CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 1 Exploded view of CMS ECAL Tracker HCAL 4T solenoid Muon chambers Total weight: 12,500 t Overall diameter:

Slides:



Advertisements
Similar presentations
TYPE TEXT HERE On July 4, 2012, scientists at CERN announced the discovery of an essential part of the Standard Model of particle physics: the Higgs.
Advertisements

PPRP September 2002 UK CMS 1 CMS Endcap Electromagnetic Calorimeter and Global Calorimeter Trigger, Physics & Computing Presented by Peter Hobson, Brunel.
Vacuum Phototriodes for the CMS Electromagnetic Calorimeter Endcap
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March.
The CERN-JINR Collaboration J. Engelen March 27, 2006.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
W. MajerottoRECFA, Innsbruck, 26 March ‘04 High Energy Physics in Austria W. Majerotto Institut für Hochenergiephysik d. Österr. Akademie d. Wissenschaften,
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
1 Operating, Maintaining, and Upgrading the LHC Detectors Sally Seidel University of New Mexico U.S. Department of Energy April 18, 2003.
ATLAS experiment Paula Eerola ATLAS presentation Prof. Paula Eerola Division of High Energy Physics Fysiska institutionen,Professorsgatan 1,
Application of Neural Networks for Energy Reconstruction J. Damgov and L. Litov University of Sofia.
C. Foudas, Imperial CMS Upgrades Workshop FNAL – Trigger Introduction Status of the CMS Trigger Upgrade Activities: –uTCA and Optical Link upgrades.
B W Kennedy, CCLRC Rutherford Appleton Laboratory VPTs for the CMS experiment B W Kennedy CCLRC Rutherford Appleton Laboratory St Petersburg, 26 April.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Vendor Day 30 th April.
1. 2 CERN European Organization for Nuclear Research Founded in 1954 by 12 countries – Norway one of them Today: 20 member states, around 2500 staff –
John Womersley Particle Physics in CCLRC John Womersley Director of Particle Physics, CCLRC Zeuthen May 2006.
PPARC forum on developments in scintillator technology R M Brown - RAL 1 Scintillating Crystals for Particle Physics Outline  Performance considerations.
CMS Week, CERN, 2002 R M Brown - RAL 1 Performance Characteristics of Production VPTs R M Brown, B W Kennedy, P R Hobson (with crucial input from D J A.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
RAL Particle Physics Department – Brief Report to the Community Dave Wark Liverpool Town Meeting April 10 th, 2013.
Roger Rusack – The University of Minnesota 1.
Large Hadron Collider and ATLAS in Canada First beam circulation 10 September 2008 Rob McPherson Canadian Institute of Particle Physics and the University.
CMS-UK RAL 20/4/06 R M Brown - CCLRC 1 CMS Submission to PPGC UK Deliverables Status of CMS UK Progress & Commissioning Plans Computing UK Physics Programme.
PSD8 September 2008, Glasgow.P R Hobson, Brunel University 1 Avalanche Photodiodes and Vacuum Phototriodes for the Electromagnetic Calorimeter of the CMS.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
Fermilab Annual DOE Program Review May 16-18, 2005 JF1 CMS M&O at FNAL Jim Freeman US CMS M&O Manager May 17, 2006.
GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow.
Tony Doyle - University of Glasgow 8 July 2005Collaboration Board Meeting GridPP Report Tony Doyle.
DOE Review Adi Bornheim California Institute of Technology July 25, 2007 CMS ECAL Status, Test Beams, Monitoring and Integration.
B W Kennedy, CCLRC Rutherford Appleton Laboratory Vacuum Phototriodes for the CMS Electromagnetic Calorimeter Endcaps K.W.Bell, R.M.Brown, D.J.A.Cockerill,
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
LHC CMS Upgrade Project CD-1 Alternative Selection and Cost Range Steve Webster Federal Project Director August 26, 2013 CD-1 Executive Session.
Friday the 18th of May, 2001US CMS Physics J.G. Branson1 Physics in (US) CMS James G. Branson UC San Diego US CMS Collaboration Meeting Riverside CA.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
First CMS Results with LHC Beam
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
CMS-UK RAL 20/4/06 R M Brown - CCLRC 1 CMS Submission to PPGC UK Deliverables Status of CMS UK Progress & Commissioning Plans Computing UK Physics Programme.
From the Standard Model to Discoveries - Physics with the CMS Experiment at the Dawn of the LHC Era Dimitri Bourilkov University of Florida CMS Collaboration.
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
- 11apr03 # 1 Operations Operations Management = LCG deployment management Management team at CERN (+7 FTEs) Core infrastructure.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
CMS ELECTROMAGNETIC CALORIMETER Jean-Pierre Ernenwein OVERVIEW 6th international conference on advanced technology and particle physics Villa Olmo, Como,
LHC Computing at RAL PPD Dave Newbold RAL PPD / University of Bristol The LHC computing challenge PPD and the Grid Computing for physics PPD added value.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
HEP2001, Budapest, July 2001 R M Brown - RAL 1 The Vacuum Phototriodes for the CMS Electromagnetic Calorimeter P R Hobson, D C Imrie, O Sharif Brunel University,
CMS ROC Report Patricia McBride May 26, 2005.
LHC Science Goals & Objectives
ILD Technical Coordination
The Modular Design of CMS
Collaboration Board Report
CMS Goal of the experiment
UK CMS Oversight Committee Mtg
ELECTROMAGNETIC CALORIMETER
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 1 Exploded view of CMS ECAL Tracker HCAL 4T solenoid Muon chambers Total weight: 12,500 t Overall diameter: 15 m Overall length 21.6 m Magnetic field 4 T

CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 2 LHC Intersection Point 5

CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 3 CMS Collaboration

CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 4 UK in CMS Bristol Brunel Imperial PPD ED/ID Electromagnetic Calorimeter Endcaps (EE) Tracker Readout Electronics Global Calorimeter Trigger Computing & Software

CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 5 Bristol CategoryNumberFTE(CMS) Academics63.5 Adv.Fellow10.7 PDRA11.0 e-science21.0 Eng/Tech32.3 Total138.5 Staff 6PhD Students Includes: 1 Joint with PPD 2 e-science Global Calorimeter Trigger35% (Project leadership, firmware/software, Input Modules, etc.) E-science/Computing25% (Data management, MC production, Tier-1 centre development) Electromagnetic Calorimeter20% (Beam test, calibration, electronics/trigger, mechanics) Physics20% (W/Z anomalous couplings, direct  production, SUSY) Activities

CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 6 Brunel CategoryNumberFTE(CMS) Academics41.0 PDRA22.0 e-science10.8 Eng/Tech21.1 Total94.9 Staff 1 PhD Student Electromagnetic Calorimeter35% (VPT QA at 4 T, Radiation hardness of ECAL components) Tracker25% (Software for beam-line data analysis) E-science/Computing25% (Integrating BOSS software with Grid middleware) Physics15% (W/Z anomalous couplings) Activities

CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 7 Imperial College CategoryNumberFTE(CMS) Academics53.8 PDRA75.7 e-science41.6 Eng/Tech136.9 Total Staff 8 PhD Students Tracker40% (Project management, electronic design, firmware/software, etc.) E-science/Computing15% (Middleware, MC production, Data Challenge) Electromagnetic Calorimeter30% (Crystal studies, beam test, software, electronics, mechanics) Physics15% (Higgs studies, e-  physics, SUSY) Activities 2 FT Academics in CERN, including CMS Deputy Spokesman

CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 8 PPD-CCLRC CategoryNumberFTE(CMS) Academics65.5 PDRA11.0 Applied Ph10.7 Eng/Tech32.8 Total1110 Staff 1 PhD Student (joint with Bristol) 1 sandwich student Electromagnetic Calorimeter65% (EE Project leadership, EE mechanics, VPT QA, VPT HV system, EE module assy, ECAL test beam) Tracker20% (FED software, lead Tracker DAQ group) Computing10% (EE description in OO, in-situ calibration) Physics5% (H  ZZ*, H  t t ) Activities

CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 9 CMS_UK Internal Control Steering Committee 7 Members; chaired by Spokesperson Meetings at least twice/year and as and when required. ‘receives regular reports from the PMs, identifies problems and proposes actions to manage resources where needed.’ Proj Mgmt Committee 12 Members; chaired by Director PPD Meetings twice/year. Receives detailed financial and technical reports and Institute reports. Discusses staffing issues. Project Meetings Meetings between Project Engineers and Project Managers, attended by relevant engineering, technical and academic staff. Separate meetings for ECAL, Tracker and GCT projects. Meetings once/month (ECAL, GCT), twice/month (Tracker). Monitor project progress in fine detail.

CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 10 UK-CMS Steering Committee UK SPOKESPERSON R M BROWN DEPUTY SPOKESPERSON G HALL ECAL PM DJA COCKERILL TRACKER PM C FOUDAS GCT PM GP HEATH COMPUTING PM DN NEWBOLD SECRETARY PR HOBSON

CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 11 Forward spend profile

CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 12 Additional CCLRC Engineering Effort for GCT  An additional 4.5 SY of ID effort is required to complete the GCT on schedule.  The resources to fund the extra effort are not available within the GCT project.  It is proposed to fund the effort by suppressing a 5 year post in PPD.  This action has been proposed by the UK Spokesperson and agreed by the Steering Committee. It is supported by the Chair of the PMC.  The Oversight Committee is asked to endorse this action.