No: 1 CEMSIS wp6_beg022_v0_4_intro slides.ppt CEMSIS FIKS-CT-2000-00109 Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, Deryk.

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
ITIL: Service Transition
Contractor Safety Management
Nuclear power plant siting International Nuclear Power Conference October 23, 2009, Tallinn.
NATIONAL CENTRE OF QUALITY, SAFETY, AND ACCREDITATION OF HEALTH INSTITUTIONS Activity Plan of NCQSA-HI with World Bank Project (WB)
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
The Process of Interaction Design. Overview What is Interaction Design? —Four basic activities —Three key characteristics Some practical issues —Who are.
1 Certification Chapter 14, Storey. 2 Topics  What is certification?  Various forms of certification  The process of system certification (the planning.
The Process of Interaction Design. What is Interaction Design? It is a process: — a goal-directed problem solving activity informed by intended use, target.
Programmes to increase the uptake of EPC recommendations ADENE, PT.
Nuclearsafety.gc.ca Development and Implementation of Regulatory Requirements for the Security of Radioactive Sources A Canadian perspective Karen Mayer,
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
No: 1 CEMSIS wp6_beg010_v0_1_fisa slides.ppt CEMSIS FIKS-CT Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, Deryk Pavey,
© Siemens AG, CT SE 1, Dr. A. Ulrich C O R P O R A T E T E C H N O L O G Y Research at Siemens CT SE Software & Engineering Development Techniques.
Article 5 of the Energy Services Directive Edward Green.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
No: 1 CEMSIS 1 WP3 - Use of pre-developed products Key issues N. Thuy EDF R&D.
Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG Barcelona May DISPOWER Distributed Generation with High Penetration of Renewable.
1 Packaging bio- methane connections for the future Dan Anderson CEng 11 th January 2012.
ITEC224 Database Programming
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
1 Database Systems: Design, Implementation, and Management CHAPTER 6 Database Design.
Tom MAZOUR IAEA, Division of Nuclear Power
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
IAEA - Department of Nuclear Safety & Security
A. Aimar - EP/SFT LCG - Software Process & Infrastructure1 Software Process panel SPI GRIDPP 7 th Collaboration Meeting 30 June – 2 July 2003 A.Aimar -
Luisa Franconi Integration, Quality, Research and Production Networks Development Department Unit on microdata access ISTAT Essnet on Common Tools and.
Jörg R. Müller, Technical University of Braunschweig
1 February 2005 Briefing Sessions Draft Regulations Using Water for Recreational Purposes.
MESH UK Workshop 19 October 2006 Introduction Dr Paul Gilliland Marine Policy Adviser and MESH Partner Lead Natural England.
European Operational Concept Validation Methodology E-OCVM Version 3: What’s New Episode 3 - CAATS II Final Dissemination Event Matthias Poppe DFS Episode.
Poverty Alleviation through Cleaner Energy from Agro-industries In Africa - PACEAA - Introduction to the project 09 November 2007.
No: 1 CEMSIS wp6_beg037_v0_2_fisa 2003 slides.ppt CEMSIS FIKS-CT Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, Deryk.
SacProNet An Overview of Project Management Techniques.
> AREVA NP GmbH NRPP-G, AREVA NP All rights are reserved, see liability notice.
Information Systems Engineering. Lecture Outline Information Systems Architecture Information System Architecture components Information Engineering Phases.
CAST Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework Programme.
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
UK Link Programme Update to PNUNC June 17 th 2013.
Gary MarsdenSlide 1University of Cape Town Human-Computer Interaction - 4 User Centred Design Gary Marsden ( ) July 2002.
PROJECT LIFECYCLE.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Lecture 2 –Approaches to Systems Development Method 10/9/15 1.
Safety Management System Implementation Michael Niels Thorsen Moscow 15 September 2005.
11/24/2015Dr. SASTRY-PROJ SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D.
PH 8.01/99 - Seminar, Brussels, 9 November 2005 PH 8.01/99 – Seminar on “Dissemination of PHARE projects description and results” Overview of BG PHARE.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
Over View of CENELC Standards for Signalling Applications
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Program Development Cycle
EO Dataset Preservation Workflow Data Stewardship Interest Group WGISS-37 Meeting Cocoa Beach (Florida-US) - April 14-18, 2014.
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
IAEA International Atomic Energy Agency New IAEA Safety Guide (information) Human Factor Engineering for NPP (DS492) Alexander Duchac SAS,NSNI.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
IAEA International Atomic Energy Agency Technical Meeting on Regulatory Oversight of Human and Organizational Factors Vienna, Austria | December.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
DT249/4 Information Systems Engineering Lecture 0
Raytheon Parts Management
QUALITY DEVELOPMENT IN COLOMBIA AND LATIN AMERICAN
CEMSIS FIKS-CT Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, wp6_beg037_v0_2_fisa 2003 slides.ppt.
ESS.VIP Validation Item 5.1
PSS verification and validation
PSS0 Configuration Management,
Access to data requirementS
Presentation transcript:

no: 1 CEMSIS wp6_beg022_v0_4_intro slides.ppt CEMSIS FIKS-CT Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, Deryk Pavey,

no: 2 CEMSIS wp6_beg022_v0_4_intro slides.ppt CEMSIS Objectives u Programmable Instrumentation and Control (I&C) l safety systems (e.g. protection) l safety-related systems (e.g. control, data presentation) u Common approach to development and safety justification l maximise safety l minimise cost u Modernisation/Refurbishment l analogue/discrete logic replacement with computer-based systems

no: 3 CEMSIS wp6_beg022_v0_4_intro slides.ppt ‘Stakeholders’ in CEMSIS u Nuclear Plant Operator l British Energy (co-ord.)UKelectricity generation l Electricite de FranceFelectricity generation l British Nuclear FuelsUKnuclear fuel processing u Suppliers & System Integrators l Framatome ANPDEI&C supplier l Sycon InternationalSEsystem developer u Safety Authorities & Assessors l AV NuclearBinspection and licensing l AdelardUKsafety consultancy l SKI (Sycon subcontract)SEinspection and licensing u IT Research l TU LundSEresearch & education

no: 4 CEMSIS wp6_beg022_v0_4_intro slides.ppt Key Issues u Harmonisation & Structuring of Safety Justification approaches u Definition of Requirements for Systems Important to Safety u Use of Pre-Existing Software in Systems Important to Safety l potentially including class A systems u Use of Languages and Tools in Systems Important to Safety

no: 5 CEMSIS wp6_beg022_v0_4_intro slides.ppt CEMSIS Modernisation Context Utility Supplier Regulator Project viability User requirements process Requirements document SIS requirements specification Tendering process Test and Verification SW Development SIS Implementation Decomposition & Design Final Licensing / Approval Normal operation and maintenance Acceptance & Phased Introduction Validation Installation & Site Commissioning Negotiation & Acceptance Pre-qualification (independent assessor) Amended SIS requirements Safety Justification Plan Key: = Work Package Number Discuss/ Agree 3 3 Safety Justification 1 1 Regular communication and informed comment

no: 6 CEMSIS wp6_beg022_v0_4_intro slides.ppt Work Package Tasks Safety Justification Survey and Framework Safety Justification Framework WP1 Requirements Capture Survey and Lifecycle Requirements Capture Guidelines WP2 Pre-Existing S/W Strategy & Techniques Pre-Existing S/W Guidelines WP3 Languages & Tools Review and Evaluate Languages & Tools Report WP4 WP0,6 Management and Dissemination Case Studies: UK: fuel reprocessing F: PWR I&C replacement SE: safety monitoring + Public Domain Example WP5