Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.

Slides:



Advertisements
Similar presentations
Foundation Trust Status for UHL Foundation Trust Project Director.
Advertisements

July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Update on IDNO/DNO working group DCMF 12 November 2009.
RIIO – ED1 timetable Robert Friel Regulatory Strategy and
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE Stakeholder Communications for Price Control information and proposed Tariff Change information.
Children and Families – Early Help and Prevention Children’s Centre Briefings Transition Arrangements October 2013.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
Senior Stakeholder Forum 04/02/2014. Agenda UK-Link Programme Update –Including Data Cleansing Update Nexus Modification Update Faster Switching EU Reform.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
5 February 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
TIME LINE SCHEDULLE. TIME SCHEDULLE 2012 JanFebMarAprMayJunJulAugustSeptOct Prep. Meeting 1 ExCom Meeting Obtain Information TOR Drafting 1st Annouchment.
Liquidity: statutory consultation on the ‘Secure and Promote’ licence condition Power Trading Forum Martin Bell 12/12/13.
Smart Grid Forum - Update DCMF Meeting – 7 February 2013 Gareth Evans Head of Profession – Engineering Ofgem.
Code Administrators Working Group Introduction 28 August 2008.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Meeting with FNQ consumers/stakeholders 15 January 2014.
© British Gas Trading Limited 2011 DNO Losses Incentive- Summary.
Better Regulation: Expenditure assessment and incentives 29 April 2013.
Capturing the value of innovation Introductory comments – 2012 LCN Fund Conference Hannah Nixon – Senior Partner, SG&G (Distribution)
15 January 2010 energynetworks.org 1 PRESENTED BY SIMON BROOKE Revised DCMF Terms of Reference Distribution Charging Methodology Forum.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF CMG Amending the DCMF Terms of Reference Distribution Charging Methodology.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
Energy Suppliers Forum CDCM/EDCM - CMG Update Mo Sukumaran – CMG 10 November | Energy Networks Association.
In partnership with PwC Technology for learning in the FE and Skills sector Cathy Ellis, Director, Improvement, Becta on behalf of Becta and LSC BETT 08.
The Australian Energy Regulator Public Forum NSW electricity distribution & transmission revenue proposals July 2014.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF WSA Presentation from Workstream A looking at the Network Modelling aspects.
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
CDCM Training Session Introduction to producing DUoS Tariffs using CDCM Models Julia Haughey (EDF Energy) Binoy Dharsi (IPM Energy Retail Ltd) 20 December.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
The Australian Energy Regulator TasNetworks Public Forum Revenue Proposal 1 July 2014 to 30 June July 2014.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
January 24, 2016 energynetworks.org 1 The SoC Project A PRESENTATION BY THE REGULATION GROUP OF THE ENERGY NETWORKS ASSOCIATION PRESENTED BY ANDREW NEVES.
Update to NLAG board 22 nd December Sep Jan MCE Workforce and OD Oct Nov Dec IM&T Estates Finance In hospital Model Out of hospital Model Progress.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
Network Flexibility Mike Wassell Transmission workstream, January
Consumer Research for DPCR5 Stakeholder meeting 15 June 2007 Laura Nell, Quality of Service, Ofgem.
Structure of Charges: Update and next steps DCMF 10 September 2008.
Industry Dialogue on xoserve Services 14 th September 2007.
Developing a national governance framework for health promotion in Scottish hospitals Lorna Smith Senior Health Improvement Programme Officer NHS Health.
European Developments Transmission Workgroup 3 rd May 2012.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
12 November energynetworks.org 1 PRESENTED BY MO SUKUMARAN, ON BEHALF OF WSB Presentation from Workstream B Pricing Modelling (EDCM/CDCM) Common.
LAS Diagnostic Timetable April May June July August
Terms and Conditions Review 2011
Annual Review of Shrinkage and Leakage Model
Code Governance Review UNC Modification Proposals
RIIO-GD1:network charging volatility
SO Incentives Consultation
Transmission Workgroup 4th October 2012
All Wales Safeguarding Procedures Review Project
SO Incentives from April 2010
Revised engagement approach for draft GTAC
NTS Entry Charging Review Update
Exit Capacity Substitution and Revision
Mod 0621 Amendments to Gas Transmission Charging Regime
Mark Freeman 29th January 2007
Options for the Development of a Demand Side Response Mechanism
Generic Revenue Driver Methodology
Ofgem presentation to Gas Transmission Workstream
Transmission Workgroup July 2012
Gas Customer Forum 28 July 2008
Presentation transcript:

Energy Networks Association RIIO-ED1 Update for Suppliers December 2012

ENA members

Agenda  Last meeting covered the background to the RIIO- ED1 price control review, the initial timetable and the key elements in relation to price certainty  This meeting will provide an update on –Where we are in the process –The Ofgem strategy consultation document published in September –The timetable and key milestones going forward  A proposal to set up a series of supplier/all DNO meetings at key parts of the process to agree how information can be shared across all suppliers at a single forum

RIIO - ED1 timetable PHASEYEARMONTHMILESTONE Strategy Development 2012FebruaryOpen letter consultation published (8 weeks consultation) SeptemberStrategy consultation published (8 weeks consultation) Initial Business Plan Assessment and fast- track decision 2013FebruaryStrategy decision published JulyDNOs submit & publish business plans Invitation for comments (4 weeks) OctoberInitial assessment and fast track draft Determination published (8 weeks consultation) Draft and Final Determination and launch 2014FebruaryFast track final determination published MarchNon-fast track DNOs resubmit & publish business plans Invitation for comments (4 weeks) JulyNon-fast track draft determination published (8 weeks consultation) NovemberNon-fast track final determination published DecemberStatutory consultation (28 days) on licence modifications 2015AprilWednesday 1 st new price control (RIIO-ED1) commences

 The document sets out Ofgem’s proposed approach to the next electricity distribution price control (RIIO-ED1) which will run for eight years from 1 April The document; –Focusses on meeting the challenges of delivering a low carbon, sustainable energy sector while maintaining business as usual –Consults on outputs –Sets out the core elements of the price review framework –Sets out the requirements for DNOs’ Business Plans  Specifically in relation to revenue profiling and charging volatility Ofgem set out; –A timetable that ensures that business plans are submitted nearly two years in advance of the commencement of the price control review to give visibility of the materiality of any changes –Seek views on whether this is adequate or whether further steps are needed  In October 2012 Ofgem also published their conclusion on mitigating network charging volatility arising from the price control settlement proposing the following is built into RIIO-ED1 –Improved information for suppliers –Restricting the frequency of intra-year charge changes –Increasing the lag on recovery of incentive reward/penalties and for some uncertainty mechanisms Strategy document update

Supplier key milestones 2013 February 2013  – Strategy decision published which will include –Form of the business plan –Financing assumptions –Details of incentives –Details of uncertainty mechanisms and triggers July 2013 –Submission and publication of Business Plans October 2013 –Initial assessment of business plans and publication of fast track Initial Determination

ENA propose to facilitate three workshops in 2013 for suppliers at key points in the process - all DNOs will be represented Timing  Early February –Ofgem decision document on charging volatility –Feedback from DNOs on the strategy consultation and impact on business plan development –Supplier feedback/expectations  Early May –Feedback from DNOs on the strategy decision and impact on business plan development –Supplier feedback/expectations  Early August –Business Plan submission and publication –Supplier feedback  This will be in addition to individual DNO engagement with suppliers and other stakeholders  Further workshops will be arranges if required Supplier engagement proposal

 Does this cover what is needed ?  Are the timings correct ?  What is the best forum ? –Separate seminar organised by the ENA –Separate session at the DCMF  How do we ensure all suppliers are invited ? –ERA for large suppliers –Small suppliers Questions