Possible solutions for the future CHOD Mauro Raggi LNF MUV and CHOD CERN 13/07/2011 1.

Slides:



Advertisements
Similar presentations
LAV front-end board test
Advertisements

LAV front-end board test Francesco Gonnella, Mauro Raggi Photo Veto Working Group 1 April Francesco Gonnella - Laboratori Nazionali di Frascati.
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
LAV trigger primitives Francesco Gonnella Photon-Veto Working Group CERN – 09/12/2014.
Status of the LAV electronics G. Corradi, C. Paglia, D. Tagnani F. Gonnella, M. Raggi INFN LNF F. Gonnella, M. Raggi INFN LNF Photon Veto WG CERN 13/12/2011.
LAV contribution to the NA62 trigger Mauro Raggi, LNF ONLINE WG CERN 9/2/2011.
Construction and First Results of a Cosmic Ray Telescope M. P. Belhorn University of Cincinnati 12 June 2008.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Apr, 16, 2008.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Inter TEL62 communication M. Raggi, M. Piccini, F. Gonnella 16 th October 2013 TDAQ Working Group Meeting.
Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Spasimir Balev /CERN/ mrad 3 LKr simulation: – very slow, so only events with interesting topology are fully simulated: –  + with.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
NA62 Trigger Algorithm Trigger and DAQ meeting, 8th September 2011 Cristiano Santoni Mauro Piccini (INFN – Sezione di Perugia) NA62 collaboration meeting,
1 New TOT design for the LAV F.E. electronics M. Raggi, P. Valente G. Corradi, D. Tagnani LNF electronic service TDAQ Working Group 29/05/2009.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
Test beam preliminary results D. Di Filippo, P. Massarotti, T. Spadaro.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Update on CHANTI F.Ambrosino, M.B. Brunetti*, F. Canfora*, T. Capussela**, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
LAV status report for the NA62 LAV working group Preliminary test beam results Future activities Progress on simulation A. Antonelli INFN-LNF SPSC meeting.
Proposal of a digital-analog RPC front-end for synchronous density particle measure for DHCAL application R.Cardarelli and R.Santonico INFN and University.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
LAV L0 trigger primitives Mauro Raggi, Francesco Gonnella TDAQ Working Group.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
Update on works with SiPMs at Pisa Matteo Morrocchi.
Prototypes photon veto detectors for NA62 experiment CERN M. Raggi - INFN/Frascati for the NA62 Photon Veto Working Group LNF, RM1, NA, PI, SOFIA First.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
V.Duk, INFN Perugia1 CHOD TDAQ status and rates Viacheslav Duk, INFN Perugia On behalf of the CHOD working group.
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Beam detectors in Au+Au run and future developments - Results of Aug 2012 Au+Au test – radiation damage - scCVD diamond detector with strip metalization.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
Gianluca Lamanna TDAQ WG meeting. CHOD crossing point two slabs The CHOD offline time resolution can be obtained online exploiting hit position.
IFR Detector R&D status
Prospect of SiPM application to TOF in PANDA
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Beam detectors performance during the Au+Au runs in HADES
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
Ultra fast SF57 based SAC M. Raggi Sapienza Università di Roma
G.Lamanna (CERN) NA62 Collaboration Meeting TDAQ-WG
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
DCH FEE 28 chs DCH prototype FEE &
PADME L0 Trigger Processor
Claudio Cerri, Riccardo Fantechi, Luigi Di Lella
Results from a preliminary analysis of the MWPC test at the GIF
Front-end electronic system for large area photomultipliers readout
PID electronics for FDIRC (Focusing Detector of Internally Reflected Cherenkov light) and FTOF (Forward Time of Flight) Christophe Beigbeder and Dominique.
Времяпролетный детектор PANDA
Presentation transcript:

Possible solutions for the future CHOD Mauro Raggi LNF MUV and CHOD CERN 13/07/2011 1

The old CHOD in 2012 The typical PM signal from a hodoscope counter was 300mV high and 30 ns long. Dynamic range up to 1V (3MIP) A time resolution better than 200 ps per counter was measured from the data during NA48 data taking. 2 planes x 64 counters per plane 128 ch total 2 A cost effective and temporary solution for the readout in 2012 is treated in: A LAV FEE based readout for the the synchronization run TDAQ 02/2011

My view of the future CHOD My personal constraints –Increase the number of slab (is a factor 2 enough?) –Reuse the present scintillator material –Possibly reduce CHOD thickness (is 2 cm enough?) –Use a low cost photodetector (Sipm) –Use the LAV FEE+TELL62 readout –Keep the total number of ch<512 using 2thr Basic design choice –Maintain 2 planes of scintillators H and V –Maintain the slab structure –Introduce a longitudinal WLS readout 3

Single slab design 2x1 cm 4 2 cm Appropriate length up to 1 meter Strips of 2x1cm with 2 or 4 x1mm round WLS fibers for all the length read out by 1x4mm 2 SipM on one side. The strip should be painted on all sides and glued together to form super strips according to the scaling rate on the CHOD. 1 cm Hamatsu MPPC (SipM) 1x4mm 2 cm 1 cm Inner radius slab Outer radius Middle radius slab

Detector Layout 5 H Plane 32x2 cm wide strips 64 mm^2 of Sipm 16x4 cm wide strips 64 mm^2 of Sipm 16x6 cm wide strips 96 mm^2 of Sipm 128 slabs per CHOD plane Total 256 slabs with 960 fibers 1.5m long 256 read out channels for the whole CHOD ~ 1.5 Km of WLS fibers 960 mm^2 of SiPM (Hamamatsu or IRST) 2.4m Each of the 256 slab are optically isolated every 2cm Reduce the rate per strip by factor ~3 in the inner part due to smaller size of the strip Increase the precision of the track positioning to order ~ 1 cm 2 in inner part The size of the readout strip can be easily increased without any intervention on the detector (just read out each 2x2cm cell can reach up to 480 readout channels ) SiPM improve light collection by a factor ~3 wrt PMT

Understanding the rate 6 According to this picture by Spasimir the rate on the inner slabs should not exceed 400KHz which is safe for both SiPm and TDC

Fibers radiation hardness Modern fibers seem to be able to stand dose up to 1Mrad Even if damaged they recover up 90% of the original LY in few minutes of no beam Dose definitions: –100rad= 6.24x10 12 MeV/Kg which means 6.24x10 9 MeV/g –1Mrad = 6.24x10 13 MeV/g Max number of particle per 1 cm of slab per year –1MHzx3600s x 24h x 180days =1.5x10 13 /6.5=2.2x10 12 cm Energy per particle per fiber: –1 MeV per cm means 0.1MeV per particle –1 fiber per cm means geometrical factor of 1/10 We will have maximum 1.6x10 10 MeV/g means ~2Krad We will have more than 2 order of magnitude safety factor 7

Cost of the detector material Fibers cost –Double cladding 4€ meter means 1.5Km ~ 6K€ –Single cladding 2€ meter means 1.5Km ~ 6K€ Photodetector cost –Sipm 15€ per mm 2 1K sipm ~ 15K€ Low voltage sipm cost to be estimated 8 Numbers coming from recent order of similar size by KLOE thanks to M. Martini

Why the LAV FEE for the CHOD CHOD dynamic range (50mV, 1V) –The CHOD dynamic range much smaller to the LAV one FEE board time resolution –Few hundred of ps time resolution is more than enough with WLS fiber readout CHOD charge measurement –A precise charge measurement is not needed for the chod –The LAV FEE can give better than ~10% resolution on charge Maximum tolerable rate –The tolerable rate for single ch of LAV readout chain can reach 500KHz limited by HPTDC performance 9

LAV FEE working principle Details in G. Corradi, TDAQ WG dec 2010 Produce a LVDS signal of wdt equivalent to the time the signal is over threshold Clamp the signal Amplify 3 & split Compare with thr and produce an LVDS 10

Online Time slewing correction Exploiting the presence of a double threshold on the LAV FEE board an online slewing correction is possible for the CHOD: Define T L = leading edge time (ns) for the Lower threshold T H = leading edge time (ns) for the Higher threshold T 0 = Time of the event (ns) extrapolated to 0 mV (slewing corrected) L THR = Lower threshold value in mV H THR = Higher threshold value in mV 11 L Thr H Thr THTH TLTL T0T0

Test beam 2010: LAV time resolution 4 mV threshold Offline slewing correction applied using V(t) ~ t a e -tb Only TDC used in the correction More than enough for a WLS based CHOD with 1ns time resolution! 210 ps /√[E 10 E 26 /(E 10 +E 26 )] (GeV) D. Di Filippo, P. Massarotti, T. Spadaro LAV WG dec

LAV FEE charge performance Q (pC ) ToT (ns) The charge resolution is very good in a limited range that matches very well CHOD requirement (1-3 MIP range) D. Di Filippo, P. Massarotti, T. Spadaro LAV WG dec

New CHOD readout chain Need 8 LAV FEE board (32ch in each) 1 TEL62 or even TELL1 4 TDC boards (SCSII connection) 1 LAV Wiener crate (9U J1 only) Each TDC will house half CHOD plane The TEL62 will house the whole CHOD 4xFEE board 1xTEL62 14

new CHOD readout cost estimate 15 Type of equipmentNCost/1pcs LAV FEE board (32ch in each)83 K€ TDC boards41 K€ LAV Wiener crate 9U17 K€ TEL62 or even TELL114 K€ Total~ 40 K€ Plus some cables and infrastructure

Conclusions A strip based CHOD design is sketched –The SIPM readout is cheap and very flexible –The cost of new material is order 20~30K€ –No estimate for sipm low voltage yet A LAV FEE + TEL62 based readout seems feasible –The cost estimate for 256ch is 40-50K€ The TEL62 based readout provide an easy way of reproducing pre-trigger algorithms 16

Backup slides 17

Connections issue The input of the LAV FEE board is made by DB37 connectors The output of the CHOD is made by LEMO-00 cable 2 possible solution: –Build a patch panel with lemo IN connectors in and DB37 out –Build custom patch cables like the one below –Use the same LAV connector 18

FEE LAV VME9U Vth_H and Vth_L test points and adjust trimmers CAN in, CAN out USB Remote Control Local Control Sum 1 to 16 Sums 1 to 4, 5 to 8, 9 to 12, 13 to 16 Sum 1 to 16 Sums 1 to 4, 5 to 8, 9 to 12, 13 to 16 Sum 17 to 32 Sums 17 to 20, 21 to 24, 25 to 28, 29 to 32 InputsTypeOutputsType Power connectionVME J1 32 analog signals from LAV2xDB3764 LVDS output to TDC2xSCSI2 8 analog sums of 4 blocks8xLEMO-00 2 analog sums of 16 blocks2xLEMO-00 1 CAN OPEN IN connectionRJ111 CAN open OUT connectionRJ11 19

The FEE analog sums on CHOD One FEE boards serves 32 channels = 1/2 plane 32 analog outputs cannot all be housed on the board: (there isn’t enough space on the front panel) sum 4 slabs analog signals sum 16 slabs (16 slabs= V2 quadrant amazing!) Output via Coax 50 , Lemo-00 20

L0 trigger with the CHOD The presence of all CHOD ch in a single TEL62 allows the Q1 logic to be implemented the FPGAs –Each PP FPGA counts the number of hits in a plane (64 ch) –The SL FPGA makes the coincidence horizontal & vertical The use of the analog sum, a discriminator and a logic unit allow to produce a NIM simplified version of the Q1 that can be used in scaler H1 H2 H3 H4 V1 V2 V3 V4 H1&V1 H2&V2 H3&V3 Sum H1 Sum H2 Sum H3 Sum H4 Sum V1 Sum V2 Sum V3 Sum V4 H4&V4 OR NIM Q1 discr Scalers? 21

Sum16 based simplified Q1 Using an additional FEE board and TDC we can: –Insert the 8 sum16 (a quadrant) as 8 additional channels in the read out (see fig below). –The Q1 logic in the PP-FPGA is now easy: CH0&CH4 or CH1&CH5 or CH2&CH6 or CH3&CH7 Where CH(i)&CH(j) means |T(ch0)-T(ch4)|<10 ns Use the higher thr in veto to establish if there is more than 1 track in the sum 22 V1 CH0 V2 CH1 V3 CH2 V4 CH3 H1 CH4 H2 CH5 H3 CH7 H4 CH6

Sum4 based sub-quadrant Q1 Using an additional FEE board and TDC we can: –Insert the sum4 as 32 additional channels in the read out –The Q1 logic in the PP-FPGA is now improved: Can give precise localization of track Can reduce 2 tracks contamination in Q1 23 H PlaneV Plane

Prototype strips 20mm x 500mm x 5 mm 4 1x1 mm groves for the fibers 24