Roshene McCool SKADS Workshop 2007 DS3 – T1 Network Infrastructure and Data Transmission Roshene McCool Simon Garrington University of Manchester.

Slides:



Advertisements
Similar presentations
Seminar Report On Digital Power Line Carrier Communication
Advertisements

Vladimír Smotlacha, CESNET Accurate Time Transfer over Optical Network 6 th CEF Networks Workshop Prague 13 September 2010.
Telecommunications Overview Richard Selby. Local Access Network The link between the customer and the Local Exchange (or Switch) Sometimes called the.
Line Balancing Problem A B C 4.1mins D 1.7mins E 2.7 mins F 3.3 mins G 2.6 mins 2.2 mins 3.4 mins.
Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
Wi-Fi Maritime Communications Using TV White Spaces MsC Dissertation
Restricted Slow-Start for TCP William Allcock 1,2, Sanjay Hegde 3 and Rajkumar Kettimuthu 1,2 1 Argonne National Laboratory 2 The University of Chicago.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 3/15/2012OVSA Preliminary Design Review Meeting.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 11/7/2011OVSA Technical Design Meeting.
More routing protocols Alec Woo June 18 th, 2002.
Summary of Path Loss in Propagation
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
AtacamaLargeMillimeterArray Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain Fibre Optic Links for IF DTS Roshene McCool Jodrell Bank.
Ultra Wideband Digital Wireless Link By Matthew Carrier, Nicholas Merrill, Brandon Mui, Justin Burkhart Advisor: Professor R.W. Jackson.
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
ENGINEERING APPLICATIONS Telecommunication Long Distance Communication Handle large number of channels Signalling purposes Computer Networks Connecting.
How Global Positioning Devices (GPS) work
CCNA 1 Module 4: Cable Testing.
Terrestrial Microwave TK2133 A Lee Hau Sem A Lai Horng Meau.
SJD/JJAdvisory - Sept Fiber Phase Stability Status Steven Durand & Jim Jackson September 8, 2003 National Radio Astronomy Observatory a facility.
EMI in an RQZ: the need for buffer zones Carol Wilson, CSIRO Research Consultant RFI2010, Groningen.
J.Tiberghien - VUB K.Steenhaut & J.Tiberghien - VUB 1 Telecommunications Concepts Chapter 1.5 Communications Media.
Engr Fundamental Ideas.
ANATAC Meeting Line Length Correction Status 2004-Apr-23.
S. Montebugnoli 2 nd SKADS Workshop October 2007 Stelio Montebugnoli IRA - INAF- Italy.
Thomas Berenz, MPIfR Bonn1 RF fiber optics 4 th SKADS Workshop, Lisbon, 2-3 October 2008 RF fiber optics Analog RF transmission with mechanically stressed.
Toby Shoobridge David Benham NERC Space Geodesy Facility Herstmonceux, UK
EMC Evaluation at Green Bank: Emissions and Shield Effectiveness National Radio Astronomy Observatory Carla Beaudet Green Bank RFI Group Leader.
Research of long distance clock distribution system Université Libre de Bruxelles (IIHE) Yifan Yang, Kael Hanson, Aongus Ó Murchadha, Thomas Meures, Michael.
Rosie Bolton SKADS Workshop April 10th 2008 SKADS Costing work: beyond the benchmark scenario Rosie Bolton Paul Alexander, Andy Faulkner and SKADS Costing.
Phase and Gain stability of optical fibre link used in MeerKAT Author : Roufurd Julie Supervised by : Prof Michael Inggs SKA HCD bursary conference Dec.
Review of Positioning in ANTARES Dr. Lee F. Thompson Department of Physics and Astronomy University of Sheffield Special thanks to Vincent Bertin, CPPM.
Calibration of geodetic (dual frequency) GPS receivers Implications for TAI and for the IGS G. Petit.
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
S.Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Stelio Montebugnoli IRA -INAF- Bologna –Italy- SKADS 4th -Lisbon- Oct 2-3, 2008.
DS3-T1 Network Infrastructure & Data Transmission Simon Garrington JBO/Manchester UK Feasibility study of the optical fibre network required to support.
Performance Study of Localization Techniques in Zigbee Wireless Sensor Networks Ray Holguin Electrical Engineering Major Dr. Hong Huang Advisor.
Network Media Guided Media ( transmit the data over a wire)
Roshene McCool1 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Local Oscillator distribution over fibre Roshene McCool SPDO – Signal.
1 SVY 207: Lecture 12 Modes of GPS Positioning Aim of this lecture: –To review and compare methods of static positioning, and introduce methods for kinematic.
Slides for Chapter 3: for CS Only Networking and Internetworking Pages –
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
Data Communication and Networks Chapter 5. What’s a Network? a network consists of two or more computers that are connected together to share information.
1 eVLBI Developments at Jodrell Bank Observatory Ralph Spencer, Richard Hughes- Jones, Simon Casey, Paul Burgess, The University of Manchester.
1) A binary transmission system uses a 8-bit word encoding system. Find the Bandwidth and the SNR dB of the system if the channel capacity is bps.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
RF Phase Reference Distribution for the European XFEL Krzysztof Czuba Warsaw University of Technology, ISE For the RF Synchronization Team P. Jatczak,
Protection of Power Systems
1. Layered Architecture of Communication Networks: Circuit Switching & Packet Switching.
Vladimír Smotlacha, CESNET Alexander Kuna, IPE Time and Frequency Transfer in All-optical Network TNC 2011 Prague 17 May 2011.
Phase Stable Interferometers at Jodrell Bank Ralph Spencer Jodrell Bank Centre for Astrophysics University of Manchester 3rd VLBI Technical Meeting Groningen.
Obtaining e-MERLIN Data For Use With NRAO Legacy Projects Tom Muxlow May 17 th 2006.
An Introduction to Transmission Media
White Rabbit in KM3NeT Mieke Bouwhuis NIKHEF 9th White Rabbit Workshop
Methods of transfer of ultra-stable frequencies to radio telescope
Satellite communication
EVLA Project Peter Napier
IRA – INAF Bologna (I) DS-6 16 September 2018 SKADS Workshop 2006
RADAR -Range and Bearing Discrimination and Accuracy.
EVLA Advisory Committee Meeting System Status
EVLA M/C Software PDR, 14 May 2002
Technical Foundations & Enabling Technologies – DS4
Back End & LO PDR April 2002 FIBRE-OPTIC LINKS -An Introduction Ralph Spencer Jodrell Bank Observatory University of Manchester UK --The use of.
A Draft Funding Model for the SKA
Terrestrial Microwave
Measurements and Their Uncertainty 3.1
ATCA Wideband Continuum Operation
Terrestrial Microwave
Presentation transcript:

Roshene McCool SKADS Workshop 2007 DS3 – T1 Network Infrastructure and Data Transmission Roshene McCool Simon Garrington University of Manchester

Roshene McCool SKADS Workshop 2007 DS3 – T1 Network Infrastructure and Data Transmission U.o.M Objectives 1.Development of a prototype phase transfer system over installed fibre links. 2.Cost model analysis for all aspects of the data network including installation and equipment costs.

Roshene McCool SKADS Workshop 2007 Transfer of Local Oscillator Signals Over Fibre Motivation –Accurate timing signals to all antenna & data processing stations –Like to have transmission over fibre to avoid RFI Specifications –Not specified directly, yet… –Working to ±1 ps over 1 minute (driven by astronomy at high frequencies) and ±10 ps over 10 minutes Other LO over fibre systems –EVLA, 22 km –ATCA, 4.5 km LO over fibre for the SKA & e-MERLIN –Same specifications, similar distances –e-MERLIN, 400km (120km longest unrepeatered hop)

Roshene McCool SKADS Workshop 2007 Adapting a working design for the SKA MERLIN LBL The MERLIN telescope, based at Jodrell Bank, achieves coherent operation using a frequency standard transmitted at MHz. This system is locally known as the ‘L-band Link’ (LBL). The LBL measures the round trip delay to a distant antenna and corrects for half this delay in the correlator. The system assumes reciprocity between the go and return path delays. The current MERLIN LBL works to 1 ps over periods of hours

Roshene McCool SKADS Workshop 2007 Adapting a working design for the SKA LO Over Fibre Plan to use our existing equipment, simply transmit the signal optically, rather over microwave links. Observe if the fibre link is reciprocal over distances up to 120 km Show the current system is no worse than the existing system Show that the system is accurate to 1 ps over 1 minute and 10 ps over 10 minutes

Roshene McCool SKADS Workshop 2007 Experimental set up

Roshene McCool SKADS Workshop 2007 Experimental procedure Data sampled at one second intervals. Measure the one way transmission delay & compare this to, half, the round trip delay. –(Link Delay – Lab Delay = Difference) If the fibre is reciprocal the difference value should be zero. Measure the stability of the difference value over 1 min and 10 minutes. –Take samples of the difference values at 1 minute & 10 minute intervals –Draw a straight line through the points –Calculate the excursion of the measured data from the predicted value based on the straight line between the points

Roshene McCool SKADS Workshop 2007 Results so far…..

Roshene McCool SKADS Workshop 2007 Results so far …..

Roshene McCool SKADS Workshop 2007 Phase transfer - conclusions The stability of the link within a 1 minute and 10 minute timescale is within ±5 ps. This means the LO over fibre is in spec on the 10 minute timescale. The experimental error does not allow measurements down to 1 ps over 1 minute and therefore we need further work to obtain measurements at that accuracy. The 110 km fibre link works as well as a link with no fibre at all in both cases.

Roshene McCool SKADS Workshop 2007 SKADs Costing Exercise Asked to look at costing for the communications sections of the SKADs design. –Assumed 8.6 Tbits/s per station. –Assumed the use of lasers mounted on custom built DSP boards and transmission over a private fibre network. –Not restricted to the use of commercial protocols and equipment. –Used detailed cable installation & test cost analysis commissioned for the ALMA project (€ 45/km) –Civils costs included separately

Roshene McCool SKADS Workshop 2007 SKADs Costing Exercise - Conclusions Costing model shows communication costs are estimated at €155 Million, 8% of the total SKADs design. –(Much greater if links > 480km are included) For the costing model data links were restricted to 480km. –Further work is required to assess the best way to build links at longer distances. –Illustrated the need for compromises on bandwidths at long distances. Next steps –More optimisation of design solution required –Maintain a watching brief on technology solutions.

Roshene McCool SKADS Workshop 2007 Questions