PHENIX WEEKLY PLANNING 3/09/06 Don Lynch. BLM Test BLM Test Installation He Bags.

Slides:



Advertisements
Similar presentations
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
Advertisements

PHENIX WEEKLY PLANNING 2/8/2007 Don Lynch. 2/8/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress Pink.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
PHENIX WEEKLY PLANNING 1/4/2007 Don Lynch. 1/4/207 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 6/7/2007 Don Lynch. 6/7/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day No More Planned Remove.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 4/20/06 Don Lynch. Safety We have lost a whole week of running because of a violation of procedure and not because of the accident.
PHENIX WEEKLY PLANNING 11/30/06 Don Lynch. 11/16/06 Weekly Planning Meeting 2 PHENIX END OF SHUTDOWN PARTY Celebrating the successful installation of.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
PHENIX WEEKLY PLANNING 10/05/06 Don Lynch. 10/05/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
PHENIX PLANNING Technical Support Plan for 2006 Don Lynch (updated 3/24/06)
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
PHENIX WEEKLY PLANNING 7/31/06 Don Lynch. 7/31/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameDurationStart_DateFinish_Date PHENIX Shutdown.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 10/12/06 Don Lynch. 10/12/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
Preparations for Run 6 Don Lynch February 13, 2006.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
PHENIX WEEKLY PLANNING 3/30/06 Don Lynch. This Week MPC air flow started BLM source test HBD transparency monitor hutch work and cable tray 1 st MPC Card.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 8/24/06 Don Lynch. 8/24/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameDurationStart_DateFinish_Date PHENIX Shutdown.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
PHENIX WEEKLY PLANNING 2/16/06 Don Lynch. Prep for Run 6 Completed.
1 2/4/2010 PHENIX WEEKLY PLANNING 2/4/2010 Don Lynch.
Presentation transcript:

PHENIX WEEKLY PLANNING 3/09/06 Don Lynch

BLM Test BLM Test Installation He Bags

LN 2 Storage Dewar for BBC

LN 2 Storage Dewar for BBC Remaining Tasks Protection for Vacuum port Plumb in LN2 Controls Valve off exsisting dry air supply to BBC leaving switch valve to allow using dry air in future if necessary (e.g. maintenance of LN2 supply)

Next Access Day Expect next access day (8 hrs) to be March 22 Expect shorter controlled accesses before then Subsystems must arrange for tech assistance prior to access day or don’t expect assistance. (see Don Lynch or John Haggerty) PHENIX Techs only on CM lift platform unless accompanied by PHENIX Tech Planned: MPC electronics installation HBD Prep?

MPC MPC Electronics enclosure built waiting for cards, work permit for crane is in place. Expect to install in next access day Location for MPC electronics on top of center crate on eyebrow

Other Projects TOF West Expect detectors to be at BNL by May 1. HBD Efforts underway MPC North New enclosure & fixture design to be based on lessons learned from south installation RXNP Design Proceeding Muon RPC Moving toward CDR in summer ‘06 Beampipe design Concept to be finalized soon Engineering Documentation Documentation/Drawings data base with web based retrieval 3D model at detector outline level with utility envelopes utility schematics

Plans to Install HBD Prototype in PHENIX (from C. Woody DC presentation)  3/8 – 3/19 Complete tests with prototype at BNL Complete gain and source tests Install mounting brackets Install and test new preamp board  3/20 – 4/2 Take detector to Stony Brook Practice installing GEMs in glove box Produce photocathode and install Test detector with CF 4 using 55 Fe source and flash lamp  4/3 – 4/9 Bring detector to PHENIX electronics room Test detector with prototype readout electronics chain  4/10 – 4/23 Install detector into PHENIX below beam pipe Test gas quality with actual gas system Test detector with prototype readout electronics in place Develop and debug readout software Calibrate with mips  4/24 – 4/30 Install detector to final position in PHENIX Collect sample of electron data ( ~ 100 e’s/pad/shift  1 week data taking) Estimate by T.Sakaguchi : min bias + ERT p>800 MeV/c

Status of Final Detector (from C. Woody DC presentation) PCB material arrived at CERN and PCB is now under construction (delivery to Weizmann ~ mid March) Panels for final detector are also under construction at Weizmann GEM’s are being produced at CERN and delivered to Weizmann for testing Aiming for completion of detector box by ~ mid April (will then ship to Stony Brook) Glove box to arrive ~ end of March Detector to arrive at Stony Brook ~ end of April Start producing photocathodes and install during May Could have final detector with 2-3 detector modules installed (all that is needed with existing prototype readout electronics) sometime during May Possible test in PHENIX end of May – early June

HBD Prototype Mounted on lift table Purpose: 1. test electrical connections 2. test gas connections 3. test system performance 4. easier access to make minor adjustments 5. minimize effect on rest of detector 2-3 weeks in this position then move to mounted position Can exist simulataneously with BLM test in this orientation

HBD Prototype Mounting Prototype can not use final design mounting due to differences in location of connectors and other basic design differences. Prototype mounting to be fabricated from fg unistrut. Design of full detector details nearly complete and ready for fabrication. Need to design cable management for signal cables

RXNP PMT in magnetic field tests Part Deux New Photo-multiplier Tubes (PMT’s) to be tested? PMT’s

20mm thick lead converter 130mm 150mm outer painting on the converter surface or stainless steel case with lead inside Pb + 2% Sb R=50mm R=180mm R=330mm 2cm thick scintillator + 2cm thick lead converter Enhance RP resolution via adding neutral particles fiber light guide flexibility of mechanical structure. 12 segments in phi and 2 segments in 2.8) Detector stable against dead channel help removing auto-correlation effect. Hamamtsu fine mesh PMT for light readout Good dynamic range and work in high field. EMCal FEE for electronic readout. good dynamic range. RXNP DETECTOR

New Beampipe for Upgrades A concept discussed between Jan Boissevain of LANL and D. Lynch of BNL. Requires suport built in to NCC and temporary isolating support to move CM.

CM Region Crane & Cable Routing Concept Cable Trays to route cables NCC Detector from Bridge CM Crane north-south & east-west motions; extended travel east to existing crane coverage Crane Supports use existing flux return notches

C-A Tasks Current Tasks General run support New storage trailer (as promised) Fix roof leaks Tasks for Shutdown 2006 Install access platforms from EC top north and MMS Replace emergency fan louvres Rewire/add IR ceiling lights on emergency power Replace WC sliding platform hoisting cables Mixing house exhaust fan maintenance

Shutdown 2006 June ’06: end run 5, prep for start of shutdown, prep EC for move to AH July ’06: TOF West installation, RXNP installation Aug. ’06: MPC North installation, HBD installation Sep. ’06: Detector subsystems maintenance, roll EC in, prep for run 6 Oct. ’06: Plan to start cooldown on Oct. 15 th Subsystems: Get requests for maintenance in early to get on theschedule Links for weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found from the web site:

PHENIX Engineering & Tech Support Web Pages Links for weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found from the web site: