1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.

Slides:



Advertisements
Similar presentations
WATER FOR THE 21 st CENTURY ECONOMY AND ENVIRONMENT Santa Ana River Watershed Conference April 11, 2013.
Advertisements

California Water Balance. Water Reserved for the Environment.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Northern Sacramento Valley Conjunctive Water Management Investigation The Glenn-Colusa Irrigation District and The Natural Heritage Institute October 21,
1 NODOS/Sites Reservoir: A Local Perspective Glenn Colusa Irrigation District July 2009.
. Achieving California’s Water Supply and Delta Ecological Improvement Simultaneously. Achieving California’s Water Supply and Delta Ecological Improvement.
F Sherman Island Sacramento River San Joaquin River God, United Methodists, Nature, and California Water.
Department of Water Resources Role in Water Transfers Jerry Johns, DWR
1 Water Planning & Stewardship Committee Item #6b Summary Subject: Review of Long-Term Delta Actions & Water Supply Planning Implications Purpose:To open.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
California Recycled Water Plan California Recycled Water Plan A comprehensive approach to California’s long-term water supply By Gregory B. Ryan and Meagan.
Dave Samson CA Department of Water Resources Northwest Hydroelectric Association 2011 Annual Conference "Avoiding a Dam Midlife Crisis" THE CALIFORNIA.
Overview of California’s System Yield Threats, Challenges, and the Need to Augment and Diversify Water Portfolios Robert Shibatani CEO & Principal Hydrologist.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
1 N ORTH - OF - THE -D ELTA O FFSTREAM S TORAGE S ACRAMENTO R IVER C ONSERVATION A REA F ORUM TAC N ORTH - OF - THE -D ELTA O FFSTREAM S TORAGE S ACRAMENTO.
Uncertainty and the Management of the Cedar River Presented by Bruce Bachen, Rand Little, and George Schneider Water Management Section Seattle Public.
North-of-the-Delta Offstream Storage Investigation Planning and Timeline “Planning is bringing the future into the present so you can do something about.
Water in California: Self-induced Scarcity Waterscape International Group.
Drought and the Central Valley Project August 2014.
Delta Conveyance: Update on the Planning Process and Analysis of Water Supply and Costs CCWA Board of Directors February 25, 2010.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
California Natural Resources Agency Department of Water Resources Small Business Program Lorie Hall, SB/DVBE Advocate Division of Management Services January.
CALFED Finance Planning. Need for Finance Planning Status quo approach to rely so heavily on State bond funds unlikely in the future Existing funding.
California Natural Resources Agency U.S. Army Corps of Engineers.
Overview of the Colorado River Basin Water Supply and Demand Study Urban Water Institute 19 th Annual Water Policy Conference August 22-24, 2012 San Diego.
Fresno County Water Crisis and Opportunities. The Delta And Our Water Supply In August 2007 the Federal Court ruled that the Delta Smelt was in danger.
Southern California Water Committee March 26, 2010 Ontario KARLA NEMETH, Natural Resources Agency.
Urban Water Institute Conference August 22,
Integrating Water Management Statewide Integrated Water Management (IWM) Gary Bardini, Deputy Director IWM Rijkswaterstaat & California Coordination Kickoff.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
Proposal for Improved CVP/SWP Integrated Operations.
Urban Water Institute Annual Water Conference August 27, 2015 S ITES R ESERVOIR P ROJECT
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Low-flow Intake Technical Analysis Zaffar Eusuff Ph: (916) Bay-Delta Office California Department of Water Resources.
1 Envisioning Futures for the Sacramento-San Joaquin Delta Ellen Hanak Public Policy Institute of California Jay Lund University of California, Davis.
Adapting Water Policy to Meet Future Need North Bay Watershed Association April 4, 2008 Lester Snow Director.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
Integrated Regional Watershed Management Plan Presentation – March 12, 2013 HLVRCD.
1 Development of Common Assumptions Common Model Package for the CALFED Surface Storage Investigations Presentation To: California Water and Environmental.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
Where to From Here Jerry Johns, DWR EWA Development of OCAP Proposal.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting March.
Assign Annual Demand for a Purpose CALSIM Simulation Compare the Long-term Average Annual Friant Unit Delivery to Benchmark Study CALSIM Simulation Completed.
UNDERSTANDING THE DELTA - AN ENGINEERING PERSPECTIVE.
1 Comparing Futures for the Sacramento-San Joaquin Delta Engineers: Jay Lund, UC Davis* William Fleenor, UC Davis Economists: Ellen Hanak, PPIC* Richard.
1 Climate Warming & California’s Water Future Jay R. Lund Civil and Environmental Engineering University of California, Davis
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
1 December 19, 2007 North-of-the-Delta Offstream Storage Project Overview State of California Department of Water Resources U.S. Department of the Interior.
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
Project Status South Delta Improvements Program Project Status November 2003.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
CVPIA §3406(b)(2) Water Operations on the Sacramento River Sacramento River Conservation Area Forum Technical Advisory Committee February 7, 2012.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Slide 1 Drinking Water Subcommittee Greg Gartrell, Chair CALFED Bay-Delta Public Advisory Committee SWRCB Periodic Review Presentation January 2005.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
1 Delta Risk Management Strategy Delta-Suisun Marsh Branch Department of Water Resources SCWC/SCWD MEETING JUNE 27, 2007.
California’s Flood Future Recommendations for Managing the State’s Flood Risk Flood Risk Management & Silver Jackets Workshop August 21, 2012.
Drought Management Sheri Looper CVP Water Resource Specialist.
Draft example: Indicators for water supply reliability and storage projects Presented by Steve Roberts (Department of Water Resources, Storage Investigations)
California Water Supply Overview Robert Shibatani CEO & Consulting Hydrologist The SHIBATANI GROUP, Inc.
20% by 2020: Achieving the Governor’s Water Conservation Target Southern California Water Dialogue July 23, 2008 Rick Soehren Chief, Water Use Efficiency.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Assemblymember Adrin Nazarian
CWEMF Annual Meeting March 2005
Zone 7 And WaterFix March 7, 2018
CBEWP Chino Basin Conjunctive Use Environmental
California Water Commission
Presentation transcript:

1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit State of California Department of Water Resources U.S. Department of the Interior Bureau of Reclamation Don Rasmussen

2 Outline  Planning Objectives  Status of Studies  Potential Features, Benefits and Costs  Sensitivity Analysis  NODOS can Help “Fix the Delta”  Schedule  Planning Objectives  Status of Studies  Potential Features, Benefits and Costs  Sensitivity Analysis  NODOS can Help “Fix the Delta”  Schedule

3 Planning Objectives  Primary Objectives: Increase water supply and water supply reliability and Sacramento Valley water management flexibility Improve Delta water quality Increase the survival of anadromous fish populations in the Sacramento River, as well as the health and survivability of other aquatic species  Secondary Objectives: Provide ancillary hydropower generation Provide additional recreational opportunities Provide incremental flood damage reduction benefits  Primary Objectives: Increase water supply and water supply reliability and Sacramento Valley water management flexibility Improve Delta water quality Increase the survival of anadromous fish populations in the Sacramento River, as well as the health and survivability of other aquatic species  Secondary Objectives: Provide ancillary hydropower generation Provide additional recreational opportunities Provide incremental flood damage reduction benefits

4 Feasibility Study Phases Initial Alternatives Plan Formulation Feasibility Study

5 Sites Reservoir Project Features

6 Potential Benefits  Support ecosystem restoration  Increase water supply and water supply reliability for: Urban Agricultural Environmental  Improve Delta water quality  Improve system flexibility  Provide ancillary hydropower generation  Improve flood protection  Increase recreational opportunities  Provide for Delta emergency response  Support ecosystem restoration  Increase water supply and water supply reliability for: Urban Agricultural Environmental  Improve Delta water quality  Improve system flexibility  Provide ancillary hydropower generation  Improve flood protection  Increase recreational opportunities  Provide for Delta emergency response

7 Improve System Flexibility  Sites can provide flexibility to the state’s constrained water management system  Sites can be operated to contribute to the long-term sustainability of the Delta ecosystem, maintain water quality and supply reliability, and mitigate the effects of Delta levee failure  Restoration Action storage could be adaptively managed to support restoration actions in the Delta  Added flexibility from Sites can also improve the viability and effectiveness of conjunctive management, water exchanges and transfers  Sites can provide flexibility to the state’s constrained water management system  Sites can be operated to contribute to the long-term sustainability of the Delta ecosystem, maintain water quality and supply reliability, and mitigate the effects of Delta levee failure  Restoration Action storage could be adaptively managed to support restoration actions in the Delta  Added flexibility from Sites can also improve the viability and effectiveness of conjunctive management, water exchanges and transfers

8 Shasta Sites Oroville Folsom ●Provide Stable Flows – Keswick to Colusa ●Increase Cold Water Pool in Shasta ●Improve Fish Passage at RBDD ●Reduce Diversions at TC and GCID Canals ●Provide Supplemental Flows for Cottonwood Establishment ●Provide Stable Flows – Keswick to Colusa ●Increase Cold Water Pool in Shasta ●Improve Fish Passage at RBDD ●Reduce Diversions at TC and GCID Canals ●Provide Supplemental Flows for Cottonwood Establishment Ecosystem Restoration 88

9 Water Supply ●Increase Water Supply Reliability for Local, SWP & CVP Contractors ●Provide Water Supply for the EWA or equivalent program ●Provide Water for Level 4 Refuge Supply ●Increase Water Supply Reliability for Local, SWP & CVP Contractors ●Provide Water Supply for the EWA or equivalent program ●Provide Water for Level 4 Refuge Supply 99 Shasta Sites Oroville Folsom

10 Water Quality ●Improve Delta Water Quality during Summer and Fall Months 1010 Shasta Sites Oroville Folsom

11 Estimated Water Benefits Under Various Operational Scenarios

12 Sites Reservoir Statistics Storage Capacity 1.8 Million Acre-Feet Construction Cost* $2.3 - $3.2 Billion Total Annual Benefits470 – 640 TAF per year * Range of costs reflects the various conveyance options and appurtenant structures under consideration. Construction cost estimates are at preliminary feasibility level of detail and do not include interest during construction, annual operations and maintenance, and power costs.

13 Evaluating Project Operations “a moving target” OCAP BO Wanger Ruling Climate Change Isolated Conveyance

14 Moving Target Studies DWR has performed sensitivity analyses on:  6680 cfs vs cfs Banks pumping rate  Climate Change  15,000 cfs Isolated Facility Future Studies:  Effects of Wanger Ruling (reduced exports)  Climate Change with Sea Level Rise  Other Isolated Facility Configurations DWR has performed sensitivity analyses on:  6680 cfs vs cfs Banks pumping rate  Climate Change  15,000 cfs Isolated Facility Future Studies:  Effects of Wanger Ruling (reduced exports)  Climate Change with Sea Level Rise  Other Isolated Facility Configurations

15 NODOS Can Help Fix The Delta Direct  Produce benefits for supply, quality and the ecosystem while reducing stressors on the Delta.  Protect delta smelt in the North Bay Indirect  Provide ecosystem flows, cooler water and improved habitat for anadromous fish on Sacramento River  Added flexibility from Sites can also improve the viability and effectiveness of conjunctive management, water exchanges and transfers Direct  Produce benefits for supply, quality and the ecosystem while reducing stressors on the Delta.  Protect delta smelt in the North Bay Indirect  Provide ecosystem flows, cooler water and improved habitat for anadromous fish on Sacramento River  Added flexibility from Sites can also improve the viability and effectiveness of conjunctive management, water exchanges and transfers

16 Planning Schedule Initial Alternatives Information Report Plan Formulation Report Feasibility Report & EIS/EIR Define Initial Alternatives Develop & Evaluate Alternatives Draft Feasibility Report & EIS/EIR Refine & Compare Alternatives Prepare Record of Decision and Notice of Determination & Process Final Report Public Hearings Public & Stakeholder Outreach

17 Contacts David Lewis Bureau of Reclamation 2800 Cottage Way, MP-700 Sacramento CA Don Rasmussen Department of Water Resources P.O. Box Sacramento CA Project Websites: