BMC Cosmic Ray Test Stand Update, Dec. 2001, Steve Ahlen - Boston Univ. Gas system installed on Mod-0 (EIL-1) January 2001 Initial electrical tests January.

Slides:



Advertisements
Similar presentations
Calibration of a Modular Straw-Tube- Tracker for the COSY-TOF Experiment Sedigheh Jowzaee 3-6 June 2013, Symposium on Applied Nuclear Physics and Innovative.
Advertisements

24-Apr-15S.Movchan Straw prototype beam test into the NA48 infrastructure 1 Goals: test of straw prototype wires positioning straw bending check grounding.
NLC – The Next Linear Collider Project Colorado Univ. - Boulder Calorimetry Cornell-ALCPG Calorimetry Detector Study Plans at Colorado Uriel Nauenberg.
NLC – The Next Linear Collider Project Colorado Univ. - Boulder Calorimetry-Arlington Calorimetry Detector Study Plans at Colorado Uriel Nauenberg for.
Test Beam 2003 Some Preliminary Results CMS Week Sep-2003.
TRACK DICTIONARY (UPDATE) RESOLUTION, EFFICIENCY AND L – R AMBIGUITY SOLUTION Claudio Chiri MEG meeting, 21 Jan 2004.
Discussion on cosmogenic taggers With some thinking by : M.Weber, F.Pietropaolo, A.Guglielmi, M.Ne.
Chubaka Producciones Presenta :.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
D. Peterson, “The Cornell/Purdue TPC”, ALCPG, Snowmass, 23-August The Cornell/Purdue TPC Information available at the web site:
A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.
L3 Muon Trigger at D0 Status Report Thomas Hebbeker for Martin Wegner, RWTH Aachen, April 2002 The D0 muon system Functionality of the L3 muon trigger.
Report of the NTPC Test Experiment in 2007Sep and Others Yohei Nakatsugawa.
A.meneguzzo, 03 april 2002 LNL- MB3 chamber test with cosmic triggers Some results on the tests performed on the MB3 chambers produced in Legnaro are presented.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
PERFORMANCE OF THE MACRO LIMITED STREAMER TUBES IN DRIFT MODE FOR MEASUREMENTS OF MUON ENERGY - Use of the MACRO limited streamer tubes in drift mode -Use.
15 Dec 2010 CERN Sept 2010 beam test: Sensor response study Chris Walmsley and Sam Leveridge (presented by Paul Dauncey) 1Paul Dauncey.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
Brenda Dingus 2 June 2005 Using Multiplicity Scalers to Constrain Solar Spectra Low Threshold of Air Shower PMTs have 8 different multiplicity discriminators.
Status of TPC experiment ---- Online & Offline M. Niiyama H. Fujimura D.S. Ahn W.C. Chang.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
LNF, 26 gennaio Test Beam 2003 Data Analysis and MonteCarlo Studies M. Barone Software and Analysis Meeting ATLAS/Frascati.
BOS Testbeam Results in 2001 MPI & LMU, Munich 1. Drift time spectra 2. RT-relation 3. Resolution - HV & threshold dependance -Comparison with the 1999.
Ronald Bruijn – 10 th APP Symposium Antares results and status Ronald Bruijn.
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
Mitglied der Helmholtz-Gemeinschaft Calibration of the COSY-TOF STT & pp Elastic Analysis Sedigheh Jowzaee IKP Group Talk 11 July 2013.
BigCal Reconstruction and Elastic Event Selection for GEp-III Andrew Puckett, MIT on behalf of the GEp-III Collaboration.
Vertex 2005, Nikko Manfred Pernicka, HEPHY Vienna 1.
1 ATLAS SCT Endcap C Efficiency Measurement Nicholas Austin IoP Conference April 2009.
Status of cosmic-ray test of the SciFi prototype and SciFi software in G4MICE M. Yoshida (Osaka Univ.)
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Status of New TPC( Ⅱ ) Performance Study Yohei Nakatsugawa LEPS Meeting in Taiwan.
A. Meneguzzo Padova University & INFN Validation and Performance of the CMS Barrel Muon Drift Chambers with Cosmic Rays A. Meneguzzo Padova University.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
RPC Timing Results with Final Splitters Gianpaolo Carlino INFN Napoli The Napoli RPC Group: M.Alviggi, V. Canale, M. Caprio, G.C., R. de Asmundis, M. Della.
Test beam preliminary results D. Di Filippo, P. Massarotti, T. Spadaro.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Precision Drift Chambers for the ATLAS Muon Spectrometer
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
Wenxin Wang On behalf of LCTPC 01/11/2012W.Wang_ IEEE Conference Nuclear Science Symposium, Medical Imaging Conference & workshop on Room-Temperature.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
Six modules Micromegas TPC beam test & Test bench 12/4/2012W.Wang_RD51 mini week1 D. Attié, P. Colas, M. Dixit, P. Hayman, W. Wang.
Muons at CalDet Introduction Track Finder Package ADC Corrections Drift Points Path Length Attenuation Strip-to-Strip Calibration Scintillator Response.
TeV muons: from data handling to new physics phenomena Vladimir Palichik JINR, Dubna NEC’2009 Varna, September 07-14, 2009.
Status report - Tracking code - T.Gogami 9/30/2010.
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Tracking software of the BESIII drift chamber Linghui WU For the BESIII MDC software group.
FORWARD ATLAS {major contributions from Per Grafstrom (CERN), Michael Rijssenbeek (Stonybrook), Brian Cox (Manchester} Andrew Brandt Luminosity measurement.
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 1 96 wire planes –(8 superlayers) –50% are 3 o stereo –Uniform drift (0.88 cm cell) –30,240.
A. Calcaterra, R. de Sangro, G. Felici, G. Finocchiaro, P. Patteri, M. Piccolo INFN LNF XIV SuperB General Meeting DCH-I parallel session LNF, 27 September.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
A. Calcaterra, R. de Sangro, G. Felici, G. Finocchiaro, P. Patteri, M. Piccolo INFN LNF XIII SuperB General Meeting DCH-I parallel session Elba, 30 May.
Preliminary Analysis of the New Focusing DIRC Prototype Beam Data
Michele Faucci Giannelli
Future Plan of the Neutral Kaon Spectrometer 2 (NKS2) Experiment
Tracking System at CERN 06 and 07 test beams
Slice Test: Preliminary Data Analysis The Ohio State University
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
DESY drift chambers efficiency and track reconstruction
Cosmic ray test of RPC for the ATLAS experiment
Performance test of a RICH with time-of-flight information
2015 January February March April May June July August September
Presentation transcript:

BMC Cosmic Ray Test Stand Update, Dec. 2001, Steve Ahlen - Boston Univ. Gas system installed on Mod-0 (EIL-1) January 2001 Initial electrical tests January - March 2001 DAQ set up and debugged April - May 2001 Data taking on cosmic rays June - August 2001 Data analysis September - October 2001

BMC Test Stand concrete Mod-0 scintillators phototubes XP-2020

Mod-0 (EIL-1) on combs in clean room

Cosmic Ray Test Stand

Mod-0 on Test Stand

Threshold = 60 mV flow = 100 sccm Threshold = 44 mV flow = 100 sccm Threshold = 44 mV, flow = 500 sccm for 2 days

More timing corrections Transit time along wire Time of flight Trigger time variations due to cable/electronics variations for bottom scintillator layer Previous corrections TDC card initialization offsets (12.5 ns) Clock (synchronization of scintillator and drift tubes) Transit of light along bottom scintillator

Exact tdc vs r for special cases TDC 403 r(mm) r(mm) TDC

Time to distance function with correction factor 15 minutes data from mu062801a

Old Track Fitting Multilayer (4-tube) fits –determine the most likely position of the trajectory relative to the drift tube wire (i.e. left or right) –consider all 16 possibilities for each multilayer –least squares straight line fit obtained for each possibility –the fit with the smallest rms residual is kept Global 8-tube fit –use left/right information from multilayer fits –least squares 8-tube fit Global 6-tube fit –reject two most poorly fit tubes from 8-tube fit (eliminates some delta rays, multiple scatters, small impact parameter fluctuations) –least squares fit with remaining 6 tubes

mu070201a_f; theta < 100 mrad rms multiple scattering angle = 3.5 mrad

mu070201a_f; ML fit rms < 80 microns; theta < 100 mrad multiple scattering angle larger near beams

mu062901a_f; no scintillator cuts Residuals (mm) FWHM*1.22/2.35 = 67 microns, MS cut (4 mrad)

mu062901a_f; no scintillator cuts; 97.5% of events Residuals (mm) FWHM*1.22/2.35 = 74 microns, no MS cut

Resolution Study Use improved time-to-space function: –add correction for large impact parameter –add corrections for layer-layer variation Select layer not used for track fit Best of 128 possibilities for 7 other layers Reject worst tube Best of 64 possibilities for 6 layers Compare fit position with excluded layer’s impact parameter

mu070201a_f Impact parameter (mm) Residuals (mm) for layer 3 - 5% delta rays

mu070201a_f Impact parameter (mm) Residuals (mm) for layer 3 (res study)

mu070201a_aj; m6: ; chi6<60mic; imp: mm Residual (mm) Residuals for layer 3: FWHM/2.35 = 85 microns