TF Joint Operations Review Commissioning Plan C Neumeyer 2/10/05 Test Shots Instrumentation Benchmarking.

Slides:



Advertisements
Similar presentations
Kevin Coke ID#: Rochede Sibblies ID#: Sandrene Haughton ID#:
Advertisements

Properties of cast resin transformers
Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
C. Fernández Bedoya, A. Navarro, I. Redondo. C. Fernández Bedoya November 29th, Goal: Replace SC crate with simple CuOF electronics and place TSC.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
Partial discharge analysis of defective three-phase cables An overview of an ongoing project involving the generation and analysis of PD within distribution.
NSTX TF Flag Joint Review ANALYSIS & DESIGN C Neumeyer 9/3/3.
NSTX Center Stack Upgrade Workshop Brainstorming on Design Solutions for TF Joint C Neumeyer Jan 22, 2009.
AD monitoring March, Applying CCD(CMOS) Measuring Methods 1. Liquid Level Detection 1.1 Applying CCD(CMOS) Measuring Methods (1)
MuCool Test Facility Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 12/13 August 2002.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 4/10/03.
Unpack From Box and Inventory Technical Bulletin User’s Manual Assembly Procedure Direct or Strap Pole Mounting Kit Face to Southern Sky High Temperature.
Scripps Institution of Oceanography HF Radar Installation Info Tom Cook & Eric Terrill Scripps Institution of Oceanography University of California, San.
TF Joint Voltage Drop Instrumentation Robert Marsala (609) Hans Schneider (609) Engineering Operations August 7, 2003 TF_JOINT_Final_Design_Review.ppt.
Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002.
TF FLAG JOINT HIGH CURRENT TEST FIXTURE INSTALLATION TO BE IN THE NSTX TRANSITION AREA Features Assembled Components: Flag and Mating Section of TF Center.
Zensol Automation Inc. ZENSOL First Trip Monitoring In addition to doing timing and motion on circuit breakers, our CBA-32P instruments are capable of.
NA62 GigaTracKer Working Group meeting Integration and GTK-carrier PCB design April 9, 2013 Michel Morel.
Proposed TF Joint Design C Neumeyer 2/26/9 Notes: 1)Several concepts included are based on ideas developed by R Woolley 2)No analysis has yet been performed.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
NSTX TF Flag Joint Design Review INTRODUCTION C Neumeyer 8/7/3.
NSTX TF Flag Joint Design Review OVERVIEW C Neumeyer 8/7/3.
NSTX Center Stack Upgrade Workshop Requirements & Design Point C Neumeyer Jan 22, 2009.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
Signals from ISTP-001 April 11-13, 2005 Preliminary Assessment C Neumeyer.
November 18, 2002Richard Talaga1 Target Hall Instrumentation NuMI Neutrino Beam Devices Instrumentation Review Instrumentation &Communication Overview.
Hardware Training Product: ITMS2.
NSTX dynamic structural responses to disruptions could be measured by expanding the existing TFJ_FISO system R. Woolley 13 January 2010.
Failure of Original TF Inner Leg Assembly C Neumeyer 4/10/3.
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
TF Joint Operations Review Introduction C Neumeyer 2/10/05 Scope and Outline of Review Summary of Findings from 2004 Run Review of Joint Force, Pressure.
Second Order Analysis In the previous classes we looked at a method that determines the load corresponding to a state of bifurcation equilibrium of a perfect.
Peer Review NSTX TF Hub Assembly Friction Coating C Neumeyer 10/27/04 Requirements Testing Calculation Update Implementation.
1 HD SIGNAL CONDITIONER SERIES SAMPLE HOLD TRANSMITTER MODEL HD-SHC MODEL & SUFFIX CODE SELECTION HD-SHC MODEL ■ Output2 signal Availability as Output1.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
NSTX TF Flag Joint Torque Collar Chit Review C Neumeyer 9/11/3.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus April 14, 2010 PF4/5 Terminal Stress Existing PF4/5 Support Weld Algorythm Moment Influence.
1 HD SIGNAL CONDITIONER SERIES LIMITER TRANSMITTER MODEL HD-LIM MODEL & SUFFIX CODE SELECTION HD-LIM MODEL ■ Output1 signal ■ Output2 signal Availability.
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
NSTX TF Flag Joint Design Review SUMMARY C Neumeyer 8/7/3.
TF Joint Operations Review Simplified Modeling & Protection C Neumeyer 2/10/05 IP and OOP Load Modeling Linear Model of IP and OOP pressure at Joint FEMLAB.
Proposed TF Joint Design Concept #1 C Neumeyer 3/23/9 Notes: 1)Several concepts included are based on ideas developed by R Woolley 2)No analysis has yet.
NSTX TF Flag Joint Status of Design, Analysis, Test Activities & Design Review Preparations C Neumeyer NSTX Team Meeting 7/24/3.
AWB NSTX TF Flag Joint Design Review April 10, 2003 Art Brooks.
Pixel upgrade test structure: CO 2 cooling test results and simulations Nick Lumb IPN-Lyon MEC Meeting, 10/02/2010.
REQUIREMENTS & ASSUMPTIONS C Neumeyer 4/10/3. FIELD AND CURRENT Base GRD requirement: 3kG at R 0 =0.854m with 4.5 sec flat top, once every 300s
A PROPOSED TF JOINT DESIGN FOR THE NSTX CENTERSTACK UPGRADE Robert D Woolley 25 February 2009.
Engineering Operations Outage Schedule The vessel & beamline are under vacuum. 1st Bake-out complete. Air leaks found and fixed. The OH coil will be installed.
Engineering Operations TF Commissioning Mechanical testing of TF flag/box assemblies complete, inner bundle installed, and all joints made up. Joint resistance.
Cockpit Voice Recorder (CVR) Configuration zUnused channel acts as vibration transducer.
Preliminary Analysis of TF Joint Behavior* C Neumeyer NSTX Team Meeting 2/12/4 *Summary from 1/29/4 Presentation.
Date of download: 6/21/2016 Copyright © ASME. All rights reserved. From: Thermal Pain in Teeth: Electrophysiology Governed by Thermomechanics Appl. Mech.
Date of download: 6/22/2016 Copyright © ASME. All rights reserved. From: Plastic Limit Loads of Pad Reinforced Cylindrical Vessels Under Out-of-Plane Moment.
Liquid Argon Purity Monitor Testing Bonnie Weiberg TRAC Program Summer, 2015 ICARUS clone made at FNAL (S. Pordes - FNAL May 13th 2006)
Liquid Argon Purity Monitor Testing Bonnie Weiberg TRAC Program Summer, 2015 ICARUS clone made at FNAL (S. Pordes - FNAL May 13th 2006)
TF Joint Testing Data Acquisition Special Test Equipment Hans Schneider with Robert Marsala (609) Engineering Operations April.
NSTX TF Flag Joint Design Review OVERVIEW C Neumeyer 8/7/3.
Elasto - plastic behavior of beam-to- column connections with fillets of steel bridge frame piers.
Optical Fiber Sensors for Cryogenic applications Presented by: Daniele Inaudi, CTO SMARTEC
Instrumentation for status monitoring of SST-1 superconducting magnets
MECH 373 Instrumentation and Measurements
MECH 373 Instrumentation and Measurements
Feather_0.4: 4-run test report
WP02 PRR: Master Oscillator and RF Reference Distribution
TPC Support and Constraint TPC Support
MuCool Test Facility Instrumentation Update
D. Kumar, K.T. Manal, K.S. Rudolph  Osteoarthritis and Cartilage 
University of Illinois (UIUC)
LightBend™ 1xN Fiberoptic Switch
University of Illinois (UIUC)
Presentation transcript:

TF Joint Operations Review Commissioning Plan C Neumeyer 2/10/05 Test Shots Instrumentation Benchmarking

Shot List (Initial Phase to 4.5kG)

In-Plane Moments Corresponding to Bt Levels in Shot List Mech Failure 2004 Run Worst Case 2004 Run Worst Case Liftoff 4.5kG Applied EM Load (Worst Case) Applied EM Load (Worst Case) Moment at Joint Based on Analysis (Best Case) Moment at Joint Based on Analysis (Best Case)

In-Plane Pressures Corresponding to Bt Levels in Shot List Peak Pressure at Joint With No Support (Worst Case) Peak Pressure at Joint With No Support (Worst Case) Peak Pressure at Joint Based on Analysis (Best Case) Peak Pressure at Joint Based on Analysis (Best Case) 4.5kG

Voltage Probes Same as last run except 8 channels have A&B monitoring Allows monitoring of out-of-plane loading Web page developed to archive probe vs. channel assignments (instead of reliance on notebook records)

Fiber Optic Temperature, Strain, and Displacement Flags (inner, outer/top, bottom) 4 flags x 3 strain/flag = 12 strain 4 flags x 1 temp/flag = 4 temp Hub and Flag twist angle (top, bottom) 2 displacement Flag end ∆Z & ∆  motion (top, bottom) 4 displacement Hub (top only) 1 displacement FISO Technologies, Inc. Total 23 transducers8 conditioner channels New

FISO Joint Res Meas System CAMAC FISO TF Joint Inst Rack Top Voltage Probe Cable Tray + 8 f/o extension cables Top Voltage Probe Cable Tray + 8 f/o extension cables Bottom Voltage Probe Cable Tray + 8 f/o extension cables Bottom Voltage Probe Cable Tray + 8 f/o extension cables Max 8 signals at a time from Top or bottom Max 8 signals at a time from Top or bottom

Fiber Optic Displacement Mounting Monitor Flag End Motion Same As Last Time

Fiber Optic Displacement Mounting Relocate Hub/Spline Twist on to Hub Top Hub Plate Connections

Fiber Optic Displacement Mounting Modify for ∆Z & ∆  motion on a single flag Extend over new insulating boots

Benchmarking Measurements Info to be extracted from analysis In addition, IP and OOP moments will be backed-out from voltage probe data for one-PF-at-a-time shots to benchmark against influence matrix generated from NASTRAN

Procedure Initial phase will commission up to 4.5kG Test shots will be conducted and data compared to predictions after each shot Performance of system vs. predictions will be judged Modeling coefficients and protection limits will be iterated including additional NASTRAN runs as necessary Operating envelope will be adjusted accordingly Later phase of commissioning toward 6kG will be performed at future date pending results at 4.5kG and when needed for NSTX research program