Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander.

Slides:



Advertisements
Similar presentations
New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.
Advertisements

SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Tam Valley School Modernization - Phase 1 Summer 2011.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
Yakima Air Terminal.  Project Overview  Project Schedule  Impacts  Project Status  Questions.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
CERT MEOC Mobile Emergency Operations Center Concept designed by Keith Morin & Associates - Tucson, AZ.
Mission Support Construction Update Mr. Jim Schaefer HQ PACAF/CEC.
Yakima Air Terminal.  Project Overview  Project Schedule  Impacts  Project Status  Questions.
Madison Elementary School District #38 Construction update Bond & Capital 6/5/12.
Why We Need It?  Lack of Space  Need to Meet Code Requirements  Inadequate Communications & Technology  Facility Maintenance Issues.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
COSCAP-SA Maintenance Facilities & Job Descriptions.
Reconstruction of the Eads Bridge Highway Deck
Hydrogen Workshop for Fleet Operators. Module 3, “Vehicle Operations and Maintenance Facilities”
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Agrochemicals and Security: Developing a Hazard Mitigation PlanHazmit-01 Developing a Hazard Mitigation Plan Agrochemicals and Security Developing a Hazard.
ENJJPT SC #68 T-6A Programs Mr. Patrick Frye AFLCMC/WLZ (JPATS) Air Vehicle Lead (Deputy) XX September 2014.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Greening Affordable Housing on a Budget or Where There's a Will, There's a Way.
Woodland District 50: Operations and Facilities Report Energy Update 2012 Summer Work Five-Year Facility Plan Service Maintenance Agreement Night Time.
Presented to: Pacific Aviation Directors Workshop Prepared By: Frank Mesa, Manager, Guam NCE SSC Place & Date: Westin Hotel Guam March , 2012 Federal.
TOWN OF WALPOLE FACILITIES PLAN UPDATE SPRING ANNUAL TOWN MEETING MAY 7, 2014.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Remanufactured Engines An Economical Solution. Lift Truck Operating Applications l Light Duty - clean environment, short runs, improved level surfaces.
High School Task Force DECATUR PUBLIC SCHOOLS 02/03/2009.
Maintenance Overhaul Shops (off-Aircraft)
Puesta Del Sol II Progress and Update Report May, June, & July, 2000.
Presented to: By: Date: Federal Aviation Administration Downloaded from How to Survive A Ramp Check Aircraft Operator Maintenance Responsibilities.
 Electric service = 600 kilowatts  Facility demand = 560 kilowatts  Generator capacity = 180 kilowatts  Emergency generator is only capable of powering.
Phase I Decommissioning Project Update West Valley Demonstration Project Presented by: Bryan Bower, Department of Energy November 14, 2012.
Projects, Facts and Figures 1. Agenda A. Anticipated Use of Bond Funds B. Explanation of Texas’ Taxing Structure C. Tax Impact and History D. Election.
11th Wing The Chief’s Own! Lt Col Rockie Wilson, PE Commander, 11th Civil Engineer Squadron SMART Procurement Conference: Joint Base Andrews Infrastructure.
STRATEGIC ASSET MANAGEMENT ASSISTANT CHIEF FIRE OFFICER PAUL SOUTHERN.
ENJJPT SC #69 T-6A Programs Mr. Patrick Frye AFLCMC/WLZ (JPATS) 17 February 2015.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Selecting Suitable Equipment
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
WELCOME!. Who is T&T Power Group? WELCOME! Who is T&T Power Group? What can we do for you?
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
City Council March 4, Capital Improvement Plan 1/14/2014Budget staff sent CIP forms and instructions to divisions 1/28/2014Projects submitted.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Air Force Design & Construction Mr. Robert Gill, P.E. 1.
 POWDERWOOD AT LANDMARK HOMEOWNERS ASSOCIATION 2016 Annual Meeting Thursday March 31, 2016.
San Francisco Fire Department Facilities Update.
City Council April 1, Capital Improvement Plan 1/14/2014Budget staff sent CIP forms and instructions to divisions 1/28/2014Projects submitted.
Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” Wing Commander Program Status Briefing Colonel Gregory Keeton Wing.
CITY COUNCIL OCTOBER 18, 2011 Central Park Gazebo Replacement.
1 Common Cause Modeling Huntsville Society of Reliability Engineers RAM VIII Training Summit November 3-4, 2015 Frank Hark Bastion Technologies, Inc. Paul.
City Council March 6, Capital Outlay Priorities Infrastructure  Reconstruction of Bell St. from Concho River to Old Ballinger Hwy  Reconstruction.
Meeting Nantucket’s demand for electricity, today and tomorrow. Upgrading Nantucket’s Electric Grid.
Recruit, Train, and Educate Airmen to Deliver Airpower for America ENJJPT Steering Committee Briefing Facility Projects Mr. Christopher Coppala Air Education.
Solar Water heating System information card
Update on the PSB Cooling and Ventilation Systems
Making use of Energy lesson 8
Welding Welding should not be performed except in designated areas. Any part to be welded should be removed from the aircraft, if possible. Repair would.
2015 School Bond Construction Program
Background B513 built in early 1970’s for mainframe era.
Don’t Drip & Drive Phase 2 Strategy
Capital Improvements Presentation
Condominiums Association
AIR CONDITIONING AND HEATING REFRIGERATION SERVICES AIR CONDITIONING AND HEATING REFRIGERATION SERVICES Karalis Mechanical Expert local air conditioning.
Crescent City Harbor District Solar Project Proposal
Shipboard Composite Repair Challenges
USS CARL VINSON AIR DEPARTMENT
354th Contracting Squadron “Icemen Buy, Eielson Flies!”
Society of Military Engineers Monthly Meeting, October 11, 2018
Presentation transcript:

Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander March

Current DescriptionEstimate Aircraft Paint Barn Renovation$2,000K TOTAL$2,000K Alternative FY15 Projects Replace Cooling Tower (Building 2320)$500K Aircraft Composite Maintenance Clean Room (Building 2320)$380K Taxiway J Shoulder Repair$450K Repair and Upgrade Electrical Systems, Shop Areas (Building 2320)$210K Repair Electrical Distribution Hangar 2406$200K Replace Roof Hangar 2402$260K TOTAL$2,000K FY15 Wing CC Projects (Alternative Proposal) 2

Replace Cooling Tower (Building 2320) Supports the cooling system for the entire ENJJPT Squadron Ops Building 12 years old and beyond economical repair…normal service life is 7 – 9 years Rated RED by installation’s civil engineer “Most likely of any cooling tower at Sheppard AFB to go inoperable at any time.” No feasible work around if failure occurs during the peak summer heat periods 3

Composite Clean Room Advanced Composite Clean Room Zero particle “clean” room needed to accomplish repair to composite fiberglass and carbon fiber aircraft panels and components New T-38 flight controls New T wing panels T-6 flight controls and engine cowling panels Without clean room, maintenance and repairs or composite components is not authorized which would require shipping components for repair or purchasing new components 4

Taxiway J Shoulder Repair Existing shoulders must be repaired Originally installed in 1959 Adjacent to T-6 power check pads and ENJJPT ramp Asphalt surface is brittle, crumbling and creating FO No longer maintainable…“unsustainable” Existing shoulder width reduced from 50’ 30’ width for east shoulder to Taxiway Kilo for emergency vehicle access from the north fire station 10’ width for west shoulder Shoulder area not repaved returned to sod

Taxiway J Shoulder Repair ENJJPT Ramp T-6 Power Check Pad North Fire Station Emergency Vehicle Access AGE Storage

Other Repair and Upgrade Electrical Systems, Shop Areas (Building 2320) Upgrade electrical panels and circuits to reduce partial outages Repair Electrical Distribution Hangar 2406 (T-38 Phase Dock) Provide additional outlets for T-38 maintenance Replace worn out electrical panels which overheat during summer months Replace Roof Hangar 2402 (Paint Barn) Roof leaks during rain events in several locations within the paint room negatively impacting aircraft painting operations 7

QUESTIONS/COMMENTS RAISE WARRIORS!!! 8