Office Name Goddard Space Flight Center 1 Proposed SCaN-Cx Interface Study Approach Dave Israel August 24, 2007.

Slides:



Advertisements
Similar presentations
Systems Analysis and Design Feasibility Study. Introduction The Feasibility Study is the preliminary study that determines whether a proposed systems.
Advertisements

FAA/JCAB ATN & AMHS Trial Varadero, Cuba May 2002 Presentation ATN 3.2 by H. Tran.
Introduction to Project Management Avneet Mathur
Stephen S. Yau CSE , Fall Security Strategies.
IS&T Project Management: Project Management 101 June, 2006.
Introduction to Project Management The Basics for Sustainability Management Students.
Development plan and quality plan for your Project
Network Configuration Management hite_paper0900aecd806c0d88.html.
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
G O D D A R D S P A C E F L I G H T C E N T E R 1 The Trade Between CCSDS and HDLC Framing on Global Precipitation Measurement David Everett and Jonathan.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Project Management: Madness or Mayhem
Web Development Process Description
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
Edward B. Farkas, Managing Director, Project Management Practice
Voice over IP Spring LNA Meeting April 1, What is Voice over IP? n A technology for transporting integrated digital voice, video and data over IP.
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
1 CROSS SUPPORT SERVICE ARCHITECTURE Takahiro Yamada (JAXA/ISAS) CCSDS Meeting, Heppenheim, Germany 2 October 2007.
An EDI Testing Strategy Rosemary B. Abell Director, National HIPAA Practice Keane, Inc. HIPAA Summit IV April 24-26, 2002.
Rational Unified Process Fundamentals Module 4: Disciplines II.
K-12 Web Content Development Process
SISG - SSI ADD Service, Physical, and Protocol View Document Figures Ver 0.4, 2 Sept 09 Peter Shames, et al.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
June 2004 SIW-4 - IP in Space Implementation Guide 1 Handbook for Using IP Protocols for Space Missions James Rash - NASA/GSFC Keith Hogie, Ed Criscuolo,
Boston University Project Management Association Website Development Group 3 Team3 CS632 Dr. Vijay Kanabar Team Members Mario Soto Emily Ziegler Kevin.
SOFTWARE SYSTEMS DEVELOPMENT 4: System Design. Simplified view on software product development process 2 Product Planning System Design Project Planning.
Data and Computer Communications Circuit Switching and Packet Switching.
CMC, 26 Oct. 05 Page 1 JAXA CCSDS Status October 26, 2005 CMC Reston, VA, USA Yoshitaka Taromaru Nobuhiro Yagi JAXA CCSDS Secretary Office.
1TAP Masterplanning kick-off25 September 2012 TAP TSI Masterplanning Overview of RU/IM obligations Masterplanning Kick-off Brussels, 25 September 2012.
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.
SOFTWARE PROJECT MANAGEMENT
BITTT and CCSDS in China October About BITTT BITTT is the abbreviation for Beijing Institute of Tracking and Telecommunications Technology.
Oregon Benefits Online Scope to System Comparison 1.
CCSDS Fall Meeting at ESTEC
NASA Space DTN Program Keith Scott SIS-DTN WG Wednesday Afternoon 28 October 2009SIS-DTN 1.
The CCSDS Cislunar Communications Architecture Keith Scott The MITRE Corporation CCSDS Meeting January 2007.
April 5, 2007 Networks Integration Management Office Mission Support Process Networks Integration Management Office; Code
ESSRT In-Process Review September 10, Agenda 1.Work Completed Till Date 2.Scope of future activities and deliverables 2.
Approved For Public Release © The Aerospace Corporation 2009 June 17, 2009 Initial Summary of Human Rated Delta IV Heavy Study Briefing to the Review of.
NEM201 Week 4 Project Plan Create and complete outstanding items. 01. Front Cover 02. Document details 03. Scope Document 04. Technical Design 05. Creative.
CHAPTER 7 – Managing Project Schedules. “Plan the Work” “Work the Plan” “Endorse the Plan” + 10% of Project effort + 90% of Project effort “Align the.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
Overview PRINCE Hogeschool Rotterdam. 2 Project definition  A project is a temporary organization that is created for the purpose of delivering.
The Consultative Committee for Space Data Systems JAXA CCSDS Status to CMC/8Dec04/K.Narita Page 1 JAXA Agency Report to CMC and ISO/SC13 Kaneaki Narita.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
February 14, 2013 POIWG Technical Overview CR / HM-3430 Ku Forward Capability.
ISS Team Group Member ◦ Nguy ễ n Nh ậ t Minh ◦ Nguy ễ n Kh ắ c Khu ◦ Ph ạ m Ng ọ c Hi ế u ◦ Nguy ễ n Ng ọ c Khánh ◦ Nguy.
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
Committee on Information Technology Planning and Budget Sub-Committee Board of Supervisors Assessment Appeals System April 27, 2012.
Next Generation Uplink Options already within our Grasp
Camera PDR/CD1 Planning 19 September 2008
Introduction to Project Management
Green Line Extension Project
Software Engineering Management
Service Management World Class Operations - Impact Workshop.
Service, Physical, and Protocol View Document Figures
Systems Architecture WG: Charter and Work Plan
SIS-DTN WG Wednesday Afternoon
BITTT and CCSDS in China
Project Management.
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Introduction to Project Management Avneet Mathur
Adam Schlesinger NASA - JSC October 30, 2013
FAA/JCAB ATN & AMHS Trial
Project Initiatives Identified by the CIA Project
An EDI Testing Strategy
Portfolio, Programme and Project
Web Service Security support in the SSE Toolbox
Project Kick-off <Customer Name> <Project Name>
Presentation transcript:

Office Name Goddard Space Flight Center 1 Proposed SCaN-Cx Interface Study Approach Dave Israel August 24, 2007

Office Name Goddard Space Flight Center 2 Study Subject Fundamental question: “Should the baseline plan for SCaN support of Cx ISS phase include a service interface to the ground stations at the link layer or network layer?” Two basic options for initial Cx support: One uses SLE, one does not. –Out of scope of this initial activity AOS/HDLC discussions Use of IP discussions LDPC Requirements are based on SCaN-Cx MOA and its referenced documents

Office Name Goddard Space Flight Center 3 Specific Trade Study Only focus on items that are different between the two options Small team –Bring in technical expertise as needed for testing, demonstrations, or review –Use existing work from other activities for starting points and work with single points of contact for more information –Maintain alignment with CNST, SCIP, SNIS, Standards, and other related activities Provide updates and receive concurrence from SCaN (J. Rush & A. Hooke) and SCIP (R. Miller & J. Hudiburg) throughout the activity

Office Name Goddard Space Flight Center 4 Deliverables and Schedule Assumptions used for study Itemized documentation of each option’s ability to meet Cx requirements Performance study results Demonstration of both options performed with GSFC CSTL and JSC Delta cost between two options –Implementation –Operations –Future expansion Documentation of role and responsibility allocation between Cx and SCaN for each option Risk Identification and mitigation strategies List of open issues Pros/Cons/Recommendations Final Report Goal: November 30, 2007

Office Name Goddard Space Flight Center 5 Next Steps Collect questions that need to be answered Collect assumptions Start forming teams/connections for different activities Define reference designs for baseline

Office Name Goddard Space Flight Center 6 Expected Subjects SLE performance impacts Security implications Service management implications Shift of Roles and Responsibilities Implementation costs Operations costs Future upgrade costs Interoperability considerations Demonstrations and tests including data flows with JSC

Office Name Goddard Space Flight Center 7 Discussion Questions Is this an acceptable course of action? What are the schedule drivers?

Office Name Goddard Space Flight Center 8 Reference Diagrams

Office Name Goddard Space Flight Center 9 SCaN-Cx Interfaces Diagram SCaN Cx Vehicles RF Cx Ground Elements Service Management Data Transfer Tracking & Navigation Cx Ground Element Intercommunications

Office Name Goddard Space Flight Center 10 ? ? ? Simplified Option Diagram – Link Layer Interface MS GS AF KSC FDF SN NISN ? SLE

Office Name Goddard Space Flight Center 11 ? ? ? Simplified Option Diagram – Network Layer Interface MS GS AF KSC FDF SN NISN ?

Office Name Goddard Space Flight Center 12 Direct IP IP over SLE Side by Side Comparison (PHY) (IP Forwarder) (PHY) IP (LNK) End User (App.) UDP IP End User Internal Node (LNK) IP UDP (PHY) (App.) (LNK) (PHY) Control Center Internal Node Control Center AOS IP (IP Forwarder) HDLC (AOS Forwarder) (RF) AOS (RF) AOS Earth Ground Station HDLC SLE (LNK) IP TCP SLE IP TCP (PHY) (IP Forwarder) (PHY) IP (LNK) (App.) UDP IP (LNK) IP UDP (PHY) (App.) (LNK) (PHY) (IP Forwarder) IP (LNK) (PHY) (IP Forwarder) (RF) AOS HDLC AOS HDLC IP

Office Name Goddard Space Flight Center 13 Direct IP IP over SLE Cx-SCaN Basic Functional Allocations (PHY) (IP Forwarder) (PHY) IP (LNK) End User (App.) UDP IP End User Internal Node (LNK) IP UDP (PHY) (App.) (LNK) (PHY) Control Center Internal Node Control Center AOS IP (IP Forwarder) HDLC (AOS Forwarder) (RF) AOS (RF) AOS Earth Ground Station HDLC SLE (LNK) IP TCP SLE IP TCP (PHY) (IP Forwarder) (PHY) IP (LNK) (App.) UDP IP (LNK) IP UDP (PHY) (App.) (LNK) (PHY) (IP Forwarder) IP (LNK) (PHY) (IP Forwarder) (RF) AOS HDLC AOS HDLC IP Workstation SLE Gateway Processor RF Router SLE Gateway Router Workstation Router Processor RF Router

Office Name Goddard Space Flight Center 14 Common to Both Options RF Modulation and Coding Link layer framing Service Management interfaces Tracking and navigation Time services Line outage recording