JCM TRAINING OVERVIEW DBV-135 Phone # (800) 683-7248 (702) 651 0000 Technical Support # (800) 651-3444 Fax # (702) 651-0214

Slides:



Advertisements
Similar presentations
WHIRLPOOL Vertical modular Washer
Advertisements

Smart Personal Console (SPC). Smart Personal Console Overview SPC allows users more control over their personal communications settings. Users can view/set:
First Paper Feed Area Table Height Adjustment: There are two ways of adjusting the upper limit sensor. 1. You can put two sheets of paper on the paper.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
inFire HTC speed Furnace Webinar
All rights reserved. Copyright © 2008 Argox Information Co., Ltd ISO 9001:2000 F1 Commercial & Light Industry Printer.
Engineer Training Media Feeder TJ8300 / TJ8500 Media Feeder.
PLANNING FACE GRAIN JOINTING EDGES STRAIGHT AND SMOOTH CUTTING RABBIT JOINTS CUTTING CHAMPFERS AND BEVELS.
InnoSys Process Sequence. End Effector Components End Effector Prox Switch Load Cell Wire Conduit Crows Foot Nut Runner.
University of Maryland Center for Environmental Science Chesapeake Biological Laboratory IP Phone Training.
In this presentation you will:
The Handling Camera1 Trainer Training The Handling Camera.
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
KX-NS1000 Initial Set Up For step by step : 16 May,
Hydraulic Anti-Lock Braking System For Trucks, Buses and Motor Homes.
Available at: – Program Optical Quad Encoders in Autonomous Mode Program optical quad encoders in autonomous mode.
Digital Tachometer ENGR 4803 Electromechanical Systems & Mechatronics.
Control Panel Overview Key pad: A Qwerty Keypad, used to enter an address. Programmable Features: The programmable features allow you to program.
The Alix.1c microcontroller on board the vehicle runs Fluxbuntu Linux and is connected to a g wireless card and a USB web camera. A background process.
ECE 265 – LECTURE 13 Interface to switches and LEDs 7/3/ ECE265.
SENIOR DESIGN 10/16.
ELECTRONIC THROTTLE CONTROL SYSTEM
AccuMax Multi-Point Injection Mechanics
After Receiving this error code, Follow these steps to correct the problem… Click for next slide.
Nuclear Plant Control System We wanted to design a circuit board with the necessary tools in order to help the operation of a nuclear power plant using.
AuctionStar Training Event Check In General Auction Information Big Board & Silent Auctions Auction Closings & Check Out.
Image of Arduino. Arduino discussion Address issues with circuit walk-through – Electricity, Programming, Arduino Concepts Work on BeatTable (next week)
Paver System Five Control Box Overview Aug 2009 Control Box Overview Paver System Five.
Programmable Systems  Electronic devices have been developed to make life more enjoyable, easier, safer or more productive.  Some examples: Microwave.
Programming Concepts Part B Ping Hsu. Functions A function is a way to organize the program so that: – frequently used sets of instructions or – a set.
Mercury G3 Service Tool Training Overview
January 2011City of Boise 1 City of Boise Time Clock Training Timecard Entry (CyberShift) Clocks.
GCS 300 System Operation Application – Level 1.
Drills and Drill Press Safety in the Lab
Problem 1 Choose title 1 st XML 2 nd electronic spider 3 rd infrared remote home control Waste time.
How to use Touch Screen SeneS Technology. Co, Ltd.
An Objective and Component View (Not included Drive: Balance and Turret: Axis Camera)
Front-end Product Training Program –Speed Dome. Table of Contents  Speed dome classification  Speed dome basic information  FAQ  Upgrade.
The George Washington University Department of ECE ECE 1010 Intro: Electrical & Computer Engineering –Introducing KIPR Link/Interface and Set-up –Continuation.
Engineering 1040: Mechanisms & Electric Circuits Winter 2015 Interfacing Light-Emitting Diodes (LEDs) & Push Buttons to Microcontrollers.
Technical Writing for Robotic Coding!.  du/products/teaching_robotc_cort ex/fundamentals/introtoprogramm ing/thinking/videos/fundamentals.
I. The whole machine problems. 1. Machine does not work properly Possible causes : 1 ) How to test the voltage: transfer the millimeter to voltage range(20V),
ENGR 101: Robotics Lecture 3 – Robot Motion Outline  Robot Motion  FOR Loops  Making Music References 
Engineering H193 - Team Project Gateway Engineering Education Coalition Lab 1P. 1Spring Quarter Introduction to Sensors Lab 1.
JCM TRAINING OVERVIEW DBV-145 Phone # (800) (702) Technical Support # (800) Fax # (702)
JCM TRAINING OVERVIEW DBV-200 Phone # (800) (702) Technical Support # (702) Fax # (702)
JCM TRAINING OVERVIEW WBA-XX
Creating and Editing a Web Page Using Inline Styles
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
AAPT workshop W03 July 26, 2014 Saint Cloud State University, MN, USA
Casne.ncl.ac.uk Taking care of the CrumbleBot Please do NOT stress the robot's motors 1.Do NOT push the robot 2.Do NOT hold the.
Simple Water Level Controller Circuit with Microcontroller and Alarm.
ISA CLICK CONTROL #38 – FALL 2014 ERIC BRUNNGRABER DRAKE ISABIRYE.
PLC programming Part 3: Problems with solutions. Topics  Every problem is devided into three parts:  Technology description contains the general properties.
All Freezer Advance. When the Freezer is first supplied with power or if a power outage occurs, the display will indicate this by flashing the temperature.
Input & Output devices. Input Device :keyboard a keyboard is an input device, partially modeled after the typewriter keyboard, which uses an arrangement.
Building controller with joystick and buttons. put joystick together (keep things in order below)
PostBase Automatic Feeder Component Removal Service Training
What is direct current (DC)?
TESTBED ACADEMY Final Exam.
Programming Concepts (Part B) ENGR 10 Introduction to Engineering
McCrometer Nano Board Test Procedure
1. Calibrate all sensors in the machine.
Copier Jam Detector Design Problem
Introduction to Wiring Logic Gates
Smart Personal Console (SPC)
Universal Interrupted Electronic Oil Primary R7184U Training Module
Programming Concepts (Part B) ENGR 10 Introduction to Engineering
Presentation transcript:

JCM TRAINING OVERVIEW DBV-135 Phone # (800) (702) Technical Support # (800) Fax # (702) Web Address

Connect validator head to VM-401 and Check Pin Board Insure all dip-switches on validator head and VM-401 are set to the ON position. Preparing for Calibration

Calibration utilizing VM-401 & Oscilloscope Sensor location Variable resistors

Adjustment Procedures for variable resistors utilizing oscilloscope Utilizing the chart below, connect oscilloscope to the appropriate pin and adjust the variable resistor to the proper voltage. Insure the adjustment is made where the voltage varies at a smooth rate. When adjusting MAG sensor move MG-03 card for maximum reading then adjust resistor

FUNCTIONAL TESTING No.S-RESREJACKCONTENTS 1Test for head forward motor rotation test. 2Test for head reverse motor rotation test 3Validator sensor test 4Stacker performance test 5 Unit complete cycle test 6Solenoid lever and sensor test 7Stacker sensor test 8Bill acceptance test Quick reference for VM-401 tester

TEST # 1 no 01 BSY VEND1 VEND2 VEND3 ABN STKF Be sure that “no 01” is in display and set the E/D switch to enable then follow legend on left.By setting E/D to disable allows tester to be given another test command. E/D no 01 BSY VEND1 VEND2 VEND3 ABN STKF E/D no 01 BSY VEND1 VEND2 VEND3 ABN STKF E/D Carrier speed is fast Carrier speed is appropriate Carrier speed is slow N/G OK S-RESET REJ ACK TEST # 2 Press down the REJ button Be sure that “no 02” is in display and set the E/D switch to enable then follow legend on left. NOTE by setting E/D to disable allows tester to be given another test command.

TEST # 3 Head Sensor Test Press down the ACK button Be sure that “no 03” is in display and set the E/D switch to enable then follow legend below. NOTE by setting E/D to disable allows tester to be given another test command. VEND 1 = WILL LIGHT WHEN PT1 SENSOR PATH IS BROKEN VEND 2 = WILL LIGHT WHEN PT2 SENSOR PATH IS BROKEN VEND 3 = WILL LIGHT WHEN LEVER SENSOR IS MOVED STKF = WILL LIGHT WHEN PT3 SENSOR PATH IS BROKEN E/D no 03 BSY VEND1 VEND2 VEND3 ABN STKF E/D S-RESET REJ ACK

TEST # 4 Stacker Performance Test Press down the REJ and ACK button be sure that “no 04” is in display and set the E/D switch to enable then follow legend. NOTE by setting E/D to disable allows tester to be given another test command. E/D no 04 BSY VEND1 VEND2 VEND3 ABN STKF E/D SS Exit Sensor or SU/ LSR Stacker Encoder SS Solenoid Lever Sensor or SU/ LSR Entrance Sensor SS Entrance Sensor or SU/ LSR Pusher home SS Pusher home position sensor SS Stacker Motor Encoder Sensor S-RESET REJ ACK

TEST # 5 Carrying & Storage Test Error Code VEND 1VEND 3VEND 2 Type of Abnormality (1) Abnormality in the stacker motor. (2) Abnormality in the encoder sensor. (1) Abnormality in the validator sensor. (2) A bill remains inside validator. (1) Abnormality in the stacker sensor. (2) A bill remains inside stacker path. Cash box is full. Abnormality in the stacker solenoid. (1) Abnormality in the pushing unit. (2) Abnormality in the stacker encoder. Press down the S-RESET button Be sure that “no 05” is in display and set the E/D switch to enable, if an error occurs follow legend below. NOTE by setting E/D to disable allows tester to be given another test command. E/D no 05 BSY VEND1 VEND2 VEND3 ABN STKF E/D S-RESET REJ ACK

TEST # 6 Stacker Solenoid Test Press down the REJ & S-RESET button Be sure that “no 06” is in the display and set the E/D switch to enable, if an error occurs follow legend below. NOTE by setting E/D to disable allows tester to be given another test command. NOTE this test DOES NOT apply to horizontal style transports (Bally, Sigma, Williams ect.) E/D no 04 BSY VEND1 VEND2 VEND3 ABN STKF E/D Exit Sensor Solenoid Lever Sensor Entrance Sensor Pusher Home Sensor Stacker Motor Encoder Sensor S-RESET REJ ACK

TEST # 7 Stacker Sensor Test E/D no 04 BSY VEND1 VEND2 VEND3 ABN STKF E/D SS Exit Sensor or SU/ LSR Stacker Encoder SS Solenoid Lever Sensor or SU/ LSR Entrance Sensor SS Entrance Sensor or SU/ LSR Pusher home SS Pusher home position sensor SS Stacker Motor Encoder Sensor Press down the ACK & S-RESET button Be sure that “no 07” is in the display and set the E/D switch to enable, if an error occurs follow legend below. NOTE by setting E/D to disable allows tester to be given another test command. S-RESET REJ ACK

Stacker Sensor Locations (1) Feed in sensor (photo transistor) (2) Stacker lever sensor (3) Feed out sensor (phototransistor) (4) Stacker encoder sensor (5) Feed out sensor (LED) (6) Feed in sensor (LED)

SU/ LSR STYLE SENSORS

TEST # 8 Bill Acceptance Test VEND 1VEND 2VEND 3 Type of bill $1 $5 $10 $20 $50 $100 This test can be done with or with out a stacker. With head alone you go into test # 8 with out changing dip switch settings. With a stacker you must turn dip switch 2-1 on before enabling test # 8. The validator identifies the type of bill, When a bill is returned the reason is indicated by the number of times the ABN led blinks also the return code is in the display (Refer to the table of return codes ) If you did not have a chance to feed in a bill and the validator went in to an abnormality error the ABN will blink then pause repeatedly the number of blinks is the code ( Refer to abnormal error codes ) NOTE this error will not be seen in the display. Press down the REJ, ACK and S-RESET button be sure that “no 08” is in display and set the E/D switch to enable then follow legend below. E/D no 08 BSY VEND1 VEND2 VEND3 ABN STKF E/D S-RESET REJ ACK

RETURN CODES Use these codes for when you had a chance to feed in a bill only and the bill is returned

ABNORMAL ERROR CODES Use these codes for when you did not have a chance to feed in a bill or the bill is taken in but not identified.