Status of the Monte-Carlo work Alexander Kiselev 09.08.2014 EIC Tracking Meeting.

Slides:



Advertisements
Similar presentations
LDC strip angle optimization SiLC Genf, Sept. 10, 2007M. Regler, M. Valentan, W. Mitaroff Optimization of the strip angles of the LDC endcaps using the.
Advertisements

Studies for a silicon detector in a e/A collider Benedetto Di Ruzza BNL EIC Task Force meeting August 28 th 2014.
1 Simulation Status/Plans Malcolm Ellis Sci Fi Tracker Meeting Imperial College, 10 th September 2004.
Background effect to Vertex Detector and Impact parameter resolution T. Fujikawa(Tohoku Univ.) Feb LC Detector Meeting.
HERMES tracking for OLYMPUS. Part #1. Detector survey. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
LCFI physics studies meeting, 28 th June 05 Sonja Hillertp. 1 Report from ILC simulation workshop, DESY June Aim of workshop: preparation for Snowmass;
1 Scintillating Fibre Tracker Simulation Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
Simulation / Reconstruction Working group Toby Burnett University of Washington Jan 2000 T.
1 Forward Tracking Simulation Norman A. Graf ALCPG Cornell July 15, 2003.
Tracking Efficiency and Momentum Resolution Analysis Chris Meyer UCSC ILC Simulation Reconstruction Meeting March 13, 2007.
Algorithms and Methods for Particle Identification with ALICE TOF Detector at Very High Particle Multiplicity TOF simulation group B.Zagreev ACAT2002,
Monte-Carlo simulations and reconstruction for 12-degree ep-elastic Luminosity Monitor A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Simulation / Reconstruction Working group Toby Burnett University of Washington 11 Jan 2000 T.
KM3NeT detector optimization with HOU simulation and reconstruction software A. G. Tsirigotis In the framework of the KM3NeT Design Study WP2 - Paris,
1 CMS Tracker Alignment and Implications for Physics Performance Nhan Tran Johns Hopkins University CMS Collaboration SPLIT
Silicon Detector: Simulation & Reconstruction Norman Graf SiD Advisory Meeting September 14, 2009.
Detector simulations for EIC at BNL Alexander Kiselev POETIC Workshop Sep,
The LiC Detector Toy M. Valentan, M. Regler, R. Frühwirth Austrian Academy of Sciences Institute of High Energy Physics, Vienna InputSimulation ReconstructionOutput.
A. Kiselev BNL, 06/20/2013 EicRoot status report and calorimeter code development.
Beam Test Results for a Large-area GEM Detector Read Out with Radial Zigzag Strips Aiwu Zhang, V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger Dept. of.
Measurement of through-going particle momentum by means of Multiple Scattering with the T600 TPC Talk given by Antonio Jesús Melgarejo (Universidad de.
Report of the HOU contribution to KM3NeT TDR (WP2) A. G. Tsirigotis In the framework of the KM3NeT Design Study WP2 Meeting - Marseilles, 29June-3 July.
ITS Alignment: Millepede Results S. Moretto, C. Bombonati, A. Dainese, M. Lunardon, A. Rossi.
GlueX Software Status April 28, 2006 David Lawrence, JLab.
David N. Brown Lawrence Berkeley National Lab Representing the BaBar Collaboration The BaBar Mini  BaBar  BaBar’s Data Formats  Design of the Mini 
Report of the HOU contribution to KM3NeT TDR (WP2) A. G. Tsirigotis In the framework of the KM3NeT Design Study WP2 Meeting - Erlangen, May 2009.
STAR Sti, main features V. Perevoztchikov Brookhaven National Laboratory,USA.
Marco Delmastro 23/02/2006 Status of LAr EM performance andmeasurements fro CTB1 Status of LAr EM performance and measurements for CTB Overview Data -
Impact parameter resolution study for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
FNAL beam test G4 simulation update Aiwu Zhang
N. Saoulidou Fermilab 1 Status & Update of track reconstruction in the Near Detector N. Saoulidou, Fermilab
Simulation and Analysis of VTX03 and Upgrades to LASS Ryan Page.
STAR Kalman Track Fit V. Perevoztchikov Brookhaven National Laboratory,USA.
LCWS 06 Bangalore, India, March Track fitting using weight matrix Nick Sinev, University of Oregon.
Momentum resolution study of LDC 6 th SiLC meeting, Torino, Dec M. Regler, M. Valentan Interplay of TPC and SET: influence on the momentum.
New LDC optimization studies... ILD Workshop, DESY-Zeuthen, 14–16 Jan M. Regler, M. Valentan presented by W. Mitaroff New LDC optimization studies.
7 May 2009Paul Dauncey1 Tracker alignment issues Paul Dauncey.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
Status of BESIII Event Reconstruction System Zepu Mao IHEP BESIII Annual Meeting 2005/05/29.
25/06/2014A. Dobbs, Tracker Software: How To2 25/06/2014A. Dobbs, Tracker Software: How To3.
05/04/06Predrag Krstonosic - Cambridge True particle flow and performance of recent particle flow algorithms.
Using Kalman Filter to Track Particles Saša Fratina advisor: Samo Korpar
13-jan-2014 Some results for a GEM-based central detector A.Zinchenko, V.Vasendina, M.Kapishin VBLHEP, JINR, Dubna, Russia.
By: Aaron Dyreson Supervising Professor: Dr. Ioannis Schizas
CMS Torino meeting, 4 th June, 2007 R. Castello on behalf of Torino Tracker’s group Tracker Alignment with MillePede.
FNAL beam test simulation with Geant Aiwu Zhang Florida Tech
A track fitting method for multiple scattering Peter Kvasnička, 5th SILC meeting, Prague 2007.
SIlicon VErtex TrAcker Rather than fixed common geometry the common analysis and simulation tools are needed. Such software package should provide : 
TeV muons: from data handling to new physics phenomena Vladimir Palichik JINR, Dubna NEC’2009 Varna, September 07-14, 2009.
STAR Simulation. Status and plans V. Perevoztchikov Brookhaven National Laboratory,USA.
Impact Parameter Resolution Measurements from 900 GeV LHC DATA Boris Mangano & Ryan Kelley (UCSD)
SiD Tracking in the LOI and Future Plans Richard Partridge SLAC ALCPG 2009.
1 Status of Tracker Alignment b-tagging Workshop Nhan Tran (JHU) On behalf of the Tracker Alignment Group.
1 Reconstruction tasks R.Shahoyan, 25/06/ Including TRD into track fit (JIRA PWGPP-1))  JIRA PWGPP-2: Code is in the release, need to switch setting.
M. Ellis - MICE Collaboration Meeting - Wednesday 27th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
BeAST Detector (Brookhaven eA Solenoidal Tracker) Alexander Kiselev for the BNL EIC taskforce Berkeley EIC User Group Meeting Jan’2016.
BES III Software: Beta Release Plan Weidong Li 19 th October 2005.
Outline: - Building the reconstruction software template - Data flow example - What’s next? - Example “results” PHENIX Upgrade Detectors: Reconstruction.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
LDC behavior at θ ≤ 20° ALCPG '07, Fermilab, Oct M. Regler, M. Valentan presented by W. Mitaroff LDC behavior of ∆(1/p t ) at polar angle θ.
GenFit and RAVE in sPHENIX under Fun4All
Yet another approach to the ToF-based PID at PANDA
EicRoot: a brief overview
M. Kuhn, P. Hopchev, M. Ferro-Luzzi
Measurement of track length and time-of-flight hypothesis
Generic R&D for an EIC: Developing Analysis Tools and Techniques for the EIC Whitney Armstrong (ANL), Elke-Caroline Aschenauer (BNL), Franco Bradamante.
Linear Collider Simulation Tools
Hellenic Open University
Special Considerations for SIDIS
Background Concept Results Conclusions
Presentation transcript:

Status of the Monte-Carlo work Alexander Kiselev EIC Tracking Meeting

Sep,8 2014A.Kiselev GEM geometry in EicRoot  Basic C++ classes and geometry creation scripts are coded and available  Internal structure:  Calculations by Aiwu  Input from Kondo 2/8  Very flexible configuration  Applicable to both FLYSUB and EIC detector

Sep,8 2014A.Kiselev Application to FLYSUB -> pretty detailed geometry description 3/8 EicRoot display

Sep,8 2014A.Kiselev GEM geometry in the EIC detector 4/8 -> same FLYSUB building blocks

Sep,8 2014A.Kiselev Tracking sandbox in EicRoot 5/8 TRK2 TRK1 TRK4 TRK3 SBS2 UVA1 -> sufficient to pin down material effects  So far: simplified geometry with realistic material description  Kalman filter code ported from HERMES is used

Sep,8 2014A.Kiselev Example: global linear fit  Simulate 32 GeV protons  Reconstruct as 3.2 TeV ones (equivalent to global linear fit)  Use all TRK & SBS for track fit; try several different resolution values  Build UVA residuals under assumption of 1 micron resolution 6/8 -> a clear mismatch between linear fit estimate and “true” resolution

Sep,8 2014A.Kiselev Example: same with the Kalman filter  Numerical estimate from the previous page:  if measured UVA residual say for 70 micron TRK&SBS trackers was ~90 microns, the conclusion from global fit would be, that UVA internal resolution is ~85 microns, while in fact it was ~70 microns (and just the global fit error estimate was underestimated) 7/8 -> Kalman filter fit does not suffer from this problem Kalman filter fit

Sep,8 2014A.Kiselev Timelines, plans, etc  Next one-two weeks:  Finalize FLYSUB geometry description (rotated strips, etc)  Conclude FLYSUB material effects study  Right after that:  Fix EIC tracker geometry for the first physics MC production  More distant future:  Include other FLYSUB detectors (vector measurements; 3D rotations)  ? Hook up FLYSUB data to the simulation framework 8/8