Microwave Schottky Pickups at Fermilab Ralph J. Pasquinelli January 14, 2004.

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
I. Syratchev F D, GHza, mmb, mmR/Q, k  /m  M, % QMQM E S /E A K T, V/pC/m/m  D, % QDQD  D, deg
Latest Results from Digital Tune Monitor Vsevolod Kamerdzhiev (APD) Alexei Semenov (Instrumentation) Tevatron Dept. meeting, March 16, 2007.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Technological aspects of Electron Lenses, errors and control Vsevolod Kamerdzhiev for Fermilab Beam-Beam Compensation team LARP Mini-Workshop on Beam-Beam.
May 22, 2008 TJRMICE Beamline Collimation and Correction 1 Tom Roberts Carol Johnstone Muons, Inc.
High Level LHC Schottky Software Development Jerry Cai & The LAFS Team 28 January 2009 Presented by Elliott McCrory.
ALPHA Storage Ring Indiana University Xiaoying Pang.
High Level LHC Schottky Software Development Jerry Cai & The LAFS Team.
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
2002/7/04 College, London Beam Dynamics Studies of FFAG Akira SATO Osaka University.
Paul Derwent 18-Oct-15 1 Stochastic Cooling in the Fermilab AntiProton Source Paul Derwent Beams Division/Pbar/CDF Sunday, October 18, 2015.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
1 FermiLab Recycler Ring BPM Upgrade Based on Digital Receiver Technology R. Webber, J. Crisp, P. Prieto, D. Voy, C. Breigel, C. McClure, M. Mengel, S.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Brian Drendel June 8, Pulses of 120GeV proton beam, with intensity of ~8E12, from the Main Injector travel through the P1, P2 and AP1 beam lines,
Eric Prebys, FNAL. USPAS, Knoxville, TN, January 20-31, 2014 Lecture 20 - Cooling 2 Anti-protons are created by hitting a target with an energetic proton.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
CAN WE BUILD A SINGLE BUNCH FEEDBACK Eric Plouviez ESRF Diagnostic group.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Beam-based vacuum observations and their consequences Sergei Nagaitsev August 18, 2003.
Diagnostics for intense e-cooled ion beams by Vsevolod Kamerdzhiev Forschungszentrum Jülich, IKP, COSY ICFA-HB2004, Bensheim, October 19, 2004.
Electron Beam As High Frequency Wide Band Electrostatic 3D Kicker A. Ivanov*, V. Parkhomchuk, V. Reva Budker Institute of Nuclear Physics NANOBEAM-2008.
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
Paul Derwent 14 Dec 00 1 Stochastic Cooling Paul Derwent 14 Dec 00
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
Evolution of beam energy distribution as a diagnostics tool Alexey Burov, Bill Ng and Sergei Nagaitsev November 13, 2003.
Schottky Summary of status and plans for YETS 15/16.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Andreas Jansson, "Quadrupole Pick-ups", LHC BI-Review, November 19-20, Quadrupole Pick-ups  What is a quadrupole pick-up?  PS pick-ups and experimental.
FY07 RHIC Schottky and Tune Ripple Experiments Plans M. Blaskiewicz, K. Brown, D. Bruno, P. Cameron, C. Degen, A. Della Penna, W. Fischer, G. Ganetis,
Recycler Flying Wires Martin Hu Recycler Department.
Lecture 8- Microwave Landing System (MLS). Home Previous Next Help Definition Microwave an electromagnetic wave with a short wavelength in the range 0.001–0.3.
March Tune Meter - Betatron Coupling - P. Lebrun 1 f On Automated Betatron Coupling Measurements Using the Tevatron Tune Meter. Paul Lebrun Fermilab.
Debuncher Stochastic Cooling Paul Derwent March 3, 2016.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F f Quadrupole Pick-Ups at CERN & Fermilab A.Jansson FNAL.
RHIC head-on beam-beam compensation with e-lens N. Abreu, W. Fischer, Y. Luo, C. Montag, G. Robert-Demolaize J. Alessi, E. Beebe, A. Pikin 1. Introduction.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
Accumulator & Compressor Rings with Flexible Momentum Compaction arccells MAP 2014 Spring Meeting, Fermilab, May 27-31, 2014 Y. Alexahin (FNAL APC)
Update on the RHIC Stochastic Cooling J.M. Brennan M.M. Blaskiewicz and K. Mernick COOL Workshop 2015 Thomas Jefferson National Accelerator Facility September.
Analysis of Garren’s 27-Jul-2011 Hybrid Synchrotron Lattice J. Scott Berg Brookhaven National Laboratory Advanced Accelerator Group Meeting February 2,
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
2/07/2014 EMITTANCE MEASUREMENTS MTA BEAMLINE. PERFORMANCE All stable optics tunes work 4 very different operations have been installed Experimental tune.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
Measuring Chromaticity Beam Dynamics meets Diagnostics Workshop Florence, Italy 4 th – 6 th November, 2015 Dr. Rhodri Jones Head of the CERN Beam Instrumentation.
Oleksiy Dolinskyy December 1st, 2014
Follow up on SPS transverse impedance
Large Booster and Collider Ring
Beam-beam Effects in Hadron Colliders
Jeffrey Eldred, Sasha Valishev
    BEAM POSITION MONITORS USING A RE-ENTRANT CAVITY C. Simon1, S. Chel1, M. Luong1, P. Contrepois1, P. Girardot1, N. Baboi2 and N. Rouvière3.
G. Arduini, R. Calaga, E. Metral, G. Papotti, G. Rumolo, B. Salvant, R
Effective luminosity simulation for PANDA experiment
Rogowski coils as beam position monitors
Instability measurement plans at ATF
Transverse instability in the AD?
Recent Measurements in ACC1 (12.9. & )
Multipole Limit Survey of FFQ and Large-beta Dipole
He Zhang MEIC R&D Meeting, 07/09/2015
Presentation transcript:

Microwave Schottky Pickups at Fermilab Ralph J. Pasquinelli January 14, 2004

Microwave Schottky Pickups 5/9/03 LARP CollaborationR. J. Pasquinelli  Microwave Schottky Pickups at Fermilab  Pickup Design  Mechanical  Electrical  Recycler  System Response  Performance  Tevatron  Common Mode  Signal Processing  Performance

Microwave Schottky Pickups 5/9/03 LARP CollaborationR. J. Pasquinelli 1.7 GHz 109 x 75 mm aperture

Microwave Schottky Pickups 5/9/03 LARP CollaborationR. J. Pasquinelli Array Assembly

Microwave Schottky Pickups 5/9/03 LARP CollaborationR. J. Pasquinelli

Microwave Schottky Pickups 5/9/03 LARP CollaborationR. J. Pasquinelli Measured Pickup Sensitivity in Recycler Sum ModeDifference Mode Directivity Measured at dB

Microwave Schottky Pickups 5/9/03 LARP CollaborationR. J. Pasquinelli Beam Centering Reduces Common Mode Recycler Horizontal Pickup 1 x Protons

Microwave Schottky Pickups 5/9/03 LARP CollaborationR. J. Pasquinelli Recycler Automated Vector Signal Analyzer Program Provides momentum spread, tune, revolution frequency, calculated emittance.

Microwave Schottky Pickups 5/9/03 LARP CollaborationR. J. Pasquinelli Tevatron Schottky Signal Large Common Mode Signal Requires High Dynamic Range

Microwave Schottky Pickups 5/9/03 LARP CollaborationR. J. Pasquinelli

Microwave Schottky Pickups 5/9/03 LARP CollaborationR. J. Pasquinelli Tevatron Proton Schottky Signals Horizontal Vertical

Microwave Schottky Pickups 5/9/03 LARP CollaborationR. J. Pasquinelli Recycler Installation Tevatron Installation