EURAILSPEED MILANO 2005.

Slides:



Advertisements
Similar presentations
Smart interconnections and urban growth – the Polish case* Tomasz Komornicki Institute of Geography and Spatial Organization Polish Academy of Sciences.
Advertisements

Poland My country Poland is a country in Central Europe Hi! My names Caroline. Welcome to a tour around Poland.
1 PKP Polish Railway Lines investment plans >> Creating a World Class Rail Network
Intermodality between air and railway passenger transport in Poland: present situation and perspectives Marcin Wolek Ph. D. Department of Transportation.
Geneva, 26 March 2010 The system SUW an opportunity for railway networks having different track gauges First session of the informal UNECE Expert.
L’Infra, une activité au cœur de la SNCF INFRASTRUCTURE French Highspeed on South East TGV line: 25 years of evolution Jean-Paul BALENSI Vice-president.
1 THE TUNISIAN NATIONAL RAILWAYS COMPANY. 2 SNCFT is the national railway of Tunisia and is under the direction of the Ministry of Transport. SNCFT was.
IRSC DUBLIN OCTOBER 2006 vue n°1 INTERNATIONAL RAILWAY SAFETY CONFERENCE Dublin 23 – 25 october 2006 CIRCULATION OF TRAM-TRAINS ON THE FRENCH NATIONAL.
Kosovo Ministry of Transport & Communications Department of Railways, Civil Aviation and Maritime Transport Pristina, June 2004.
Meeting AECOM, AM SOP-T, CFR, JASPERS
Ryszard Warzocha President of the Board PORT SZCZECIN-ŚWINOUJŚCIE Gate for Czech Republic adapted to the transport trends Szczecin and Świnoujscie SeaportsAuthority.
Elektrizace železnic Praha a.s. Supplier of OCL and electrotechnological units for railways and urban mass transportation EFRTC General meeting, ,
Access to Intermodal Supply Chain Networks
PROJECT SUPPORTED BY A GRANT FROM SWITZERLAND THROUGH THE SWISS CONTRIBUTION TO THE ENLARGED EUROPEAN UNION Signing of the Agreement concerning.
LOG 470 Contemporary Issues in Logistics
Rail Baltica RETURN TO EUROPE IN NEW QUALITY
Certification of railway equipment. JSC VNIIZhT Test Centre Speakers: Alexandr Savin Eduard Gunchenko 17 October 2012 VNIIZhT (JSC Railway Research Institute)
Russian Railway Transport Research Institute (VNIIZhT) Energy strategy for rail transport: an efficient tool for managing energy savings Alexander KOSAREV.
Transport presentation October An integrated railway solutions provider Sales 4.9 B Euros Orders received 4.7 B Euros Employees Market Share.
TRACECA PROJECT EVALUATION. Mark the location of the project on the map with a plain, black line or dot. Constanta – Vama Veche Motorway section.
Background Research on High Speed Rail Kumar and Wencan.
HS2 A National Strategy for High Speed Rail Prof Andrew McNaughton.
1CER The Voice of European Railways High Speed Railway – a chance for Poland and Central Europe EU Regulatory Framework Warszawa, 16 November 2011 Libor.
Imagine the result European Infrastructure Friedrich Schneider, Executive Board Member August 4, 2010.
INVESTMENT PROJECT PROPOSAL Construction of the railway line Marculesti-Soroca, and the bridge over the Nistru river Construction of the railway line Marculesti-Soroca,
ETCS Level 2 Operational Concept in Austria
I N S T R U M E N T E S T R U C T U R A L E I N R O M A N I A Building the project base – working in partnership Michał Olszewski Deputy Director CSF Managing.
WP5.5. Railway solutions for the North-South and East-West flows Project Part-financed by the European Union Leszek Andrzejewski ILIM contribution WP5.5.
UNECE WP on Transport Trends and Economics Geneva, 15 September 2006 Activities on Pan European Transport Corridor VI Marian HANTAK TEM Project Central.
First Regional Conference Energy Efficiency of Railways in terms of Sustainable Development November Belgrade, Serbia Mr. Saša Živković, B.Sc.Eng.
Rail Investments in the new Member States Overview of the situation and debriefing on UNIFE activities Michael Clausecker UNIFE Director-General Appendix.
PUBLIC TRANSPORT IN LATVIA: STRUCTURE AND FINANCING ANNIJA NOVIKOVA D EPUTY D IRECTOR OF R OAD T RANSPORT D EPARTMENT M INISTRY OF T RANSPORT.
1 Program of construction the high speed lines in Poland Warsaw, r.
마스터 부제목 스타일 편집 마스터 제목 스타일 편집 page_0 - Outcome of operation for one year and its vision after Outcome of operation for one year and its vision after.
Metro an urban connection. Background information A metro or rapid transit is an underground train which transports passengers. It is undoubtedly the.
ROUND TABLE 1 DEVELOPING HIGH SPEED NETWORK IN SPAIN Luis de Santiago Pérez Director General of Railways Ministry of Fomento (Spain)
Jerzy Kisilowski, Prof. Full PhD DSc. President of the Steering Team on High Speed Rail (KDP) Transport Committee of the Polish Academy of Sciences.
HŽ Passenger Transport – overviewBUCHAREST HŽ PASSENGER TRANSPORT.
European Commission 1 Directorate General for Energy and Transport Discussion for a co-ordinated trans-European Deployment Plan for ERTMS 15 June 2004.
WCRR 2008, Korea Power KORAIL Power KORAIL 2010 April 2005 Korea Railroad Corporation.
EURAILSPEED - Milano – November 8th, 2005 MGV SNCF Train Set for on-board Measurement at Great Velocity Eric REBEYROTTE– Technical Manager of SNCF Engineering.
Intermodal transport between Germany, Poland and the Czech Republic – Intelligent TEN-T planning Ing. Jindřich Kušnír Department of Railway and Combined.
Improving rail transport competitiveness in the Eurasian region Attila Kiss Executive Secretary Organization for Co-operation of Railways (OSJD)
Transport ERTMS on the EU core network by 2015, 2020, 2030 strategic (pragmatic) approach UIC conference 2014 I. Vandoorne.
EMTA General Meeting , Turin Tamas Dombi, ZTM Warsaw1 Actual Problems of the Public Transport in Warsaw Metropolitan Area.
SEETO Comprehensive Rail Network Development
28th November 2008, Brussels1 Railway Infrastructure Administration, state organization EFRTC General Assembly 28th November 2008Brussels, Belgium Infrastructure.
Priorities in the sector “Transport”
ХVII Meeting of the Monitoring Committee of Operational programme “Transport” November 2014 г. Pravets.
QR’s EXPERIENCE WITH NARROW GAUGE TILT TRAINS
1 Impacts of the growing motorization on the transport of the Warsaw metropolitan area Tamás Dombi, ZTM Warsaw.
UIC ERTMS Conference - Budapest 4 th -6 th April 2006 STRATEGY AND EXPERIENCES OF THE ERTMS DEPLOYMENT IN SPAIN Antonio Domínguez Chala ADIF.
SKM Warsaw – a communal train Piotr Izdebski ZTM Transport and Economic Growth – An International Perspective Birmingham, 11th November 2011.
Click to end  Złotów is a town in northern Wielkopolska in Poland with a population of 18,303 inhabitants (2011). It is today part of Wielkopolska Province.
The role of the railway infrastructure in transport on the Baltic - Adriatic axis Maria Perkuszewska, Vienna, 17th of September 2014.
Polish Information and Foreign Investment Agency PL Warsaw, 12 Bagatela Street, phone: (+48 22) , fax: (+48 22) ;
Investment opportunities in public infrastructure
Railway Rolling Stock 铁工 1303 班 组员 : 蒋奔 ( 组长 ) ,胡君雅,简雪昂 资料收集:简雪昂 版面设计 : 胡君雅 制作:蒋奔.
Beyond the Crossroads James Stem National Legislative Director United Transportation Union May 27, 2009.
High speed railways in Poland – a political playground or a real need? The advisability of constructing a HSL system in a medium-sized country in Central.
PKP Energetyka S.A. – Projects. QUALITY, SAFETY, COMMITMENT, EFFICIENCY Documents Schedule Scope Structure Risk Targets Questions.
High Speed Rail Some Development Principles
Public Conference December
The SEESARI initiative – “From vision to action“
Vice President: Lin Zhonghong Economic & Planning Research Institute
Procurement at Lithuanian Railways
Department of Transportation Market
JSC “UKRAINIAN RAILWAY” (UZ) DEVELOPMENT STRATEGY FOR
Poland on the crossroads of transcontinental transport routes in the middle of Europe MINISTRY OF TRANSPORT OF THE REPUBLIC OF POLAND Warsaw, June 2007.
Jurij C. Kofner Research assistant, Advanced Systems Analysis Program
Presentation transcript:

EURAILSPEED MILANO 2005

Polish Railway Lines – modernization of existing international railway corridors and construction of high speed lines Tadeusz Augustowski President of Executive Board of PKP Polish Railway Lines

Map of railway net in Poland – impression of the size and density of the net.

Map of the international transit lines as the long term strategic program of Polish railway lines investments.

The highest priority for High Speed Lines in Poland To build the net between centers of the biggest metropolitan areas to connect them with highest quality standard passengers’ railway transport To provide the connection of the Polish HSL to neighboring countries HS Lines

Polish railway net with centers of biggest metropolitan areas and main railway connecting directions

Development of High Speed Lines in Poland Sections planned to be ready in year 2015 1/ Grodzisk Mazowiecki – Psary (Central Main Line = Centralna Magistrala Kolejowa) V= 200 km/h for conventional engine with coaches V= 250 km/h for HS rolling stock (multiple units) The length of the section: 170 km,catenary – DC 3 kV 2/ Wrocław – Kalisz V=200-250 or V≥300 km/h (depends on results of the pre-feasibility study) The length of the section: 110 km Catenary – accordingly to results of pre-feasibility study: - for rolling stock for V= 200-250 km/h - DC 3kV - for rolling stock for V≥300 km/h - AC 25kV, 50Hz

Development of High Speed Lines in Poland Sections planned to be built after year 2015 1/ Kalisz – Łódź, Length 110 km 2/ Łódź – Warszawa, Length 130 km 3/ Kalisz – Poznań, Length 140 km 4/ Łódź – Piotrków Trybunalski - CMK Length 80 km 5/ Poznań – German Border Length 170 km Accordingly to results of pre-feasibility study: - if assumed maxV=200-250 – catenary DC 3kV - if assumed maxV≥300 km/h – catenary AC 25kV, 50Hz

Map of the planned system of HS lines in Poland

Some comments Line Grodzisk Mazowiecki – Psary (called CMK) was built in 1970-75 with alignment for 250 km/h, but equipped for HS is in years 1998-2013 Line Warsaw – Gdynia – will be modernized in 2007-2013 for V=160 km/h for conventional trains and for 200 km/h for tilting trains Line Poznań – German Border – which is going to be built as completely new, will need 100% of new land Other lines –for speed of 200-250 or 300 and more km/h will be built as new lines, but using in 30-50% the land of old rail lines

The planned system of HS lines in Poland with the surrounding conventional lines modernized to V=160 km/h (forecast for year 2030)

Thank You for the attention !