WP4: Instrumentation Tânia Melo Mendonça. 2 ISOLDE target unit Present target unit base at ISOLDE with 7 inlets (including ion source gas leak, heating.

Slides:



Advertisements
Similar presentations
L aboratory of P hysical and A nalytical C hemistry KULeuven Department of Chemistry Laboratory for Physical and Analytical Chemistry (LPAC) Celestijnenlaan.
Advertisements

TROUBLESHOOTING. 5WSS TROUBLESHOOTING ERROR CODEFAULTY INDICATION E1ROOM SENSOR CONTACT LOOSE E2INDOOR COIL SENSOR CONTACT LOOSE E3WATER OUTLET SENSOR.
CENTRIFUGAL PUMP Module 3.2 MCP Construction
PARKER BOILER PARKER BOILER HOT WATER PIPING SYSTEM 1. 3 way valve and O.S.A. reset. 2. Single boiler piping schematic. 3. Single boiler with 3 way valve.
Thermal Power Station Plant. Introduction 150 MW Thermal power station plant, produce 450t/hr steam at full load The max steam pressure is 150 bar with.
Gas ammonia out to turbine poor mixture water/ ammonia rich mixture water/ ammonia Gas Assisted Solar Absorption Heat Engine GASAHE heat Diffusion absorption.
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
INR Pitesti, D. Dobrea, L. Aioanei Task 4.3. Instrumentation Specifications 4. Core C& I devices 5. Primary coolant C&I devices Based on [1], [2] and [3],
Oak Ridge SNS Experimental Facilities X /arb 1 SNS MPS Review Target-MPS Review WBS Ron Battle Target Controls, Target Systems Experimental.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
Lecture 2 Control Instrumentation 1.P&ID, PFD 2.Control Hardware Elements 1.Sensor / Transducer 1.Actuator 2.Controller -Do I have confident feeling of.
Blow Dryers A heat transfer problem waiting to happen By Scott Lemmon and Charlie Crosby.
Basics of Vacuum Technology Unit: Pa = N/m 2 = J/m 3 UnitPa or N/m 2 bar10 5 mbar100 atm= 760 torr x 10 5.
PRELIMINARY TEST PLANS 6/30/2015 Detailed Design Review 1.
Ventricle Chamber Valve Imaging Chamber ECG Machine Aortic Compliance Chamber Buffer Chamber Secondary Compliance Chamber Flow Meter Pressure Sensors DAQ.
Stern-Gerlach Experiment Physics 243 Fall 2007 Chris Osborn Daniel Richman.
MINIATURE ENGINEERING SYSTEMS GROUP MINIATURE CENTRIFUGAL COMPRESSOR TESTING Presented by Dipjyoti Acharya.
Gas and Liquid Metering. Why Metering? Measuring flow rate and cumulative volume Selling System Control Losses detection Reservoir outlets Pumping stations.
CMS FPIX Cooling Prototype Phase One Estimate and Conceptual Design R. L. Schmitt 10/28/2009.
For Cardinal Newman Hall Randall Lessard ET Fall 2013 Dr. Cris Koutsougeras Advisors: Dr. Rana Mitra Mr. Byron Patterson.
Heat transfer in turbulent flow CL Aim To determine the overall heat transfer coefficient & the individual film transfer coefficient and verify.
BOILER PLANT OPERATION Presented By Mr. Sivanand Ray
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
ORCNext – WP4 Development of supercritical technologies Tom Catternan Henk Huisseune 1.
ORCNext – WP4 Development of supercritical technologies Huisseune Henk 1.
NCSX Helium Bakeout System M. Kalish 3/25/02
An Introduction to Chromatography What is chromatography? The separation of a mixture by distribution of its components between a mobile and stationary.
Vacuum system.
Quality of Water Q litres Time to Collect Water secs Volume Flow Rate Q litres/min Pump 1 Inlet Pressure P 1 bar Pump 1 Outlet Pressure.
LIEBE project: WP3 – Construction and tests Project coordination meeting – 30/01/ /01/2015 LIEBE project meeting1 M. Delonca on behalf of the WP3.
July 11, 2003 HAPL e-meeting. 1 Armor Design & Modeling Progress A. René Raffray UCSD HAPL e-meeting July 11, 2003 (1)Provide Parameters for Chamber “System”
FC Flow Control: Centrifugal pump with constant speed (rpm) Orifice plate sensor Globe valve FC Flow Control: Positive displacement pump Orifice plate.
LSU Petroleum Engineering Research and Technology Transfer Laboratory “The Well Facility”
Boilers Present By: Jason Gillier 4M-H. OBJECTIVE: To provide the audience with a brief, but concise overview of what boilers are and there components.
First Mercury Test by Stuart Walker. Original Setup.
Leak tests G. Apeldoorn, P. Vankov , NIKHEF.
Prototype target tests with the ISOLDE Tape Station Tania M. Mendonca.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
Page 1 Sapphire by pass line  Design Concept of Cooling Water System : Funnel 10 line Tank 2 10 tones Chiller -20cm tilt - 5cm distance between growers.
Ref: P.ppt (06/03/2016) 1 EUROTHERM CONTROLS 2704 Vacuum Block.
LIEBE: Design of a molten metal target based on a Pb-Bi loop at CERN-ISOLDE 6/25/2014 LIEBE project meeting1 T. De Melo Mendonca, M. Delonca, D. Houngbo,
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
ClearFire-LC Hydronic Boiler Solution. ClearFire Family Capacities from 400 to 12,000 MBH 2 ClearFire-H - Steam ClearFire-C - Condensing ClearFire-V -
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
Negative ion sources and Be ionisation studies Tania de Melo Mendonca on behalf of the TISD team EN-STI-RBS.
CSNS cryogenic system Institute of High Energy Physics Guoping Wang June 21, 2016.
High Power Target Studies at CERN-ISOLDE Tania M. Mendonca, Melanie Delonca, Veronique Ghetta, Etam Noah, Thierry Stora.
Systematic studies on pellet beam production M.Büscher, A.Gerasimov, V.Chernetsky, P.Fedorets, A.Dolgolenko,V.Balanutsa, A.Boukharov, L.Gusev, S. Mineev,
LIEBE project Safety aspects of the Pb/Bi loop target LIEBE meeting report – WP5AP.Bernardes Thanks to : Richard Catherall/EN-STI, M.Delonca/EN/STI,
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
Leak Detection method for Vacuum Systems Alexander Permogorov
Date of download: 6/23/2016 Copyright © ASME. All rights reserved. From: Heat Transfer and Pressure Drop Analysis of Chilled Water and Ice Slurry in a.
Mass and Energy Analysis of Control Volumes Chapter 5a.
Sensors and Detectors - 1
Heat Exchangers and Condensers
Date of download: 10/23/2017 Copyright © ASME. All rights reserved.
Date of download: 10/24/2017 Copyright © ASME. All rights reserved.
Hemodialysis Lecture 3.
Designing Safety into a High-power Neutron Spallation Source
Calorimeter Transient Analysis for Steady State with ID Heat Leak and mini-FCal Analysis with 88.5°K Coolant in the Cooling Coil July 25, 2014 Brian Cuerden.
Date of download: 11/8/2017 Copyright © ASME. All rights reserved.
Dorothea Schumann, Jörg Neuhausen, Tânia Melo Mendonça, Thierry Stora
Integration issues at IHEP
The Basic Direct Expansion Refrigeration Cycle
ISOLDE Front-End design review – Details of previous faults
Plate Heat Exchanger (PHE)
accumulation octopole
Presentation transcript:

WP4: Instrumentation Tânia Melo Mendonça

2 ISOLDE target unit Present target unit base at ISOLDE with 7 inlets (including ion source gas leak, heating for chimney/transfer line) Present interface at ISOLDE allows up to 4 thermocouples Changes at the front-end interface? Ion source Temperature (Multipin connnector) Chimney and transfer line heating

Temperature control Minimum 5 thermocouples needed 3 Transfer line + chimney (2x) Outlet diffusion chamber Inlet irradiation chamber Outlet Pump

Flow control 4 Inlet irradiation chamber Sensor at diffusion chamber Interlock to be included in case of flow failure – cut on proton beam - Flow rate measurement at entrance of irradiation chamber – flow meter (e.g. Venturi tube) - Pressure in the pump -LBE level in the diffusion chamber – sensor - Leak detection