STGC Front end boards sTGC Front end boards NSW Electronics workshop November 2013 L. Levinson Weizmann Institute NSW Electronics workshop, November 20131L.

Slides:



Advertisements
Similar presentations
Ancillary firmware for the NSW Trigger Processor Lorne Levinson, Weizmann Institute for the NSW Trigger Processor Working Group NSW Electronics Design.
Advertisements

E-link IP for FE ASICs VFAT3/GdSP ASIC design meeting 19/07/2011.
SolidWorks layout MMFE-8 1 FPGA. MMFE-8 PCB 2 MMFE_8 w/ FPGA Block Diagram Artix XC7A200T- 2FBG676Cv VMM 1.2 VDC_Analog VMM 1.2 VDC_Digital FPGA 1.8/1.2/1.0.
STGC pad, wire and strip segmentation Daniel Lellouch Weizmann Institute Parameter book:
Requirements for the NSW VMM3 readout ASIC and the NSW Readout Controller ASIC NSW Readout Working Group NSW Electronics Design Reviews, February 2015.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
GEM Design Plans Jason Gilmore TAMU Workshop 1 Oct
C-Card and MMFE using the BNL Peak Finding ASIC (VMM1) Ken Johns, Joel Steinberg, Jason Veatch, Venkat Kaushik (U. Arizona)
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
Overview of NSW trigger electronics Lorne Levinson NSW Electronics Design Reviews, February Lorne Levinson, Overview of NSW trigger electronics.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
Larg. Week, April 2002, Electronics Meeting1 Progress Report On Electronics Activities in Paris Bertrand Laforge LPNHE Paris CNRS/IN2P3 – Universités Paris.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
VELO upgrade Front-end ECS LHCb upgrade electronics meeting 12 April 2012 Martin van Beuzekom on behalf of the VELO upgrade group Some thoughts, nothing.
Muon New Small Wheel sTGC Trigger for Phase I ATLAS New Small Wheel Electronics Workshop Les Houches December 2012 Lorne Levinson L. Levinson, December.
Design & test of SciFi FEB
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
STGC Trigger Demonstrator sTGC Trigger Demonstrator ATLAS Israel Annual Meeting 30 December 2012 Lorne Levinson, Julia Narevicius, Alex Roich, Meir Shoa,
The ATLAS New Small Wheel Trigger Lorne Levinson For the ATLAS NSW collaboration ACES workshop, 19 March 2014 Thanks to my NSW colleagues for many slides.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
27 th September 2007AIDA design meeting. 27 th September 2007AIDA design meeting.
Elec 関係、情報収集 ( 中。。 ). Design review for NSW electronics (2015/2) Design review for NSW ASIC (2015/4)
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
CMS HL-LHC EM Calorimeter Upgrade M. Hansen, CERN.
CLIC and ILC Power Distribution and Power Pulsing Workshop Summary Document 10/5/2011G. Blanchot1.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
Calorimeter upgrade meeting - Thursday, 3 April CU (Calorimeter Crate Controller for the Upgrade) Board architecture overview Introduction  Short.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
Mini-2 and MMFE-8 Status at U. Arizona Kenneth Johns, Charlie Armijo, Bill Hart, Karen Palmer, Sarah Jones, Kayla Niu, Jonathan Snavely, Dan Tompkins University.
Transfering Trigger Data to USA15 V. Polychonakos, BNL.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
Level-1 Data Driver Card (L1DDC) HEP May 2014 Naxos 08/05/2014HEP 2014, NAXOS Panagiotis Gkountoumis National Technical University of Athens.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
Status of the Beetle front-end chip carrier for SRS Lorne Levinson Weizmann Institute of Science Rehovot, Israel L. Levinson, Weizmann Institute, Nov.
FELIX Design FELIX Design Upgrades of detector readout meeting 9 June 2014 Lorne Levinson, for the FELIX group Upgrades of detector readout meeting, 9.
Prototyping electronics and data acquisition for sTGC
STGC Trigger Electronics sTGC Trigger Electronics ATLAS New Small Wheel Milestone Meeting January 2013 Lorne Levinson L. Levinson, sTGC Trigger Electronics1NSW.
≈450 mm 50 x 220 mm 2 ≈450 mm 50 x 220 mm 2 Electronics boards Size: 50 x 220 mm 8 VMM chips à 64 ch Total: 512 ch/board Zebra contact Arrangement of electronics.
Overview of NSW trigger electronics Lorne Levinson Weizmann Institute of Science TDS and ART ASIC Design Review, 21 July Lorne Levinson, Overview.
Consideration of the LAr LDPS for the MM Trigger Processor Kenneth Johns University of Arizona Block diagrams and some slides are edited from those of.
Muon New Small Wheel sTGC Trigger for Phase I ATLAS NSW sTGC Workshop July 2012 Lorne Levinson, Nachman Lupu, Giora Mikenberg, Julia Narevicius,
Within ATLAS both TILECal and LAr are planning upgrades to the readout systems - current systems will reach limits on radiation exposure aging of components.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
2 March 2012Mauro Citterio - SVT Phone meeting1 Peripheral Electronics Some updates Mauro Citterio INFN Milano.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
Current STS Readout Concept 1 FEB 8 STS-XYTER Electrical Interface SLVS/LVDS pairs/FEB ROB GBTx / VL Optical Interface 4 MM fibers /ROB DPB.
GEM Integrated PCB readout and cooling
LHCb Outer Tracker Electronics 40MHz Upgrade
of the Upgraded LHCb Readout System
On behalf of the ATLAS muon collaboration
DAQ Requirements M. Villa 21/02/2011.
n-XYTER Hybrid Developments
Kenneth Johns University of Arizona
S. Baron - BE/BI-PH-ESE GBT/VL meeting
LATOME LAPP Nicolas Dumont Dayot on behalf of the LAPP team
VMM Update Front End ASIC for the ATLAS Muon Upgrade
NSW Electronics workshop, November 2013
Front-end digital Status
Front-end electronic system for large area photomultipliers readout
Status of n-XYTER read-out chain at GSI
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
GEM-based Digital Hadron Calorimetry for SiD
RPC Electronics Overall system diagram Current status At detector
Presentation transcript:

sTGC Front end boards sTGC Front end boards NSW Electronics workshop November 2013 L. Levinson Weizmann Institute NSW Electronics workshop, November 20131L. Levinson

NSW Electronics workshop, November sTGC Front end boards

Issues  FE boards on both edges of chamber to balance heat  to avoid cables from side-to-side, need GBT on each edge   2 GBTs per quadruplet instead of GBT per layer  cabling is self-contained in one quadruplet  loss of one GBT means quadruplet lost MM does GBT per layer for 4 quadruplets Signal integrity Zebra connectors, same as for MM Slow Control Adapter, SCA, ASIC on every FEB for – Configuration of VMM and TDS via I 2 C – Temperature and voltage monitoring – Calibration of VMM? E-link connectors from FEB to GBT board: candidate: twinax ribbon Component height restriction: 9mm DC-DC height? ?separate analog, digital gnds for VMM L. LevinsonNSW Electronics workshop, November 20133

E-links E-link to each Companion, 80Mb/s 6 or 7 per strip FEB, 2 per pad/wire FEB  clock  TTC  data (If FELIX streams are used, status/monitoring data can also be sent on this link.) E-link to SCA, 80Mb/s, one per FEB  clock  configuration  configuration reply Can there be single clock pair from GBT? bussed or find a rad tol SLVS fan-out chip L. LevinsonNSW Electronics workshop, November 20134

Wire group “FEB” Flex PCB to extract wire signals and bring them to FEB on edge Wires are read out by single VMM per layer on the Pad FEB Wire VMMs need extra protection: transient suppressor Max 64 wire groups per detector L. LevinsonNSW Electronics workshop, November 20135

VMM2 board for trigger demonstrator 128 channels Design in progress L. LevinsonNSW Electronics workshop, November 20136