Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, 29-30 September 2010 1 Paco Sanchez, RF Group, CELLS (Consortium for.

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

IOT Measurements & Amplifier Improvements at Diamond
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
THALES ELECTRON DEVICES
13 th ESLS RF meeting, DESY, 30/09 – 01/10/2009J. Jacob: Status of the RF Upgrade at the ESRF1 13 th ESLS RF Meeting 2009 DESY, 30 th September – 1 st.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
David Regidor, Moisés Weber (CIEMAT, Madrid, Spain) The IFMIF-EVEDA Accelerator Prototype will be a 9MeV, 125mA CW deuteron accelerator to validate the.
HVPS Upgrade for ALS Storage Ring RF System -Disconnect Switch Status
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
CWRF 2012 – High Power RF - May 7 th -11 th Brookhaven National Laboratory - USA 1 Status of the RF Activity at ESRF G.Gautier J.Jacob M.Langlois V.Serrière.
PSB C04 RF system Consolidation or upgrade? M. Paoluzzi – CERN BE-RF 11/23/20151.
Contents Overview of 150 MeV FFAG Accelerator
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Almost 40 years of operation with tetrodes in the CERN-SPS CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of RF-SPS team CWRF workshop,
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
STATUS OF THE SOLEIL RF SYSTEM
February 2010 ALBA Synchrotron Light Source Francis Perez.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
CWRF 2008, Geneva, March Alessandro Fabris on behalf of the Elettra RF Group Sincrotrone Trieste, Trieste, Italy. Elettra RF System Upgrade:
Operational experience of high-power RF at Diamond Light Source
The LHC RF Power Systems Skip the intro… CWRF08 workshop - March'08 1 Presented by : Luca Arnaudon Slides by : Olivier Brunner & Luca Arnaudon Important.
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
13 th ESLS RF Meeting – 1 st October 2008 DAMPY Cavity 1/20 80 kW at Dampy Francis Perez.
650 MHz Solid State RF Power development at RRCAT
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
ALBA RF Systems Francis Perez.
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
RFQ Installation Status 10/27/2015 October 27, 2015 Jim Steimel & Curtis Baffes.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
Status of the ELETTRA RF Plants
Report Technical Director Storage-Ring-Installation Completed
Areal RF Station A. Vardanyan
Report Technical Director Storage-Ring-Installation Completed
The Survey of the Power Supply Reliability at SSRF
Status of BESSY II and bERLinPro
Development of high-power IOTs as an efficient alternative to klystrons Morten Jensen Energy for Sustainable Science 24 October 2013, CERN.
High Energy Proton Synchrotrons
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Status and New Developments of RF Systems of ALBA
Construction and Commissioning of Electronic Test Benches
SPS TWC 200 MHz Super Proton Synchrotron Travelling Wave Cavities 200 MHz 4 x 1.0 MW cw 25 years of experience.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
12 GHz High Power RF components requirements for CEA activities
BEPCII RF POWER SOURCE AND INPUT COUPLER
IFMIF-EVEDA RF POWER SYSTEM
CEPC RF Power Sources System
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status and New Developments of ALBA RF Systems
Status and New Developments of ALBA RF Systems
IOT operation in the SPS Long term experience TWC 800 MHz
Presentation transcript:

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron Light Laboratory)

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September A.Introduction B.Schedule C.Installation D.DC – Commissioning E.RF – Commissioning F.Summary and Outlook Commissioning of the ALBA IOT-Transmitters

Paco Sanchez - 14th ESLS RF - ELETTRA, September ALBA TXs concept:  TX-IOT based HVPS -36 kV, 4 A P max = 80 kW cw f 0 = 500 MHz  TX = HVPS + IOT  1 TX  RF Lab  1 TX  Booster  12 TXs  SR A. Introduction

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September B. Schedule Technical Specs (ver 1.0)Nov – 2005 Call For Tender publicationFeb – 2006 CONTRACT30 – Nov – 2006 Delivery / Installation (TX02 – TX14 installed in Jan-2009, because of the building delays) TX01Jun – 2007Aug – 2007 TX02-TX06Jun – 2008Jul – 2008 TX07-TX10Sept – 2008Oct – 2008 TX11-TX14Oct – 2008 Acceptance (TX02 – TX14 commissioning split in DC and RF due to delays in the water cooling installation) (*) TX01Aug – 2007Oct – 2007 TX02 Sept – 2008 Nov – 2009 TX03-TX06Jul – 2010 TX07-TX10Nov – 2008Jun – 2010 TX11-TX14Dec – 2008Sept – 2010 (*) DC-Commissioning completed in 6 weeks (Jul – 2009), RF in 6 months (13 TXs)

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September C. Installation  Placing cabinets  Water cooling plants delayed  Cabling trenches and trays

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September D. DC Commissioning Visual inspection of cabinets and connection between them  Grounding plates, cabling and water piping Safety and interlock system  Emergency stop for a complete Sector (8 cabinets) Control and settings HVPS wire test (diameter 0.15 mm, length 380 mm) Ripple, stability, accuracy Auxiliary PS Withstand test (1h at 36 kV, w/o breakdown or corona)

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September IOT oxidation during long storage periods  Ion pump current too high  72 hours conditioning  HV idle current decreased  operate at HV for one night  For each Booster shutdown, operate IOT in HV for 8-10 hours 2.Passive IOT connected through CaCo without supervision  Ceramic broken due to multiple arcs  Isolate passive IOT, coax short! E. RF Commissioning - PROBLEMS For future improvements, see Bea’s presentation.

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Passive IOT connected through CaCo without supervision  Investigations on broken IOT (THALES, THOMSON, ALBA):  Provoke arcs in the 16 mm with a HV power supply (arcs seen at 32 kV)  Glue and reinstall IOT as passive (air instead of vacuum) (arcs detected at around 30 kW)  At 80 kW, arcs at around 50 kV  Active IOT  HV 50 kV in passive IOT Bea’s simulations (Microwave Studio) confirm these HV levels in the passive IOT. E. RF Commissioning - PROBLEMS

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September E. RF Commissioning - PROBLEMS 3.High Harmonic content (2 nd H)  Several IOTs presented very high level in the 2nd Harmonic (-18 dB)  THALES proposal: Install a ring to shift down resonances from 2 nd H  Ring to be placed in the primary output cavity  Screwed to the upper disk of the cavity  Acceptable level of the 2nd Harmonic (-54.5 dB)  ring to all IOTs

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September E. RF Commissioning - PROBLEMS 4.IOT ceramic broken  Several arcs detected, no explanation  THALES investigation (warranty)  due to the broken glass?  2 nd harmonic content?

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September E. RF Commissioning - PROBLEMS 5.IOT showed strange behavior  Multiple arcs, but still in operation. Needed further investigation  Sent back to THALES for THALES refurbishment (warranty) 6.Others  Multiple trips “Voltage/Current grid out of range”  Grid parameters were correct (seemed noise)  THALES suggests modifying the filters in the PLC  solved  Measurement filter updated in all PLCs  Driver gain too low (43 dB instead of 53)  Capacitor broken  Driver gains differences too high for CaCo  Readjust all gains around nominal (53 dB)  PSM modules failure (without trips)  21 modules failed (out of 840)  Replaced and repaired in THOMSON serial capacitor cracked

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September E. RF Commissioning - SUMMARY  Operation Time / Maintenance: CELLS Intranet Application Total TXs / IOTs CONTRACT14 / 17 ( spare) IOTs Status RF Lab1Operation Booster1Operation SR Sector 064Operation (2 spares used) SR Sector 104Operation (1 spare used) SR Sector 144Operation Spare #11Installed in sector 10 Spare #21Installed in sector 06 Spare #31Installed in sector TX / IOTs in operation. 3 spares IOTs used (1 broke, 2 under warranty)

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September F. Summary and Outlook  Modifications for the asymmetrical operation:  Mechanical prototype (Bea’s presentation)  Cooling and Ion Pump ON (passive IOT)  PLC logic (Passive IOT interlocks ON)  RF operation for DAMPYs conditioning  RF operation for Booster and SR commissioning  Planning for Transmitters / IOTs Maintenance: CELLS Intranet Application  New contract for Spare IOTs

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Many Thanks for your attention

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September

Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September