APEX RUN-14 APEX Schedule April 1, 2014 8:00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.

Slides:



Advertisements
Similar presentations
RHIC Status Time Meeting 2/10/2015 Then said to us: "You can no farther go Forward upon this crag, because is lying All shattered, at the bottom, the sixth.
Advertisements

APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
RHIC polarized protons – The next decade – Wolfram Fischer 14 May 2010 RSC Meeting, Iowa State University.
Mar RHIC Planning Meeting Tuesday (Mar. 1) 12pm - Sun (Mar. 6) 8pm: 128 hours Data Taking time: 39.5 hours = ~84% Beam time with collisions (including.
APEX Report: March 31 – April 1, 2009 Fulvia Pilat Time Meeting, April 7, 2009.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
Machine - Experiments January 12, 2005 Machine status.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
APEX Report March 3, 2010 Fulvia Pilat Time Meeting, March 9, 2010.
LBOC11-Oct-2011CERNMassimiliano Ferro-Luzzi 1 LHC Physics Programme  what's left ?
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
Saturday ● 06:00: Physics fill from the night shift ● 15:00: End stable beam mode: – problems with incorporation of settings for the squeeze ● 16:40:
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Vladimir Litvinenko, APEX Workshop 11/02/20006 IBS suppression lattice Mei Bai, Joanne Beebe-Wang, Peter Cameron, Roger Connolly, Angelika Drees, Alexei.
First Demonstration of Optics Measurement and Correction during Acceleration Chuyu Liu Collider Accelerator Department, BNL.
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
RHIC Run14 Time Meeting. Run14 Status – June 24 Run14 He3-Au physics declared on 6/20 with Fill #18460; stochastic cooling is ON for Au beam, longitudinal.
APEX Schedule April :30am12:30pm5pm IBS suppression lattice Litvinenko, Tepikian +team Back 2 Phys 4pm Nonlinear Chromaticity (Response.
Beta* leverage during RHIC AuAu Run14 G. Robert-Demolaize, M. Bai, C. Harper, A. Marusic, X. Shen, S. White Work supported, in parts, by the European Commission.
Six-dimensional weak-strong simulations of head-on compensation in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
APEX RUN-12 APEX Schedule Feb 22, 2012 Injection 8am 11pm IP transfer matrix Tepikian, Ptitsyn If needed: Beam Scrubbing Blaskiewicz, Montag, Huang Injection.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.
Run 10 Start-up Status
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
Linear optics - I Low beta* at injection –Reduction of injection could potentially reduce time to collisions and allow for a more relaxed ramp&squeeze,
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
APEX RUN-11 APEX Schedule May 11, 2011 Injection 12am8am BBA Minty, Jordan, Liu, Rob, Rob, Kevin, … Spin Flipper Bai, Pablo, Oddo, Craig, Kevin IPM calibration.
RHIC Optics Status: Optics Measurements and Corrections M. Bai C-A Dept., BNL On behalf of RHIC Team.
Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin.
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
APEX RUN-11 APEX Schedule Planned Feb. 23, pm ~ 3 ramps 8am 12x12 store Physics store Beta* unsqueeze +s* adjustment GRD+team 6x6 store AC dipole.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Wednesday 8.9 External crossing angles:
Wire, flat beams and beam-beam MDs in 2017
Tuesday TOTEM and transverse loss map (1) OK
Status and Plan for the PEP-II Lattices
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Monday :20 beta beat corrections during squeeze for flat machine finished Afterwards fixing issues at injection: BPM rephrasing for B2 solved.
MD Planning Fri – Sat (1. – 2.7.)
Summary for LPC (March 7th, Ralph Assmann)
Another Immortal Fill….
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture measurement Luo Injection 8:00pm Injection DA measurement with 2.5GeV working point Montague 10:00pm Back2Physics Coupling matrix measurement Tepikian Injection 5:30pm ATS preparation GRD, Simon, Bai, Al Store Injection 12:00pm Injection DX Aperture Scan Luo, Tepikian, Al, Bai 11:00pm

APEX RUN-14 APEX Overview DA with 2.5GeV working point Injection, Montag No data due to main power supply QLI Elens commissioning Gu, Fischer, White Luo, etc Confirmed e beam alignment with Au beam Off-momentum aperture scan Luo, GRD, Liu etc First Telescope Optics Squeeze for RHIC(TOR) test GRD, Luo, White, Shen, Bai Achieved 0.6m beta* at both IPs in Blue with good lifetime and small global beta-beat Beam was re-bucketed and non-cooled DX aperture scan Luo, Marusic, Bai, Tepikian, White First Telescope Optics Squeeze for RHIC(TOR) test GRD, Luo, White, Shen, Bai Achieved 0.5m beta* with good lifetime after chromaticity corrections Back to Physics collision right after midnight IP transfer map: Tepikian V ac dipole setup: Bai

APEX RUN-14 Elens: Gu, Fischer, White, Luo, etc Measured Orbit and Tune Shift

APEX RUN-14 Elens: Gu, Fischer, White, Luo, etc Summary

APEX RUN-14 Momentum Aperture Measurement Al, cait, chuyu, grd, Mei, Michiko, Yun

APEX RUN-14 First Telescope Optics Squeeze for RHIC test GRD, Marusic, Shen, White, Luo, Tepikian, Bai IP6: Beta*x,y=0.57m,0.57m IP8: Beta*x,y=0.62m,0.61m IP6: Beta*x,y=0.55m,0.43m IP8: Beta*x,y=0.54m,0.53m Au14-ats::beta60 Au14-ats::beta50 DX aperture Scan at Injection

APEX RUN-14 First Telescope Optics Squeeze for RHIC test GRD, Marusic, Shen, White, Luo, Tepikian, Bai Au14-ats::beta60

APEX RUN-14 First Telescope Optics Squeeze for RHIC test GRD, Marusic, Shen, White, Luo, Tepikian, Bai

APEX RUN-14 First Telescope Optics Squeeze for RHIC test GRD, Marusic, Shen, White, Luo, Tepikian, Bai Poor data quality due to lower bunch intensity Au14-ats::beta50

APEX RUN-14 DX Aperture Scan Marusic, Luo, Tepikian, Bai Summary & Plan 1. Full sets of data taken at injection Measurement done at injection after a dipole QLI 2. Detailed data analysis is under way likely beam began to loss at 1.6mrad ( half of maximum ) 3. May repeat this experiment once → one confirmation at injection → one confirmation at store