Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.

Slides:



Advertisements
Similar presentations
24-Apr-15S.Movchan Straw prototype beam test into the NA48 infrastructure 1 Goals: test of straw prototype wires positioning straw bending check grounding.
Advertisements

Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 16 September 2003 What’s new since Cornell…
1 Apr. 28, 2007 Test of the Pulse Height and Time Jitter for the IHEP Full-Size RPC’s with 8-m-Long Readout Strip Planes C. Lu, K. McDonald and W. Sands.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
Ivan Vitev & E906 Muon Identifier Status Patrick McGaughey and the muon radiography team E866 Meeting at FNAL June 20-21, 2007 Large Muon Tracker at LANSCE.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
GEM detector development at VECC Anand Dubey. 2-GEM detector tested with source symmetric mode of biasing scheme, (i.e. same voltage across both the GEMS)
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Prototypes of high rate MRPC for CBM TOF Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China RPC-2010-Darmstadt, Germany.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
CMS-GRPC status Imad Laktineh for the GRPC-CMS groups.
1 New TOT design for the LAV F.E. electronics M. Raggi, P. Valente G. Corradi, D. Tagnani LNF electronic service TDAQ Working Group 29/05/2009.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
First Results from the NA62 Straw Spectrometer E uropean P hysical S ociety 2015, Wien Vito Palladino - CERN On Behalf of NA62 Collaboration.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
RPC Timing Results with Final Splitters Gianpaolo Carlino INFN Napoli The Napoli RPC Group: M.Alviggi, V. Canale, M. Caprio, G.C., R. de Asmundis, M. Della.
Test beam preliminary results D. Di Filippo, P. Massarotti, T. Spadaro.
Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
To measure 0, mechanical oscillations of the wire to be tested are induced by applying a periodic high voltage (about 900 V) with a frequency of 300 ÷
M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
LAV status report for the NA62 LAV working group Preliminary test beam results Future activities Progress on simulation A. Antonelli INFN-LNF SPSC meeting.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Test on installed RPCs with the gas mixture. Preliminary results. Alessandro Paoloni on behalf of the OPERA RPC Group (Bologna, LNF, LNGS, Napoli, Padova,
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Quality Assurance procedures for the construction of ALICE TOF detector VIIIth Workshop on Resistive Plate Chambers and Related Detectors October.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
A. Calcaterra, R. de Sangro, G. Felici, G. Finocchiaro, P. Patteri, M. Piccolo INFN LNF XIV SuperB General Meeting DCH-I parallel session LNF, 27 September.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
Results achieved so far to improve the RPC rate capability
A proposal to equip the high eta muon stations with High Rate GRPC
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
The Beam Test at Fermilab:
Gaseous Beam Position Detectors, with Low Cost and Low Material Budget
Results from a preliminary analysis of the MWPC test at the GIF
Pre-installation Tests of the LHCb Muon Chambers
Presentation transcript:

Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group

Davide Pinci Outline At the end of the construction process we plan to perform a quality control of the Multi-Wire Proportional Chambers. For this purpose we built: A table to investigate the gain and its space uniformity by means of a radioactive source of each gap of the chamber; A cosmic ray station to study the chamber total efficiency and time performance; The large number of chambers produced demands: Fast and automated test setup fully controlled by PC; Organized data storing;

Davide Pinci Test with the radioactive source The measure of the gain of each chamber gap is performed by means of a radioactive source; It results to be a very usefull test: Th chamber can be tested whitout front-end electronics; The measurement is very fast: the whole chamber can be checked in less than 1 hour; The gain uniformity provides important information on the quality of each gap: gap thickness, wire spacing, electrical connections, gas flow uniformity; The gain absolute value provides information on: uniformity between the different chamber gaps; uniformity in the chamber production (once corrected for the room temperature and pressure variations);

Davide Pinci System set-up We use a 137 Cs source; The current drawn by each gap is measured by a nano-amperometer built in Frascati, providing 1 nA of resolution; The source activity is about 40 mCi which means a production of about ,662 MeV photons/s over 4  (about over a 24° cone); With the nominal chamber gain ( ) a current of about 70 nA is expected; The source is shielded in a lead case which insures a dose rate lower than 0.5  1 m far from the source. 137 Cs source Lead case

Davide Pinci The measurement table Two stepping motors control the source movement in the two directions; The motors are fully controlled by PC via an I/O National Instrument board (6025E) and a driver; The position precision is about 0.5 mm for both axes.

Davide Pinci Gain uniformity requirements The main requirements on the gain uiformity are related to the working point. Quoting the EDR: “If G 0 is the nominal gas gain, we want the gas gain in 95% of the area of a single gap to be within G 0 /1.25 and G 0 *1.25 i. e. between 0.8G 0 and 1.25G 0. The remaining 5% of the area should have a gain within a factor 1.5 i.e. between 0.67G 0 and 1.5G 0 ” Since the gain double each 106V, this requirements allows to have almost the entire chamber efficient by working 50 V (30% of the gain) above the nominal value of 2530 V: HV = 2580V 2530 V

Davide Pinci Chamber C001

Davide Pinci Chamber C002

Davide Pinci Comments Chamber 01: For the 4 gaps: 93->99 % of the gap area in the required range; Chamber 02: The gaps 2, 3 and 4 show very good gain uniformity: 96 ->99% of the gap area in the required range; gain distribution r.m.s. resulted about 10% of the average values; The gap 1 shows two different gain regions; It can be due to a not perfect panel planarity. Nevertheless the 76% of the area is within the required range and the 90% is in the range 1/1.30 and 1.30; The gain distribution r.m.s. resulted to be the 18% of the average gain value. All the 4 gaps have 100% of the area in the range 1/1.50 and 1.50.

Davide Pinci We plan to study MWPC efficiency, time performance and cross-talk; 6 MWPC layers are tested at the same time in order to shorten test duration and to perform muon tracking; With this set-up the chamber edge performance measurement will be the most time consuming; The cosmic ray test station Lead layer for shower veto Trigger is given by 3 scintillators with double read-out: a total efficiency of 90% and a time resolution of ~1.8 ns were measured.  100  400 PM

Davide Pinci Test performance We plan to investigate the performance of each physical channel; MWPC will be equipped with a readout circuitry: ASDQ or Carioca We made some simulations to evaluate the time needed: Test time is expected to be less than required by the MWPC production rate; Number of channels input into a multi-hit 128 ch TDC (CAEN V767) reduced via dedicated circuitry: multiplexing boards to reduce cost.

Davide Pinci Channel multiplexing To multiplex many channels from the MWPC FEB into a reduced number of TDC channels, groups of FE channels are delayed as shown in figure.  t needs to be larger than the MWPC time resolution in order to prevent a biased measurement. Channel group 1 tt tt tt tt tt tt tt tt tt tt Ch2Ch2 Ch4Ch4 Ch5Ch5 Ch3Ch3 Implementation is on an FPGA. Signal lines can be propagated through long cascades of gates used as delay lines;  t can be selected in the range ns; Lab measurements show jitter values below 400ps over the allowed voltage and temperature operating ranges.

Davide Pinci Muon station set-up situation The station mechanics drawing and materials are ready and the station construction is foreseen by the end of december; Scintillators, PMs and electronics for data acquisition are set-up; DAQ system (Labview based) already written and working in Roma1 university; Plan to debug the whole system (without Mux) by testing some MWPC prototypes as soon as the mechanics is ready; The MUX: All the material and components are in Roma1 The electronics drawings are ready and the board layout is arriving The whole system should be working by the end of Feb 04 In the meantime we plan to test the chambers by using more than one single TDC.

Davide Pinci Time, manpower and conclusions Radioactive source test: The whole system (gas, HV, source-positioning, current readout) is working properly; 1 hour and 1 person is needed 2/3 times per week for the test; Cosmic-ray stand: Now: Trigger and data acquisition are ready in Roma1; Dec 03: debug (in Roma1) with some MWPC prototype; Jan 04: set-up in Frascati and start of tests with a preliminary version (without Mux); Feb 04: Mux arrive and cosmic stand up-grade; 1 person needed fulltime.