 Minutes approval, follow-up from last meeting (O. Brunner) 10'  Report from coordinator (J.M. Jimenez) 10'  Progress reports from all task leaders.

Slides:



Advertisements
Similar presentations
SLHC-PP Status of Finances D.Abbaneo, M.Capeans M.Maitrel, C.Montagnier October 2010.
Advertisements

Call Identifier: FP7-ICT Proposal number: ETICS EuresTools support tools & management support services Klaas-Pieter Vlieg Eurescom
LIU-SPS Beam Loss, Protection, Transfer Lines WG
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Vacuum, Surfaces & Coatings Group Technology Department 04/12/2014 R. Salemme – COLDEX results during SPS Scrubbing Run I Electron Cloud Meeting #18,
Report from WG 3: Cryomodules (design & integration, construction, assembly) V.Parma, CERN, TE-MSC With contributions from O.Capatina, CERN, EN-MME 2nd.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Dr. José Miguel JIMENEZ (Coordinator) CERN, Technology Department Dr. Olivier BRUNNER (Deputy Coordinator) CERN, Beams Department 1 FCC Week
H. MAINAUD DURAND PACMAN WP0 OUTLINE Project management structure Project monitoring PACMAN key milestones & deliverables Schedule Funding consideration.
Ministerio de Relaciones Exteriores República de Colombia.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Communication.
Injector De-cabling Project Project Team Meeting #
HIPPI 05, Abingdon, Introduction to HIPPI05 -Few words on the life of HIPPI -A new HIPPI Management… -HIPPI 05 organization -Mandate for the.
1 st R2E RADIATION SCHOOL & WORKSHOP Some Organisational Issues.
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
Administrative Support Receipts Attendance certificates Any other information Ayse Annelie.
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP1 Management 10-11/07/2012COGEN Europe.
Injector De-cabling Project Enlarged meeting # E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
TALENT Supervisory Board Meeting TALENT Kick-off meeting CERN H. Pernegger Training for cAreer deveLopment in high-radiation ENvironment Technologies.
330 registered participants Closing remarks. 2 Future Circular Collider Study FCC Kick-Off 2014 Discussion of all FCC aspects Refine scope of the study.
WP3: Beam Transfer Challenges M.Atanasov, M.Barnes, T.Kramer, B.Goddard, P.van Trappen Special technologies.
BOOSTER ORPHAN CABLES Georgi Minchev Georgiev EN-EL-CF 08/10/2015 General De-cabling Project Meeting #4.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
30 April 2014FCC-ee Physics Coordination meeting1 WELCOME to the 1st coordination meeting «Experiments at the FCC-ee» Within the FCC-ee DESIGN STUDY.
Accelerator and Technology sector organization from January, 1st, 2014 Frédérick Bordry 18 th November 2013.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
Project monitoring Official visit of the Grant Agency on Strengths of the project: professional results, progress compliance with work plan.
Booster identification/disconnections Follow-up Enlarged project meeting, E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
30 April 2014FCC-ee Physics Coordination meeting1 FCC-- ee coordination meeting 12 Nov 2015 Brief news.
WPs assigned to the Accelerator Sector Groups for the neutrino platform TE-VSC involvement in: Tetra-Phenyl-Butadiene (TPB) coating of photomultipliers.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
BIDDERS’ CONFERENCE IT-3972 Provision of Maintenance Services on the Industrial Trucks at CERN April 24th 2014 Handling Engineering Group2 Introduction.
Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
European Organization for Nuclear Research Industrial Controls Engineering Department GUAPI working group meeting May the 6th 2015.
FCC related MDs. Faster LHC ramp MD Brennan Goddard; Matteo Solfaroli Camillocci; Wolfgang Bartmann; Florian Burkart; Francesco Maria Velotti; Mike Lamont;
Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 BE, TE, EN Departments Summarized by José Miguel JIMENEZ 1 BE-RF (E. Jensen*,
BA6 newsRF power Cable list being worked out. BA6 newsLLRF Cable list done, pending check and confirmation.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
TOK Meeting III Domenico Cotroneo University of Naples Federico II Coimbra, 30th September 2011.
Consortium Agreement Kari-Jouko Räihä. Characteristics  Origin Basis: UNECA (Unified Network of Excellence Consortium Agreement) Terminology adapted.
1 st impedance working group meeting Christine Vollinger, Benoit Salvant Mandate Draft proposal for: Structure Procedures List of members Opening discussion.
UNISEC Universal Influenza Vaccines Secured
AFC 2017 (and 2018) AFC timeline:
Presenter name affiliation
Status HIE ISOLDE installation and shutdown work
Francis Perez (ALBA) and Paolo Chiggiato (CERN)
Naming convention Rules
C.Carli Budget and Planning ELENA Project Review, 15th October 2013
Annual Report Instructions
Machine Availability and Reliability Panel (MARP)
European Detector R&D: AIDA
Update on the Ethernet Network Installation Campaign
FCC hh dump kicker - switch topologies and impact on beam
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
HIE-ISOLDE Project: Planning & Resources
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
<Preliminary proposal name>
Update on beam screen issues
X-Rays made by P. Lepeule (TE/VSC) and J-M Dalin (EN/MME)
HiRadMat Test Facility
<Preliminary proposal name>
Report on HIE-ISOLDE Status
P.Fabbricatore (WP5 Coordinator)
CERN’s MidTermPlan and the consequences for HIE-ISOLDE
Presentation transcript:

 Minutes approval, follow-up from last meeting (O. Brunner) 10'  Report from coordinator (J.M. Jimenez) 10'  Progress reports from all task leaders 30'  Report from fellow activities  Specific reports  FCC_ee Warm Magnets (15') Speaker: Attilio Milanese (CERN)  FCC_ee vacuum System (15') Speaker: Paolo Chiggiato (CERN)  Tour de table 15'  AOB 5' Next meetings: December 2

 WP 4: Additive manufacturing:  New task lead by TE-VSC will be detailed -> action Miguel

Everyone is encouraged to motivate partners to participate and contribute to the programme (at their own cost, there will be no financial contribution from the FCC project.) Global invitation ?? e.g based on last year participants list?

 WP 1  List to be defined – dedicated session for Eurocirlce??  WP 2  Laurent Tavian  Hugo Rodriguez, TE-CRG (talk?)  WP 3  Brennan Goddard, TE-ABT  Thomas Kramer, TE-ABT  Linda Stoel, TE-ABT  Wolfgang Bartman, TE-ABT  Pieter van Trappen, TE-ABT (proposed by Brennan)  M. Atanasov, TE-ABT (proposed by Brennan)  J.Rodziewicz,, TE-ABT (VIA) (proposed by Brennan)  WP 4  Francesco Bertinelli, EN-MME  ?  TE-VSC: action Miguel (task description & participants)  WP 5  Davide Tommasini, TE-MSC  Atilio Milanese, TE-MSC

 WP 6  Wolfgang Hofle BE-RF  Gerd Kotzian BE-RF  Daniel Valuch BE-RF(talk?)  WP 7  Roberto Losito  Anton Lechner, EN-STI  Antonio Perillo Marcone  Mario Di CastroIlaria Besana participates in WP 7.1 but large part of her work is related to accelerators studies.  WP 8  Rhodri Jones, BE-BI  Jean Jacques Gras, BE-BI  WP9&10  Paolo Chiggiato, TE/VSC  Roberto Kersevan, TE/VSC  Sergio Calatroni, TE/VSC  Vincent Baglin, TE/VSC  Ida Aichinger, TE/VSC (Doct)

 WP 11  Mar Capean Garrido, PH- ESE  F.Faccio, PH-ESE (talk?)  R.Garcia Alia, EN-STI (talk?)  Markus Brugger EN-STI ?  WP 12  Andrzej Siemko, TE/MPE  Rudiger Schmidt, TE, MPE  Marco Prioli, TE/MPE (fell)