1 DR -> IP Beam Transport Simulations with Intra-Train Feedback Glen White, SLAC Jan 19 th 2006.

Slides:



Advertisements
Similar presentations
Emittance dilution due to misalignment of quads and cavities of ILC main linac revised K.Kubo For beam energy 250 GeV,
Advertisements

Emittance dilution due to misalignment of quads and cavities of ILC main linac K.Kubo For beam energy 250 GeV, TESLA-type optics for 24MV/m.
1 MULTI-BUNCH INTEGRATED ILC SIMULATIONS Glen White, SLAC/QMUL Snowmass 2005.
Main Linac Simulation - Main Linac Alignment Tolerances - From single bunch effect ILC-MDIR Workshop Kiyoshi KUBO References: TESLA TDR ILC-TRC-2.
ILC BDS Alignment and Tuning Studies Glen White SLAC/QMUL 8 November 2005 Progress report and ongoing plans for BDS alignment and tuning strategy.
Transport formalism Taylor map: Third order Linear matrix elementsSecond order matrix elements Truncated maps Violation of the symplectic condition !
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Web-Based ILC Multi-Bunch Simulation Database Glen White (SLAC / QMUL) ILC MDI Workshop SLAC, Jan 8th 2005.
SLAC ILC Accelerator: Luminosity Production Peter Tenenbaum HEP Program Review June 15, 2005.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
NLC - The Next Linear Collider Project “Slow” Feedback Requirements: Deflections and Luminosity Linda Hendrickson IPBI Meeting, SLAC June 26, 2002.
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
For Draft List of Standard Errors Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)
BPM Orbit Data Analysis with Wakefields Glen White, SLAC January 2013.
NLC Intra-Pulse Fast Feedback Simon Jolly Oxford University NLC Beam Delivery Meeting July 2001.
Feedback On Nano-second Timescales: An IP Feedback System for the Future Linear Collider Requirement for a fast IP beam-based feedback system Simulation.
ILC Start-End Simulations Glen White, SLAC May 13, 2014 AWLC14, Fermilab.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
ILC Feedback System Studies Nikolay Solyak Fermilab 1IWLC2010, Geneva, Oct.18-22, 2010 N.Solyak.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
11th December 2007 LET workshop, SLAC 1 Beam dynamics issues in Beam Delivery System Deepa Angal-Kalinin ASTeC, Daresbury Laboratory.
Isabell-A. Melzer-Pellmann ILC-tech meeting, Status report of offset and angle studies with Guinea-Pig Status report of offset and angle studies.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
FD Jitter Tolerance Study Min-Huey Wang. 2 Introduction Investigate three BDS designs L* 4.5 m, L* 4.0 m and L* 3.5 m. Using 500 GeV baseline parameters.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
Design of the ATF2 FB/FF Systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group Final EUROTeV Scientific Workshop Uppsala, 25-27th.
Design and Simulation of Intra-train Feedback Systems at ATF2: Current Status and Future Plans Javier Resta Lopez (JAI, Oxford University) for the FONT.
1 Alternative ILC Bunch Compressor 7 th Nov KNU (Kyungpook National Univ.) Eun-San Kim.
1 Alternative Bunch Compressor 30 th Sep KNU Eun-San Kim.
SLAC SD0/QD0 Cryomodule Jitter Tolerance Glen White SLAC March 27 th 2007.
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
Design of ATF2 feedback/feed-forward systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group LC-ABD meeting Birmingham, 17-18th.
BDS Alignment, Tuning, Feedback update and Integrated Simulation Plans Glen White.
Main Linac Tolerances What do they mean? ILC-GDE meeting Beijing Kiyoshi Kubo 1.Introduction, review of old studies 2.Assumed “static” errors.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
Beam Dynamics IR Stability Issues Glen White / SLAC September IRENG07 Vibration tolerances for final doublet cryomodules Settlement of detector.
Isabell-A. Melzer-Pellmann LET Beam Dynamics Workshop, Lumi scans with wakefields in Merlin Lumi scans with wakefields in Merlin Isabell-A.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Beam-beam Simulation at eRHIC Yue Hao Collider-Accelerator Department Brookhaven National Laboratory July 29, 2010 EIC Meeting at The Catholic University.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
BDS, Start to End Simulation, Simulation Codes Summary D. Schulte.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Luminosity Issues for LC BDS Glen White, SLAC LCWS2013, Tokyo November 12, 2013.
Wakefield effect in ATF2 Kiyoshi Kubo
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
1 Updated comparison of feedback implementation for e + e - and e - e - modes of operation with realistic errors in the BDS M. Alabau Pons, P. Bambade,
ILC Main Linac Beam Dynamics Review K. Kubo.
ILC BDS Alignment, Tuning and Feedback Studies
In collaboration with P. N. Burrows, A. Latina and D. Schulte
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Beam Dynamics in Curved ILC Main Linac (following earth curvature)
SD0/QD0 Cryomodule Jitter Tolerance
MULTI-BUNCH INTEGRATED ILC SIMULATIONS
Accelerator Physics Technical System Group Review
MULTI-BUNCH SIMULATIONS OF THE ILC FOR LUMINOSITY PERFORMANCE STUDIES
Start-to-End Simulations for the TESLA LC
Presentation transcript:

1 DR -> IP Beam Transport Simulations with Intra-Train Feedback Glen White, SLAC Jan 19 th 2006

2 Multi-Bunch ILC Simulations Generate a representation of the ILC bunch train at a ‘snapshot’ in time to study the ILC machine Luminosity performance with ground motion and other error sources for different machine parameters. Track 600 bunches through Linac, BDS and IP to observe dynamics of fast feedback correction (IP position and angle) + Lumi feedback and determine estimate of train luminosity. Use PLACET for Linac simulation and MatMerlin for BDS (GUINEA- PIG used for IP collision). Model case of tuned lattice + 1 pulse of GM (Linac + BDS). TESLA TDR & ILC IR-1 (20mrad IP x-ing) BDS currently implemented. Typical simulation times 60 hours+ depending on simulation parameters (per seed). To gauge performance for a variety of parameters/simulation environments/machines need many CPU hours.

3 Parallel Computing Infrastructure QMUL HTC MDCE – 256 nodes GRID Interface …... GRID MySQL Database PHP-Web Interface ……

4 Linac Simulation PLACET: Train enters linac with 20nm vertical emittance. Structure Misalignment: 0.5mm RMS y, 0.3mrad y’ error. Long- and short-range transverse and longitudinal wakefield functions included. BPM misalignment: 25um (y). Apply 1-1 steering algorithm. Pick random seed which gives 50% emittance growth. Apply y, y’ RMS Injection error. Apply Inter-Train Ground Motion (K- Model). Generate 600 bunches (multiple random seeds). Long-range wakes have strong effect on bunch train. Need to perform steering on plateau not first bunch.

5 BDS/IP Simulation MATMERLIN: Inter-Train Ground motion applied (K-model). Add 1.4ppm energy jitter on e - bunches (simulates passage of e - ’s through undulator). Track 80,000 macro-particles per bunch. Feedback (Simulink model in Matlab): BPM Resolution: 2  m (ANG FB) 5  m (IP FB) Kicker errors: 0.1% RMS bunch-bunch. IP (Guinea-Pig): Input macro-beam from MatMerlin BDS (non-gaussian). Calculates Lumi & Beam-Beam kick. Produces e + e - pairs -> track through solenoid field and count number hitting LCAL first layer for Lumi FB signal.

6 IP Fast Feedback System Detect beam-beam kick with BPM(s) either side of IP. Feed signal through digital feedback controller to fast strip-line kickers either side of IP. Digital PI control algorithm is used for feedback algorithm.

7 IP Fast Feedback System

8 IP-Angle Feedback System Place kicker at point with relatively high  function and at IP phase. BPM at phase 90 0 downstream from kicker. To cancel angular offset at IP to 0.1  y’ level : BPM required resolution ~ 2um FB latency = 4 bunches. Other FB locations possible: Start of BDS to act as a pulse-flattener to reduce orbit error Requires ~100nm BPM resolution with these optics. ANG Kicker IPBPM Sqrt(  / m S /m

9 Banana Bunches Short-range wakefields in accelerating cavities acting back on bunches cause systematic shape distortions: Z-Y plane of a sample bunch: Only small increase in vertical emittance, but large loss in luminosity performance with head-on collisions due to strong, non-linear beam-beam interaction. Change in beam-beam dynamics from Gaussian bunches.

10 Banana-Bunch Dynamics Luminosity of a sample bunch over range of position and angle offsets. Feedback strategy: wait for IP and ANG FB systems to ‘zero’ (coloured ellipse in figure)– then fine tune by stepping in y then y’ using LUMI monitor (count e + e - hits in first layer of BeamCal) to find optimum collision conditions.

11 Banana-Bunch Dynamics Luminosity of a sample bunch over range of position and angle offsets. Feedback strategy: wait for IP and ANG FB systems to ‘zero’ (coloured ellipse in figure)– then fine tune by stepping in y then y’ using LUMI monitor (count e + e - hits in first layer of BeamCal) to find optimum collision conditions. Recent simulation results suggest better results possible with 2-D scan.

12 IP Feedback Single example seed shown. Corrects < 10 bunches. Corrects to finite  y due to banana bunch effect. Vertical Beam-Beam bunch Bunch e + e - Int. Signal

13 Angle Feedback Single example seed shown. Angle scan after 250 bunches when position scan complete. Noisy for first ~100 bunches (HOM’s). FB corrects to <0.1  y’

14 Luminosity Luminosity through example seed bunch train showing effects of position/angle scans. Total luminosity estimate: L(1-600) + L( )*( )/50

15 Luminosity – 100 Seeds ILC-IR1 350 GeV (left) 500 GeV (right) CME. No improvement seen with addition of upstream FFB system.

16 Luminosity vs. IP Beam Size 350 GeV CME 500 GeV CME Lumi not directly proportional to IP beam spot size due to banana- beam effect.

17 Effect of Lumi-Scan (500 GeV) Effect of Pos & Ang Lumi scans compared with start of pulse with FB only. Angle feedback gives only small improvement. After position scan After position and angle scan

18 Simulink Model

19 2-D Lumi Feedback

20 2-D Lumi Feedback

21 ILC Simulation Web Page Store all beam data from simulation runs online

22 Summary and Plans Facility for parallel processing of accelerator codes set-up. Shown here to test ILC performance with Fast-Feedback. Final luminosity performance appears to be limited by banana- bunch shape. Add full Linac + BDS alignment and inter-pulse feedback to provide full time-evolved simulation. Add Crab Cavities to study crossing angle stability (requires addition of x-feedback) Other lattices + Beam Parameters 500 & 1000 GeV). Add Collimator Wakes.