Free-range views of the properties based on various criteria Maintenance with automatic appointment- and event-driven triggering and printout Covering.

Slides:



Advertisements
Similar presentations
User Guide TE Connectivity Data Collection Tool (DCT) January 2012.
Advertisements

Model RailRoad Manager Maintenance Management. Railroad Maintenance l Incident Handling l Preventative Maintenance l Data Maintenance.
Customer ManagementCustomer Management Service/Project ManagementService/Project Management Contract ManagementContract Management Parts Inventory ManagementParts.
Gas Plant Operation and Maintenance Overview Presented by Geoff Vail.
Accel Computerized Maintenance Management System.
Sliver Information system KITMaster. Sliver Information System KIT Real time production and quality monitoring –sliver count –sliver evenness –spectrogram.
Using EU-fin Interactive user manual for coordinators (Using EU-fin to the fullest)
Welcome to the Award Winning Easiest to Use & Most Advanced View, Manage, and Control Security, Access Control, Video, Energy & Lighting Systems, & Critical.
MUR-System Next We want with this PowerPoint show how easy it is to install the MUR-Systems hardware. You can try the full version of the software from.
Prof. Seppo Virtanen TUT PURESAFE Final Conference Tuesday 20 January 2015, 14:20 – 14:40 RAMS Methods and Tools: From LHC to FCC.
Documenting the Existing Network - Starting Points IACT 418 IACT 918 Corporate Network Planning.
OHT 3.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The need for comprehensive software quality requirements Classification.
Jw consulting SAP R/3 QM Workshop Rheinfelden Kurt Fantes Prototyp jw LIMS.
High Lights of SAP Business One for Manufacturing.
SAP R/3 Materials Management Module
Supplementary Training Modules on Good Manufacturing Practice
ORACLE ENTERPRISE ASSET MANAGEMENT
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Using Microsoft Outlook: Basics. Objectives Guided Tour of Outlook –Identification –Views Basics –Contacts –Folders –Web Access Q&A.
QC | Slide 1 of 16 June 2006 Good Practices for Quality Control Laboratories P art 4: Inspecting the laboratory Supplementary Training Modules on Good.
Computerised Maintenance Management Systems
SISIFO-GAS A COMPUTERIZED SYSTEM TO SUPPORT SEVERE ACCIDENTS TRAINING AND MANAGEMENT WGRisk Workshop March 29-31, 2004 Köln, Germany César Serrano.
Networking All talk - Selective listen Network up to 15 active nodes + 17 passive nodes Nexus/Discovery panels, network repeaters, R3 19” racks, Alarm.
Front Page …..is an Asset Management tool designed to record and aid the analysis of activities affecting Production capability and costs. …..promotes.
MS Access Advanced Instructor: Vicki Weidler Assistant:
MSDSonline HQ: Viewer Site Tour Main Menu Getting to your Company List Searching within your Company List How to View and Print an MSDS How to Print a.
FaultTree+ V11 Summary of Fault and Event Tree Methods
With Microsoft Windows 7© 2012 Pearson Education, Inc. Publishing as Prentice Hall1 PowerPoint Presentation to Accompany GO! with Microsoft ® Windows 7.
Enterprise Asset Management (EAM)
Welcome to Presentation on Seagull-Enterprise ERP Solutions Vasudha IT Solutions Pvt. Ltd., Pune, India
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
TSS First steps with Fwin - Maintenance TSS - Software.
1. There are different assistant software tools and methods that help in managing the network in different things such as: 1. Special management programs.
User Interface Elements of User Interface Group View.
1 Security Integration and Esgraf sales presentation 01/2015.
FaultTree+ V10.1 Reliability Workbench V9.1 What’s New
Protecting life, environment and property… 1 AutroMaster 5000: Version 4.0 Operation ID: AM5000_operation_eng_
All rights reserved, property and © CAD Computer GmbH & Co.KG 2009 Cover page.
All rights reserved, property and © CAD Computer GmbH & Co.KG 2009 Cover page.
Tools Menu and Other Concepts Alerts Event Log SLA Management Search Address Space Search Syslog Download NetIIS Standalone Application.
Public Health Information System: Industry Session Establishment Profile  Policy  Features Demonstration ●
DATA, SITE AND RESOURCE MANAGEMENT SOFTWARE. A Windows application software designed for use with Stylitis data loggers. EMMETRON consolidates resources,
0 eCPIC Admin Training: OMB Submission Packages and Annual Submissions These training materials are owned by the Federal Government. They can be used or.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Software quality factors
1 Barcelona May 2003 INFORMATICAL SYSTEM INTEGRATING THE RELIABILITY CENTERED MAINTENANCE THE SYSTEM IMPLEMENTATION.
CFM S4 Cloud iQ Guide THE FUTURE OF CASH AUTOMATION.
VApp Product Support Engineering Rev E VMware Confidential.
Saad Haj Bakry, PhD, CEng, FIEE 1 Network Management Support Saad Haj Bakry, PhD, CEng, FIEE P RESENTATIONS IN N ETWORK M ANAGEMENT.
Dialog Design I Basic Concepts of Dialog Design. Dialog Outline Evaluate User Problem Representations, Operations, Memory Aids Generate Dialog Diagram.
Introduction to KE EMu Unit objectives: Introduction to Windows Use the keyboard and mouse Use the desktop Open, move and resize a.
Computerised Maintenance Management Systems
THE EYESWEB PLATFORM - GDE The EyesWeb XMI multimodal platform GDE 5 March 2015.
IBM Maximo Asset Management Doug Wood, Architect Tivoli CTO’s Office COBie CMMS/CAFM Challenge121-Dec-11.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
InLoox product presentation Project management software, integrated into Microsoft Outlook®.
MM - Purchasing.
Architectural Description The Wind application is based on the JDDAC platform. The system is comprised of a network of weather stations responsible.
How to complete and submit a Final Report through
3.2 Your strategic MES partner.
Improve asset availability
How SCADA Systems Work?.
Engineering Technology Division
(Includes setup) FAQ ON DOCUMENTS (Includes setup)
Cover page.
PROJECT MANAGEMENT Bill Biddle.
Forecasting for budget and execution
Overview of Oracle Site Hub
Fwin - Maintenance TSS - Software
Presentation transcript:

Free-range views of the properties based on various criteria Maintenance with automatic appointment- and event-driven triggering and printout Covering breakdowns, repairs, events and other occurences, expandable to user specifications Analysis of labour time and spare parts for all occurences, optional overview according to requirement and usage Booking terminal for shop, measures, warehouse and inventory management Failure recording and fault analysis, error code system Manual and automatic error message system with central management and qualification Quality management for process-relevant plants and recording of environmental parameters MS Office© interface for output of data in Excel© or Word© Facility and location management, user-specific property and order types and much more…

Displaying properties in the “structural view”

Displaying properties in the “list view”

Displaying properties in the “symbol view”

Viewing the properties with the “Graphic Navigator”

Maintenance with automatic appointment- and event-driven triggering and printout  Assign maintenance per Drag & Drop

Human resources planning  Overview of all unplanned tasks  Overview of all allocated measures  Tasks can be distributed over several days and people

Human resources planning – Weekly tasks  Overview of all tasks assigned to a Person

Human resources planning – printout of weekly tasks  Plan of weekly tasks incl. bar codes for simplified reporting

Up-to-date codes at all times – determine the interval, AWa2000 always displays all important issues up-to-date:  Overview of all open measures

Up-to-date codes at all times – determine the interval, AWa2000 always displays all important issues up-to-date:  Distribution and development of personnel costs by task groups and types, absolute or in percentages

Up-to-date codes at all times – determine the interval, AWa2000 always displays all important issues up-to-date:  Distribution and development of down times by task groups and types, machine groups and cost centres, absolute or in percentages

Up-to-date codes at all times – determine the interval, AWa2000 always displays all important issues up-to-date:  Top ten list of properties: the highest personnel costs, the most down times, the most tasks, by task groups, types and total

Covering breakdowns, repairs, events and other occurences, expandable to user specifications

Analysis of labour time and spare parts for all occurences, optional overview according to requirement and usage  Cost centre analysis  Labour time overview  Spare part analysis  Task and event analysis

Shop booking terminal Touchscreen operation

Warehouse management booking terminal Touchscreen operation

Inventory management booking terminal Touchscreen operation

Measures booking terminal Touchscreen operation

Stock list with classification

Failure recording and fault analysis, error code system  Properties groups statistic

Failure recording and fault analysis, error code system  Statistik Objekte

Failure recording and fault analysis, error code system  Error codes MTBF, MTTR, RZ, etc.

Failure recording and fault analysis, error code system  Time spent due to errors

Distribution of errors by properties, sorted by ranking

Top Ten analysis by frequencey per error code

SMM Error reporting module: manual and automatic error message system with central management and qualification

Quality management for process-relevant plants and recording of environmental parameters  Monitoring process-relevant occurances on properties  Automatic triggering of QA orders when intervening in a process  Recording release of processes or automatic triggering of follow-up orders in the case of reworking  Recording codes of the environmental relevance of properties  Overview of all environment-relevant properties

Exporting data: MS Office© interface for output of data in Excel© or Word©

Importing data: transferring user-defined structures from Excel©

Facility and location management, user-specific property and order types  Organise your properties by region, branch and plants

Facility and location management, user-specific property and order types  Structure your properties by location and property group

Facility and location management, user-specific property and order types (Facility Management)  Manage properties and premises units

 Defining visualisation user-interfaces with corresponding switch options SPS+ data link of the SPS control to the computer network and AWa2000 (Maintenance measures by meter reading and error messages)

SPS+ data link of the SPS control to the computer network and AWa2000 (Maintenance measures by meter reading and error messages)  Disaplaying readings in diagrams

SPS+ data link of the SPS control to the computer network and AWa2000 (Maintenance measures by meter reading and error messages)  User interface with switch options

SPS+ data link of the SPS control to the computer network and AWa2000 (Maintenance measures by meter reading and error messages)  Alarm overview for monitoring controls and connections

Document interfaces Integrating user-specific documents as a shortcut or copy Documents on:  Properties (plants, machines, equipment)  Inspections / Maintenance  Failures / Repairs  Events  Addresses (suppliers, manufacturers, etc.)  Spare parts

Maintenance plan with status and time due for of all appointments in the system

Inspection plan of a property structure with all open measures and direct editing options

Event report of all measures occuring in a unit of time (shift, day, week, month, any)

Personnel report of all measures processed in a unit of time (shift, day, week, month, any)

Overview of all planned, actual and unanticipated costs (budget comparison)

Mobile data logging PDAs with Windows Mobile 2003 Distributed logging: Reports Human resources Material resources Failures / Errors

List output in various formats using the Report Generator  HTML  PDF  Bitmap  JPEG  RTF  XML  TIFF

Human resource planning instrument Assign tasks per Drag & Drop Overview of weekly tasks

Occupational safety and the environment  Hazardous substances  Risk analyses  Risk evaluation  Operating instructions

Occupational safety and the environment  Support by identification guides

Occupational safety and the environment  Create and manage operating instructions

Occupational safety and the environment  Create and manage risk evaluations

An overview of references