Bottom half – ch 0-5 placed & routed FE PS PROC FIFO TRIG OSC RX/SHAP ADC DAC VME.

Slides:



Advertisements
Similar presentations
Pixel Chip Testing S. Easo, RAL Current Status of the Pixel Chip Testing. Plans for an LHCb Test Setup at CERN.
Advertisements

JLab High Resolution TDC Hall D Electronics Review (7/03) - Ed Jastrzembski.
On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
A scalable DAQ system using the DRS4 sampling chip H.Friederich 1, G.Davatz 1, U.Hartmann 2, A.Howard 1, H.Meyer 1, D.Murer 1, S.Ritt 2, N.Schlumpf 2 1.
Concept Generation and Evaluation MSD Project Multi Camera System.
Cryo and AFE IIt Update MICE Collaboration Meeting October 22, 2005 RAL A. Bross.
Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
Mind Board Company Profile Company Profile. Meets the challenge of Meets the challenge of creating complex designs PCB DESIGN CENTER.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
9th October 2008AIDA FEE progress report P.J.Coleman-Smith 1 AIDA Frontend Electronics progress report. Mezzanine to FEE64 connection. Mezzanine Layout.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Part A Presentation High Speed Digital Signal Lab Students: Lotem Sharon Yuval Sela Instructor : Ina Rivkin.
A 72 Channel 125 MSPS Analog-to-Digital Converter Module for Drift Chamber Readout for the GlueX Detector G. Visser 1, D. Abbot 2, F. Barbosa 2, C. Cuevas.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
PCB Presentation Group 6 – String Us Up! Matthew Barton Clifford Risley Patrick Nice Seth “Schematic” George.
FEE Electronics progress Mezzanine manufacture progress FEE64 testing and VHDL progress Test mezzanine. Trial mechanical assembly 10th November 2009.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
General Purposes Input/ Output Daughter board for Univ Eval Rev B Julien Cercillieux University of Hawaii
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
SPD Control Board 16th February SPD Control Board (VFE control and SPD multiplicity) VFE’s control (I2C communication: SDA,SCL; clock; reset/trigger.
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
Local Trigger Unit for NA62 Marián Krivda 1), Cristina Lazzeroni 1), Vlado Černý 2), Tomáš Blažek 2), Roman Lietava 1)2) 1) University of Birmingham, UK.
CSC Endcap Muon Sorter Mezzanine Board Rice University July 4, 2014.
Module Development Plan I believe that we are ready to proceed to a program to demonstrate a PS module based on “2.5 D” interconnections. This is based.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixtures FEE64 commissioning A few of the remaining tasks 16th July 2009.
Alexei SemenovGeneric Digitizer Generic Digitizer 10MHZ 16 bit 6U VME Board.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
24/03/2010 TDAQ WG - CERN 1 LKr L0 trigger status report V. Bonaiuto, G. Carboni, L. Cesaroni, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
PSI - 11 Feb The Trigger System of the MEG Experiment Marco Grassi INFN - Pisa On behalf of D. Nicolò F. Morsani S. Galeotti.
PROGRESS ON ENERGY SUM ELECTRONIC BOARD. VXS Backplane Energy Sum 18 fADC VME64 High Speed Serial VME64 16 CH Detector Signals Crate Sum to Trigger Energy.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Domino Ring Sampler (DRS) Readout Shift Register
Four Channel Portable Electronics Rubén Conde*, Humberto Salazar*, Oscar Martínez* and L. Villaseñor ** * Facultad de Ciencias FisicoMatematicas, BUAP,
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
OPERA TT MEETING BRUSSELS, April 11, 2003 Status of the OPERA DAQ Status of the OPERA DAQ D.Autiero, J.Marteau T.Descombes  informatics S.Gardien, C.Girerd,
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
FEC electronicsRD-51 mini week, CERN, Sept Towards the scalable readout system: FEC electronics for APV25, AFTER and Timepix J.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
Agata Week – LNL 14 November 2007 LLP ATCA Carrier Status M. Bellato on behalf of the LLP Carrier Working Group.
PSI - 11 Feb Status of the electronic systems of the MEG Experiment.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
TPC electronics Status, Plans, Needs Marcus Larwill April
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
Consideration of the LAr LDPS for the MM Trigger Processor Kenneth Johns University of Arizona Block diagrams and some slides are edited from those of.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
13 June 2006 R. Bonnefoy, C. Carloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M.-L. Mercier, S. Monteil, P. Perret LPC Clermont PS Front-End Electronics.
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
Setup for automated measurements (parametrization) of ASD2 chip
Novosibirsk, September, 2017
Test Boards Design for LTDB
Calorimeter Mu2e Development electronics Front-end Review
Status of the FPGA Firmware of the HF FE
Iwaki System Readout Board User’s Guide
Status of the DHCAL DIF Detector InterFace Board
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
PRODUCTION BOARDS TESTING
FEE Electronics progress
PRODUCTION BOARDS TESTING
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
FEE Electronics progress
BUCKEYE has internal shift register which controls calibration
From Prototype to Production with Eagle PCB Design
Presentation transcript:

Bottom half – ch 0-5 placed & routed FE PS PROC FIFO TRIG OSC RX/SHAP ADC DAC VME

Top half JTAG PS MAIN FE VME FLASH

Remaining board design work Test pulser (sch+layout) Input signal routing (goes around test pulser stuff, do that 1 st ) +1.5V reference (sets ADC input common-mode) A few more connections to define on main/vme FPGA offset DAC control switching regulator phase control status LED’s sub new FET part for RX power supply (prototype ran too hot) pcb mechanical – handle mounts, VXS connector placement thermal vias for ADC chips some bypass caps to be added still local trigger (multiplicity sum line and trigger comparator) +2.5V linear regulator (for VCCAUX & digital signals), Xpower estimate work to check 1 st Then: channel step & repeat copy to mezzanine board flip connectors to bottom for mezzanine board Then: clean silkscreen final DRC review, review, review… fabricate