Operational strategies Lean production. The adoption of techniques that help to reduce waste.

Slides:



Advertisements
Similar presentations
Lecture Network Analysis
Advertisements

Chapter 7 Project Management
464 Lecture 09 CPM Revision. Scheduling Techniques r The scheduling techniques are î To plan, schedule, budget and control the many activities associated.
Copyright 2006 – Biz/ed Critical Path Analysis.
PROJECT MANAGEMENT Network or Critical Path Analysis
Critical Path Analysis. There are no pre-requisites for this Achievement Standard so it can be placed in any course. No knowledge is pre-supposed.
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
Project Scheduling Basic Approach. projectA project is a collection of tasks that must be completed in minimum time or at minimal cost. activitiesIt is.
Manjari Akella Pranava Nagpal B-Tech(CSE) 4 th Year.
Welcome to your final year at school! Introductions.
5.8 Project Management Chapter 37 HL - Only.
CPA A house is to have new carpets fitted throughout. The work involved has been divided into a number of tasks, as shown in the table.
Operations Management
MGMT 483 Week 8 Scheduling.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Activity networks – Example 1 TaskDuration (hours)Immediate predecessors A3- B4- C6- D5A E1B F6B G7C, D, E The table below shows the tasks involved in.
Module 5 – Networks and Decision Mathematics Chapter 24 – Directed Graphs.
Project Management An interrelated set of activities with definite starting and ending points, which results in a unique outcome for a specific allocation.
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
Project Management CPM, PERT, Crashing – An Illustrative Example
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
George’s Bicycle Creating a Gantt Chart.
CRITICAL PATH ANALYSIS aka NETWORK PATH ANALYSIS DESIGNED to help managers who are planning complex projects that involve many interrelated tasks The idea.
PROJECT MANAGEMENT Syllabus Outcomes : Construct and interpret a network, identify the critical path, and calculate the free and total float. Evaluate.
A brief summary of Critical Path (or network) Analysis Critical Path Analysis is a way of planning complex projects. It allows one to find those parts.
1 DELIVERABLES OF DESIGN REVIEW 1 Statement of problem/need Customer needs Product Design Specifications (PDS) Design targets Project plan TOOLS USED TO.
IB Business and Management 5.8 Project Management (Critical Path Analysis)
Topic 5.8 ( only HL ) IB Business & Management Project Management Mr L Greenbank 1.
O PERATIONAL S TRATEGIES O PERATIONAL S TRATEGIES : L EAN P RODUCTION “Do not wait; the time will never be just right” Napoleon Hill “The clock not the.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Critical Path Analysis. Planning and Monitoring Tool.
PROJECT MANAGEMENT Approaches
Operational Research (O.R.) case studies. What’s the problem?
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
A2 Operations Management Critical Path Analysis. How long will it take? n Walls have decided to launch a new Magnum ice cream. Machine delivery will take.
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
Scheduling and Budgeting Engineers Without Frontiers CEE 402.
Unit 2 Time Management Prepared by: Prof. Seemaah Keddar.
Critical Path Analysis - Worksheet
Project Management What are businesses trying to achieve by using Operations Management? (done on AS) EFFICIENCY.
Net work Analysis/Critical Path Analysis (L1) Learning Objective – Understand CPA Learning Outcomes - By the end of the lesson students should be able.
Critical Path Analysis. Starter – The Big Breakfast! On Saturday, I want to cook myself a big breakfast.I want to have some toast, scrambled eggs and.
Network planning models These project scheduling techniques model the project's activities and their relationships as a network. In the network, time flows.
First name ??? ist auf Englisch. Critical Path Analysis.
Lean Production: Critical Path Analysis 3.15 Lean Production Objectives; Understand the key requirements of critical path analysis (CPA) Understand the.
Copyright 2006 – Biz/ed Critical Path Analysis.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Chapter 16 – Project Management
Critical Path Analysis (CPA)
Critical Path Analysis
UNIT II Scheduling Procedures & Techniques FLOAT
Critical Path Analysis
Activity networks – Example 1
Project Scheduling Lecture # 1.
Lean Production.
Critical Path Analysis (CPA)
UNIT II Scheduling Procedures & Techniques CRITICAL PATH ANALYSIS
Analysing the AoA network
Welcome to your final year at school!
Critical Path Analysis
Activity on Node Approach to CPM Scheduling
PROJECT MANAGEMENT (BSBI 622)
Project Management (lecture)
Project Planning By Phaik San Liew.
CPA – Information Sheet
Project Management (lecture)
Critical Path Analysis
Critical Path Analysis
Have a think…! What process do you need to go through to make bread or redecorate your bedroom? Are there any activities that could be done at the same.
Presentation transcript:

Operational strategies Lean production

The adoption of techniques that help to reduce waste

Lean production techniques Just-in-time (JIT) Kaizen Time-based management

Just-in-time A philosophy that aims to reduce waste by limiting the stock holding at each stage of the production process.

Kaizen An approach to improving the efficiency and performance of a business through continual improvement.

Time-based management Aims to reduce waste. The focus is on reducing the time wasted or or unproductive time to improve efficiency.

Critical path analysis (CPA) The use of network diagrams to help plan a complete projects in the shortest time possible by identifying those activities that can be carried out simultaneously.

Possible uses of CPA Marketing campaign Launch of a new product Opening a new store relocating a business Automating the production process

Building a house A house-building project involves the following tasks: Designing the house Building the walls Digging the foundations Designing the interiors Connecting to the utilities Clearing the land Fitting the windows Plastering Installing lighting and electrical sockets Internal decoration Putting the roof on Purchasing construction materials Fitting the plumbing & central heating

Task 1.Sort these activities into a rough sequence 2.Determine which activities cannot start until others have finished

Building a house network diagram Design Clear Foundation Purchasing Design Interiors Walls Roof Windows Connect Utilities Lighting Plumbing Plastering Decoration

Features of CPA Nodes – Signify the end of the activity and the start of the next activity EST – earliest start time an activity can start LFT – latest finish time of the previous activityNumber of the node

Activities – the events or tasks that consume time and are shown as lines that link the nodes onto the network diagram. A letter is placed above the line to show that activity. A 4 Duration – the length of time that it takes to complete an activity

Completing the timings When you have completed the critical path diagram you need to add the time it takes each activity, so you can see how long the project will take. Add the duration of the activity below the line of the corresponding activity. Design 6

EST and LFT Earliest Start Time – Work forward ( from left to right) to calculate the EST’s. The EST in the first node is shown as zero. For subsequent activities the EST is found by adding the sum of the durations of the activities on the path that leads upto the node that represents the start time for that activity. If there is more than one path to a node, the highest total is taken as the EST.

Completing the latest finish times Latest Finish Time – Once the EST’s have been finished, work backwards from right to left to calculate the LFT’s. The LFT in the final node must equal the EST because a final activity must be on the critical path. Moving from right to left deduct the duration of the activity in order to calculate the LFT of the previous activity. If there is more than one path working backwards to a node, the lowest total is taken as the LFT.

Adding the figures to the diagram These figures are written into the nodes. LFT – latest finish time of the previous activity EST – Earliest start time of the next activity Node number

Plotting the critical path The critical path is the sequence of activities that can not be delayed without delaying the overall completion of the projects. It is represented by those activities that: Have LFT’s identical to their EST’s Represent the longest path between the nodes Non critical activities are those that can be delayed without extending the completion time of the project.

Business implications of CPA Efficiency benefits If a business can reduce the time taken to complete a project, it can translate these savings in time into cost savings. The process lets a business know precisely when activities are going to take place – Assists the business in the resource planning. The business can use CPA to investigate changes in resources or sequencing that would improve efficiency. eg. Resources can be transferred from a non critical activity to one on the critical path. CPA can be used to help control and review

Problems of using CPA It can encourage rigidity As every activity in a network is strictly timetabled, it can lead to greater inefficiency if a crucial activity is delayed. Complex activities may be difficult to represent accurately on a network. May be a tendency to believe hard work is done when the CPA has been completed. CPA relies on estimates of the expected duration of activities. CPA encourages businesses to focus on speed of completion of a project.