25 October 2005A. Ciocio - SCTSG1 Type II/III Cables and PP1 Status & Plan.

Slides:



Advertisements
Similar presentations
27 September 2005A.Ciocio - ID Week1 SCT Service Installation Overview Status of Type IV Cable Installation Type II/III Cable Installation Plan for the.
Advertisements

Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009.
Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
Diamonds & R&D on Pigtails Howard Budd Sep
Recently Report LIU Qian. Putting the common end into the moon box We removed this surface of rack when we were installing the common end. We didn’t move.
Bob Howard 10/22/2011.  How many connectors do you need ◦ Max DC/Servo Motor Controllers is 4 so use 4  How long should the connectors be ◦
31 January 2006A.Ciocio - SCTSG1 Type IV cables and PP3 Installation Type IV installation Connector in situ work Status of PP3 Testing.
29 November 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status of Type IV installation Connector in situ work Status of PP3 Testing.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Fiber, Ribbon Production and Cryo Update Alan Bross Tracker Phone October 26, 2006.
The USB Charging Station (TUCS) Basheer and Connor’s Make Project.
14 February 2006A.Ciocio - ID Week1 SCT Services Procurement & Installation Type IV PP3 Type II-III and PP1 Fibres Heaters DCS Testing MTF Workpackage.
25 October 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status & Plan.
ID week - 26 September 2006 A. Ciocio1 SCT Services Installation SCT Cables Web page
Pippa Wells25 October Procurement and manpower for service installation Services readiness dates Planning for type ii/iii Fibre installation dates.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
STFC Technology undulator manufacture and measurement James Rochford On behalf of the Helical collaboration.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
8 June 2006A.Ciocio - SCTSG1 SCT Services Installation Type IV PP3 Type II-III and PP1 Testing & Installation Plan Workpackage
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
14 December 2005A.Ciocio - SCTSG1 Services and Patchpanels Installation Type IV installation Connector in situ work Status of PP3 Type II/III Testing.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
7 March 2006A.Ciocio - SCTSG1 SCT Services and Patch Panels Type IV PP3 Type II-III and PP1 Fibres Heaters DCS Testing Workpackage
9 May 2006A.Ciocio - SCTSG1 SCT Services Installation Type IV PP3 Type II-III and PP1 Fibre Cables DCS Testing & Installation Plan Workpackage
PREPARATIONS TOOLS : 1 、 wire stripper 2 、 coating stripper 3 、 fiber length measurement 4 、 cutter QUICK ASSEMBLY CONNECTOR 1.
SCTSG - 17 October 2006 A. Ciocio1 SCT Services Installation Update Recent Full Report: September ID week SCT Cables Web page:
M. Gilchriese Pixel Update October 3, M. Gilchriese 2 Outline Barrel status and repair strategy Revised ATLAS installation schedule Finishing pixel.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
2003/Nov/16 version #1.Page 1 Aerogel HV cable assembling procedures (for W1-SOUTH-side of 80 Aerogel Boxes) Phenix high-pt PID upgrade team Original version(Oct/11/’03):
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
31 January 2006A.Ciocio - SCTSG1 Type ii-iii and PP1 Production Timescale for installation Plan PP1and Testing.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
LV-HV cable reuse for the Si Tracker Being worked out with S. Wenig.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH July 23rd 2008 VST Meeting1.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
FADC/Hybrid cable production 21 Jan 2015 T. Tsuboyama.
University of Wisconsin
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
ITK Strip Module Meeting; 12st October 2015
Teleconference ACS – FREIA 31st October 2017
Circuits Electrical Wiring.
A 6 mm cable with a length of 15 m has been installed
Status of the PANDA Solenoid Magnet Production in BINP
Teleconference ACS – FREIA 19th June 2017
Presentation transcript:

25 October 2005A. Ciocio - SCTSG1 Type II/III Cables and PP1 Status & Plan

25 October 2005A. Ciocio - SCTSG2 Type II/III Cables Double harness ordered from Ineo Work on splicing started in August (Thurmelec) Installation of connectors on the PP3 end at the factory –Need to provide exact length for both types and PP3 connectors Two Contracts first to produce all the harnesses and then to install the connectors Production of harness started – 175 double harnesses produced (for Barrel) doing Endcap now Cables with PP3 connectors 3 weeks around – between December and March

25 October 2005A. Ciocio - SCTSG3 Cont’d Testing –Use dummy PP1 with some load to test that the splice didn’t get damaged after installation –JST and FCI connectors very delicate – better to test at the PP3 end Splice is verified at the company Need QA going on regularly during production (Saverio D’Auria just joined) –Previous visits by Pepe B. Maarit W. and Laurent Gillain(CERN purchasing) quite satisfactory – mostly looking at the splicing – –Recent visit (Pepe, Maarit, Saverio) mostly on strip back length

25 October 2005A. Ciocio - SCTSG4 PP1 Test of first 5 samples (double harness) show a problem with keeping JST and FCI connectors in place and lack of consistency in the difference between the 2 strips back lengths Requirement of 2mm difference in strip back lengths of the power lines and thinner lines (JST – extra length – confirmed by David) Pepe, Maarit and Saverio visited Thermelec last week and discussed this issue Company agreed to respect a minimum and will try to keep it between 0 and 2mm for future production Company will check lengths of current batch (rework =they throw the connector hood and recut the wires) –Guessing around 50% of the harnesses in the first batch have > 2 mm length difference (but it’s maller than the samples) –We’ll need to decide how to proceed and how many to have fixed –Need to understand margin in the length difference There are also designs for Clips to keep the cables in place (Tony). Production of the mould started - finished by end of the year

25 October 2005A. Ciocio - SCTSG5 PP1 connection

25 October 2005A. Ciocio - SCTSG6 PP1 (cont’d) To be sure that the existing strip lengths are correct, we'd need to assemble two cables of each of the three strip lengths together with a real PPB1 and clamp Find out about order of installation Different strips back lengths harness brought back from company in last visit - we’ll try them

25 October 2005A. Ciocio - SCTSG7 Extra length in sector 9 TC are asking us to make our type II cables longer in one sector (by 5 m), so that the thinner cables continue through a difficult region Find limits on voltage drop that we can tolerate, translated into an upper limit on the length of type II (in progress Pippa Heinz et al) see Pippa’s talk

25 October 2005A. Ciocio - SCTSG8 DPP1 in cryostat checked the dummy PPB1 in the cryostat bore (with Andy)

25 October 2005A. Ciocio - SCTSG9 Plan Provide lengths (done) and labels for harnesses for first batch of cables (for sector 5) so that the connectors can start to be placed (~200 cables) (soon we hope) Work out lengths (and provide them) for future production Connectors will be delivered end of November but we are hoping to get a small amount delivered sooner so that we can have the 200 mentioned above built. Prepare for testing Work on QA and clarify lengths of strip back with company