Safe roads, Reliable journeys, Informed travellers Peter Godfrey Network Strategy Manager NS North M606 – M62 HOV GATE
Pilot Study Area M606 – M62 HOV GATE
Initial HOV Scheme M606 – M62 HOV GATE
Final HOV Scheme (1) M606 – M62 HOV GATE
Final HOV Gate Scheme (2) M606 – M62 HOV GATE
Scheme Benefits The M606 – M62 HOV gate scheme is expected to deliver benefits, these include: Drivers in car share vehicles will be able to gain priority access, bypassing congestion. Car share vehicles would save on average 8 minutes during the peak periods on this section of road. Environmental benefits as drivers share their cars with others. M606 – M62 HOV GATE
Scheme Visualisation Visually demonstrates the operation of M62 J26 with and without the proposed HOV gate during peak periods. M606 – M62 HOV GATE