IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.

Slides:



Advertisements
Similar presentations
Compton gamma stability - Status of the drift source investigation - Nobuhiro Terunuma, KEK March 17 th, 2014, LAPP, FJPPL-FKPPL ATF2 Workshop 1.
Advertisements

ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Status of ATF/ATF2 and machine schedule in this fall Impact of the earthquake Recovery status, alignment Schedule in this fall N. Terunuma, KEK.
ATF Cooling Water System Toshiyuki OKUGI, KEK 2015/ 2/ 24 ATF2 Project Meeting LAPP (Annecy, France)
IPBPM piezo-mover system and plans for in situ monitoring of calibration and stability Current status and plan for ATF2 Philip Bambade Laboratoire de l’Accélérateur.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
IPBSM status and plan ATF project meeting M.Oroku.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
IPBSM - Stability of the laser system - Nobuhiro Terunuma Feb. 12 th 2014, KEK, 17 th ATF2 project meeting.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
ATF2 Tuning Updates Glen White, SLAC Sept
FFS Issues in the 2011 autumn continuous operation Toshiyuki OKUGI (KEK) 1/13/2011 The 11 th ATF2 project meeting SLAC, USA.
New IP chamber for ATF2 goal 2 Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4.
June 30, th ATF2 Project Meeting Andrei Seryi for the ATF2 team May 2010 Continuous Run Operation.
Continuous Run in May K.Kubo. Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 Optics for the Commissioning Toshiyuki Okugi, KEK 2008 / 10/ 22 ATF2 commissioning meeting.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
1/10 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 10, 2006) Phase.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
July 2, th ATF2 Project Meeting Philip Bambade, Andrei Seryi, Toshiaki Tauchi Summary for TB.
Commissioning Hardware and IP Configuration of ATF / 12 / 19 ATF2 project meeting at KEK Toshiyuki Okugi (KEK)
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
ATF2 Report ALCW Kiyoshi KUBO, for ATF2 Collaboration.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
IPBSM Operation 11th ATF2 Project Meeting Jan. 14, 2011 SLAC National Accelerator Laboratory Menlo Park, California Y. Yamaguchi, M.Oroku, Jacqueline Yan.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
IP diagnostics Toshiyuki Okugi 2008 / 6 /19 ATF2 Software mini-workshop LAL, Orsay.
Simulation of the α, dispersion, coupling and β multiknobs in large β optics Sha Bai, Philip Bambade, Benoit Bolzon, Javier Resta Lopez
ATF2 Lattice v4.5 Matching and Tuning Performance with Lucretia Glen White, SLAC LCWS2011 Granada, Spain.
Taikan SUEHARA, Joint Meeting of PRPPC in Honolulu, Hawaii, 2006/10/30 Laser Fringe Stabilization of 35nm IP Beam Size Monitor (Shintake monitor) for ATF2/ILC.
Progress of Shintake Monitor (ATF2 IP-BSM) ATF2 weekly meeting 2008/9/3 Takashi Yamanaka The University of Tokyo.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
IP Tuning Task Updates Glen White, SLAC January
From Beam Dynamics K. Kubo
ATF2 Status N.Terunuma, KEK
Expected hardware status and Priority of the commissioning task
Intensity dependence of Beam size at IP and Wakefield in ATF2
Emittance Diagnostics
Philip Bambade, Andrei Seryi, Toshiaki Tauchi
13th ATF2 Project Meeting Summary
Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
ATF2 IP Tuning Task Simulation Updates
Beam-based alignment measurements
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Presentation transcript:

IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting

Final Doublet Issues QD1FF seems to be rotated by 6.6mrad. ( see the presentation of Sugahara-san and me in 6/30 ) Will we rotate the QF1FF by 6.6mrad ? Will we check the multipole field of FD magnets? Will we replace the QF1FF and QD0FF ? We will have a special meeting to discuss the FD magnet issues.

Upgrade of the IP beam size measurement for initial IP beam size tuning In the ATF2 continuous operation of 2010 spring run, we cut several tungstain wire at IP. Therefore, we will install the carbon wire scanners at IP. The first meeting of the IP carbon wire issue was done at 6/10/ The new carbon wire fork will be prepared by SLAC. - The fork will be made with ceramic to relax the themal stress to the wire.

Upgrade of the beam size measurement In the ATF2 continuous operation of 2010 spring run, the IP-BSM condition was changed while the beam size tuning, and the IP-BSM had to be tuned sometimes. Especially, the IP-BSM condition ( laser path and optimum reducer setting ) was drifted in 5/21(Fri) for high outside temperature. Therefore, we had better to make more reliable beam size measurement system from 2010 autumn run. 1. The position drift When the laser position with respect to beam is shifted by 10-20um, the gamma-ray signal is reduced to be half and make the modulation depth worse. Electron beam - The IP-BPM helps to check the horizontal orbit drift. ( We will have a special meeting to discuss whether will we install the IP-BPM or not). - We will apply the beam orbit feedback, if need. Laser beam - IP laser position monitoring will be started with PSDs. - We will apply the laser position feed back, if need.

2. Jitter of laser trigger timing. When the trigger timing is jumped by 1count (2.8ns), the gamma-ray signal was reduced to be 70% of the peak signal. GUN stationDRstationKicker stationIP-BSM station TDC Several TDCs will be installed and be monitored in the beam size measurement in order to identify the module with the timing jump.

Monitoring of the beam position jitter with respect to the IP-BSM laser fringe Electron beam - The IP-BPM (KEK IP-BPM) helps to monitor the vertical beam position jitter (We will have a special meeting to discuss whether will we install the IP-BPM or not ). - The IP-BPMs are located 5cm and 10cm from IP. - The required performance of the IP-BPMs are 30nm of the position resolution with 30um of the dynamic range. 30nm is comparable to the IP beam size for nominal optics. 30um is comparable to the beam size at IP-BPM (10cm from IP) for nominal optics. - However, since it is difficult to make fine alignment of the IP-BPM, we will fix the IP transverse position (beam and laser) to the center of the IP-BPM. Laser phase jitter of IP-BSM - The IP-BSM group plan to prepare the phase monitor in 2010 summer shut down.

Summary of IP instrumentation configuration for Autumn 2010 ATF2 runs We will have two special meeting - to discuss the FD magnet issues. - to discuss the IP-BPM issues. - whether will we install the IP-BPM or not ? - what kind of readout electronics will we use ? - who will do the commissioning of the IP-BPM ? We will install the IP-carbon wire scanner. We will have upgrade plans of the beam size measurement. - We will monitor the IP laser position with PSDs in order to monitor the laser position with respect to beam. - We will monitor the horizontal beam position with IP-BSM, if agreed in the meeting. - We will put several TDCs in each timing station in order to identify the module with the timing jump. We will monitor the beam position jitter with respect to the IP-BSM laser fringe. - The IP-BSM group plan to prepare the phase monitor. - We will monitor the vertical beam position jitter with IP-BSM, if agreed in the meeting.

Backup Slides

The sensitivity of the multipole fields The amount of the multi-pole fields to increase the vertical beam size to 300nm for the beam with 1nm horizontal emittance and 10pm vertical emittance QF1FF is the most sensitive for all of the multi-pole fields. QD0FF is comparable to the other FF quads.

The beam size stay same vale Minimum beam size was 70nm at 0.3mm  y Beam size is increasing for small  x. When we assume the skew sextupole field of QF1FF is K2S=0.68 ( the amount to increase the vertical beam size to 300nm ). This value is huge ( 30 times larger than the multipole field measured in SLAC ), but it seems that QF1FF has a huge mechanical roll (5-6mrad). It is better to check the multipole field of FD magnets again. But, it is difficult to measure in KEK for no appropriate coils. Will we replace the FD magnets in this summer shutdown ?