduces the administrative burden on those entities and on ERCOT

Other Issues- CCP’s and SGR’s  Combined Cycle Plants may submit Verifiable Costs by registered configuration  Entities must submit for any configuration that meets the RUC trigger  Split Generation Resources may submit individually or through a Management QSE SGR’s may submit by set percentages that may differ from percentage of ownership ERCOT may require all owners of SGR’s to submit costs if the assignment of cost to the unit cannot be verified

Non-consensus Items  Power Purchase Agreements, arguments for and against included, but not limited to: Entities represented that PPA’s are a realized cost to the QSE to operate the resource in ERCOT and should be included in the VC Process Other Markets do include these elements as a form of Verifiable Costs Entities opposed indicated the difficulty in managing and verifying that these are true incremental costs Concerns expressed in having PPA’s set up to raise cost levels  No consensus from the Sub-group; however, we have encouraged the supporters of including PPA’s to continue discussions with WMS and/or TPTF

Next Steps  Decision on Emissions rate using Index or Historical  Definition of “Exceptional Events” and defining a cost recovery process  Work with ERCOT Staff to develop an implementation plan  NPRR’s needed to clarify issues vetted and resolved in the VC Sub-group  Final Report to TPTF and WMS  Any additional “To Do’s” for the VC Sub-group

Questions