US Project Plan for MICE Mark Palmer Peter Garbincius, Alan Bross, Rich Krull Fermilab November 24, 2014.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Cooling Channel Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
Project Managers Report Video Conference 172 Roy Preece 11 th December 2014.
RF Cavity / Coupling Coil Module
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
Muon Ionization Cooling Experiment: U.S. Muon Accelerator Program Perspective and Approach Mark Palmer May 7, 2013.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Executive Board Meeting Roy Preece 23rd May 2014
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MICE – UK Plan Roy Preece STFC RAL DOE Review of MAP Brookhaven National Laboratory 13 th August 2014.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
MICE Construction Project Update: SSs, PRY, Cavities, Tracker… 1MAP Friday Meeting – January 30, 2015 Alan Bross.
US Project Plan for MICE Mark Palmer Peter Garbincius, Alan Bross, Rich Krull Fermilab November 24, 2014.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
US Construction Project: SSs, PRY, Cavities and test program MICE Project Board and RLSR – November 17, 2014 Alan Bross1.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 5, 2016.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
US Construction Project: SSs, PRY, Cavities and test program 1.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 16, 2015.
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Spectrometer Solenoid Recovery: Options for Moving Forward Mark Palmer BNL April 5, 2016.
Reported by Ron Prwivo for Ian Robson. Overview Response to Recommendations from the RLSR of November 2014 – very good, RF staffing remains an issue Very.
Muon Ionisation Cooling Experiment Overview
Resource Loaded Schedule and Budget Profile
Jim Fast Pacific Northwest National Laboratory
Completion of the MICE-US construction project
Status of the MICE Construction Project
Spectrometer Solenoid Recovery: Options for Moving Forward
UK Financial Plan & Risks
MICE Project in the US: Completion of Efforts
MICE PM Report Progress with the Infrastructure A few problems
Management Breakout: MREFC Budget Summary Victor L
Presentation transcript:

US Project Plan for MICE Mark Palmer Peter Garbincius, Alan Bross, Rich Krull Fermilab November 24, 2014

Introduction This talk will review: Step IV US Deliverables –Construction Status –PRY Re-Cap –Comments on Risks Cooling Demonstration US Deliverables –Planning and Major Milestones –Prototyping –Engineering Design and Critical Issues Conclusion Peter Garbincius’ talk will cover budget details, risk register status, etc. Alan Bross’ talk will cover technical details MICE Project Board and Resource-Loaded Schedule Review | April 16-17, 20152

STEP IV STATUS MICE Project Board and Resource-Loaded Schedule Review | April 16-17, 20153

MICE-US Step IV Construction Status Step IV Fabrication and Major Deliverables –Spectrometer Solenoids (2) – Delivered to RAL –LiH Absorber – Delivered to RAL –LH 2 Absorber and Safety Windows 2 Absorber Windows + 1 Spare Delivered to RAL Safety Windows – 2 types: –1 Safety Window Type Spare Delivered to RAL –1 Safety Window Type Spare Delivered to RAL –But destructive testing now required for safety windows… –Will deliver all remaining spares to RAL –Partial Return Yoke South Frame & Wall Delivered to RAL North Frame & Wall ETA in Liverpool  April 27 –Installation and Commissioning Spectrometer Solenoids Fiber Trackers PRY MICE Project Board and Resource-Loaded Schedule Review | April 16-17, 20154

Update on the PRY “Saga” At November MPB/RLS Review –Typhoons and snowstorms had delayed material delivery at the time of the review Delivery was further delayed by work slow-down at Port of Los Angeles (contract disputes) Our High-Level Response (utilizing internally held contingency funds) –Review and update plan to minimize chance of installation issues at RAL (added scope in US effort) –Work with fabricator to expedite schedule (overtime) –Utilize targeted air shipments to roughly preserve overall schedule (pay premiums) MICE Project Board and Resource-Loaded Schedule Review | April 16-17, 20155

PRY Specific Actions 1.Validate equivalence of the two sets of support frames Enable one set of frames to be used for preliminary installation checks and survey at RAL While second set of frames could be used for full vertical fit-up checks of South and North walls at vendor 2.Air ship first set of frames to RAL Used to verify both North and South frame fit-up in Hall and shimming requirements Installed in South location for receipt of South Wall 3.Air ship South Wall to RAL Full fit-up carried out prior to shipping in US Expedited packaging by shipper at vendor location Ready for immediate installation upon arrival at RAL 4.Expedited Fabrication Release of funds for vendor overtime to ensure full machining order completed ASAP Vendor willing to shift jobs between contractors to utilize available machines and optimize schedule 5.Sea shipment for North Wall, North Frame, End Plates Very modest impact on target schedule  expending additional funds to avoid a few days impact not worthwhile Costs reduced by ~2x by weight relative to air shipment MICE Project Board and Resource-Loaded Schedule Review | April 16-17, Represents ~1/3 rd of total PRY Mass

Key PRY Milestones MICE Project Board and Resource-Loaded Schedule Review | April 16-17, Nov `14 MPB Date Added Milestone Date Current Date ETA Liverpool Now 4/27/15 Re-plan to minimize installation risk at RAL Re-plan enabled a more rapid installation upon arrival than originally envisioned Again expect to benefit from a more rapid installation than originally planned to bring overall schedule back in line with contingency-loaded plan. As feared at Nov MPB, additional delivery delays were incurred before all PRY material in hand

The PRY “Bottom Line” MICE Project Board and Resource-Loaded Schedule Review | April 16-17, Overall, suitable application of project-held contingency will result in overall completion with only minor variance from schedule presented at the November MPB Meeting. 2.Release of contingency funds to achieve overall schedule in line with nominal contingency rates. 3.A strong focus on maintaining an efficient integration process has been crucial.

Comments on Step IV Risks Fit-up and acceptance requirements for PRY largely mitigated PRY installation risks –Fit-up risks have been retired Major remaining Step IV risk is associated with magnet commissioning MICE Project Board and Resource-Loaded Schedule Review | April 16-17, 20159

COOLING DEMONSTRATION STATUS MICE Project Board and Resource-Loaded Schedule Review | April 16-17,

MICE-US Cooling Demonstration Construction Planning & Milestones Planning and Major Milestones –Have extensively reviewed RLS since Nov MPB –Have updated key BOEs (time and cost) –Overall cost and Risk reasonably stable (see talk by Peter G.) –Modest schedule adjustments Mainly planning cleanup due to the large scale of the re-planning presented at Nov MPB Internal milestones have changed at the 1-quarter level Delivery milestones have changed at the 1-month level MICE Project Board and Resource-Loaded Schedule Review | April 16-17, months

MICE-US Cooling Demonstration Prototyping Prototyping Tests –201 MHz RF Cavity in MTA Characterized with B=0 (no issues found) Now preparing for tests in B-field (key milestone: May 29, 2015) –RF Module components Updated actuator design Final tweaks to coupler design –New clamp design to enable easier rotation to achieve proper coupling –Cover plate to minimize vacuum connection at coupler cooling line penetration MICE Project Board and Resource-Loaded Schedule Review | April 16-17, Coupler New RF Cavity Tuner Actuator Prototype

MICE-US Cooling Demonstration Engineering Design & Critical Issues I RF Module Design –Critical interface milestones successfully passed since last review Resulted in RF Module design being a minimal variant from present Single Cavity Test System –Preliminary design review held in January Revised vacuum requirements and vacuum system design were the principal focus –Engineering design review planned for end of this month (delayed due to conflict with final dates for this review) After sign-off, vacuum vessel and general hardware procurement will begin –Updates to schedule since last review have resulted in All individual components being ready in Fall 2015 Full assembly to start immediately after the new year (i.e., 2016) Plan is to deliver 2 complete modules to RAL by mid-2016 –Fully assembled and ready for high power processing –Preparation in the US will include initial bakeout and low-power characterization –Delivery is roughly 1 month later than envisioned at Nov MPB – furthermore the UK installation date has now moved earlier, thus reducing our schedule slack to ~3 months –Critical issue then becomes the deployment and commissioning plan at RAL US team strongly supports plan to commission modules and RF stations before installation on MICE beam-line Requires an aggressive strategy in the MICE Hall and STFC support Offers only plausible route to doing full-power checkout/conditioning with all hardware readily accessible MICE Project Board and Resource-Loaded Schedule Review | April 16-17,

MICE-US Cooling Demonstration Engineering Design & Critical Issues II PRY Extension –Critical interface milestone (maximum cooling channel length) successfully passed since last review –Steel pre-orders (JFE) are now in place with expected delivery late in the US FY (~September) Based on lessons learned with Step IV Procurement –Must finalize interface and final design issues in time to award fabrication contracts by August 2015 Conflicts between Step IV integration and Cooling Demonstration planning are significant and must be actively managed MICE Project Board and Resource-Loaded Schedule Review | April 16-17,

CONCLUSION MICE Project Board and Resource-Loaded Schedule Review | April 16-17,

Closing Comments Step IV Integration Effort has remained on track since last MPB/RLS review –Has required aggressive management of US contingency options and attention to ensuring efficient installation Cooling Demonstration –US Cost and Risk estimates remain stable –Some adjustments (relatively minor) to construction schedule Critical Issues –Maintaining the focus on efficient integration and commissioning of Step IV –Ensuring that critical engineering milestones for the Cooling Demonstration hardware are not allowed to slip (even with Step IV conflicts) –Developing a consistent and effective integration and commissioning plan for the Cooling Demonstration MICE Project Board and Resource-Loaded Schedule Review | April 16-17,