1 PST Heaters 4 panels per segment along pixel support tube. Each segment is 236mm long at the moment. Copper-on-kapton. Nominal 20 ohms per full panel.

Slides:



Advertisements
Similar presentations
1 Service panels run from detector end to end of support tube X-section through service panels 3-D view of panels PP0 region. All services break here Patch.
Advertisements

Magnetic fields R&D update B. PlasternEDM November 2007 Collaboration Meeting Results from prototype studies of a 1/6-scale B 0 coil with Results from.
EMerge Browser Managed Security Platform Module 2 Hardware install.
M. Gilchriese SQP Clearance June 8, M. Gilchriese 2 Overview A1-2 inners have been mounted on backbone An A1-2 outer has been mounted on the backbone.
Diesel Generator Reliability: Lessons Learned from Storms
TJ Sulliv an Matt Salazar Curt Watson Team Members.
1 MICE hydrogen system layout. 2 MICE hydrogen system layout (2)
Keep Control: PULPO 2 ESO‘s new housekeeping unit Christoph Geimer, Claudio Cumani, Nicolas Haddad, Javier Reyes, Javier Valenzuela, Bernhard Lopez PULPO.
Science Specification Table 12 keV keV for neutral particles 40.5 cm 2 image plane Electronic Noise 3 keV FWHM Proton Dead Layer
HFT Geometry Considerations F.Videbæk BNL. Introduction This presentation is meant to be a living document, updated as more and better information becomes.
Midterm Review MBS 2006 MP Electronics, Basic Concept  Two modules:  Probe module  Surface module  The surface module is replaced by the.
FAZIA DAYS, Bologna 10-12/feb/2010, WG8, Emanuele Vanzanella (mechanics & cooling), Alfonso Boiano (electronics) ELECTRONICS HOLDER & COOLING SYSTEM Side.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
FEBRUARY 2003 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Support Tube PRR: Parts Pixel Support Tube Production Readiness Review Parts Overview Alexis.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
EXAMPLE 27.1: A copper wire carries a current of 10 A. It has a cross- sectional area of 0.05 cm 2. Estimate the drift velocity of the electrons.
Jack Fowler Spain Workshop 2003 Faraday Shielding for Barrel TRT Jack Fowler Duke University Spain Workshop
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
SEPTEMBER 2002 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Detector Heater Panel Testing Alexis Smith September 17, 2002.
Walks, Paths and Circuits. A graph is a connected graph if it is possible to travel from one vertex to any other vertex by moving along successive edges.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Direct Hot Water. What Cold Water System is Pictured? What hot Water System is Pictured?
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
1 PST Heaters – Proposed Segmentation Forward = 2289mm. 6 hoops. 10 heaters Barrel = 1606mm. 4 hoops. 7 heaters.
ATLAS Pixel Detector Pixel Support Tube Interfaces Pixel Support Tube PRR CERN, Geneve E. Anderssen, LBNL.
Report on dummy detector Equipped with Heater & sensors NA62 GigaTracker Working Group Meeting May 24 th 2011.
NETWORKING MEDIA b Shielded twisted-pair - 2 pair, 150 ohm b unshielded-twisted pair - 4 pair, 100 ohm b fiber optic cable - 2 fibers b coaxial cable -
Physics 12 Mr. Jean November 17 th, The plan: Video clip of the day Van de Graff Generator Notes on field lines which were missed Electric Circuits.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
Dan Cheng, Xiaorong Wang 12/15/2015 MQXFA Connectors Discussion Part II.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
ATLAS 1 Beam Pipe Support SCT TRT Side CSide A Services and Beampipe Support Frame Services and Beampipe Support Frame Pixel Detector Composite support.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
Feedback on transfer line sizing and flow calculations for UT
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
LARP Phase II Secondary Collimator RC1
Christian Veelken last updated 11/09/06
Pixel cooling specifications
Tracker cooling loop “check out” draft for discussion
Sensor Wafer: Final Layout
Chamber Design and Integration RE3/1 and RE4/1
Progress at the large scale CO2 system,
First of all we will remind some numbers:
WG4 – Progress report R. Santoro and A. Tauro.
Voltage tap layout and quench antenna options for the long QXF magnet
Detector Technology Group
ATL-IC-ES new version available - approval starts
DET. Integration Inner detector envelope Radial clearances.
November technical stop activities:
Magnetic measurements at ambient temperature on the MQXFBP1
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

1 PST Heaters 4 panels per segment along pixel support tube. Each segment is 236mm long at the moment. Copper-on-kapton. Nominal 20 ohms per full panel. Laminated to 50 micron thick Al for EMI shield. Prototype testing indicated that bottom is coldest region => more redundancy on the bottom is desirable. Wires/segment as on sketch at right Center tap on bottom panel in case of failure on bottom panel (disconnect/reconnect externally to power ½ panel if failure) 2 top panels on adjacent segments are jumpered (except for one segment in barrel section) One segment On PST TOP Normally disconnected Externally

2 Prototype Layout Z IN OUT for Prototype OUT for Production Only for Prototype Center tap for spare connection Prototype PST section is longer than segments would be in production 236mm

3 Prototype Detail

4 Wires and Circuits 7 barrel segments. 2x10 end segments PST heater wires from barrel region 6x8+1x9 = 57. A-side is 3x8+1x9=33. C-side is 24 PST heater wires from end regions 2x10x8=160. A-side is 80 and C-side is 80. Not all wires are always connected. Barrel circuits(power supplies) = 25. End region circuits = 2 x 35 = 70 4 additional circuits to heat mounts to SCT Temperature sensor per panel=> 108 sensors + 4 for mount heaters. Total heater wires = = 225 Total circuits(power supply channels) = 99 Total temperature sensors = 112 => 224 wires