1 COPC/CSAB JAG-CCM Status Updates and Recommendations Prepared for: CSAB Spring Meeting April 15, 2009 By: CCM Team version 1.3-20090413.

Slides:



Advertisements
Similar presentations
A-16 Portfolio Management Implementation Plan Update
Advertisements

Allan Darling Deputy Director, NCEP Central Operations NOAA NWS NCEP
1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting Nov 4-5, 2014 JAG-CCM Team.
WG-CSAB Updates Fall 2014 COPC Meeting (NSOF, Suitland, MD) Nov 4-5, 2014 Dave McCarren WG-CSAB Chair.
Sustainability Planning Pat Simmons Missouri Department of Health and Senior Services.
1 WebTrust for Certification Authorities (CAs) Overview October 2011 WebTrust for Certification Authorities (CAs) Overview October 2011 Presentation based.
Working Group for Consolidated Communications Management (JAG-CCM) Update Spring CSAB 2008 Mr. Charles Abel AFWA JAG Representative.
Effects of restricting ports 20/21 on DoD Networks and Information Transfer Operations Fall COPC 2007 Mr. Walter L. Coley, Jr. JAG/CCM Chair.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
COPC/JAG-CCM Status Updates and Recommendations 16 November 2010 Chris Finnigsmier Acting JAG/CCM Chair.
Committee for Operational Processing Centers (COPC) Update NOPC Program Council Meeting 13 June 2012 (OFCM – Silver Spring, MD) Dave McCarren WG-CSAB Chair.
Joint Action Group for Operational Community Modeling (JAG/OCM) update Fall COPC 2010 Mr. Evan Kuchera JAG/OCM Chair.
WG-CSAB Update Fall 2010 COPC Meeting (AFWA – Offutt AFB) Allan Darling WG-CSAB Chair.
Connecting People With Information DoD Net-Centric Services Strategy Frank Petroski October 31, 2006.
1 LBNL Enterprise Computing (EC) January 2003 LBNL Enterprise Computing.
1 COPC Shared-Network Infrastructure Brief Prepared for: COPC Working Group for Cooperative Support and Backup (WG/CSAB) October 21 and 22, 2008 Meetings.
ESDA Discussion Spring 2015 COPC Meeting (NCEP, College Park, MD) May 27-28, 2015 Lamar Russell WG-CSAB Chair.
UNCLASSIFIED 1 Presented by: Dr. Richard A. Russel SCNC Chief Architect Northrop Grumman Mission Systems ISCN Top Down and Bottom.
NOAA Climate Program – An Update NOAA Science Advisory Board March 19, 2003 NOAA Science Advisory Board March 19, 2003 Mary M. Glackin NOAA Assistant Administrator.
WG-CSAB Updates Spring 2015 COPC Meeting (NCEP, College Park, MD) May 27-28, 2015 Lamar Russell WG-CSAB Chair.
The Pathway to Success Goal IV Strengthen and Leverage Programs of Strength and Promise.
IS&T Project Management: How to Engage the Customer September 27, 2005.
H-8 Project Update COPC May 27, H-8 Project Update JMA planning for full H-8 operations in July 2015 – Commissioning progressing well Data quality.
Overview of NIPP 2013: Partnering for Critical Infrastructure Security and Resilience October 2013 DRAFT.
Applied Technology Services, Inc. Your Partner in Technology Applied Technology Services, Inc. Your Partner in Technology.
Wave 1 Project Current Status (identify recent engagements, deliverables, etc.) What’s Next Strategic Purchasing – Scientific Supplies MRO Supplies Computer.
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
Working Group for Cooperative Support and Backup (WG-CSAB) Update Fall COPC 2007 John Zapotocny CSAB Chair.
NASA IT Governance Overview Gary Cox August 18, 2010.
1 Draft COPC/CSAB JAG-CCM Status Updates and Recommendations September 15, 2009 JAG-CCM Team version
IT PMB: Executive Oversight and Decision Authority for Application and Infrastructure Projects at NASA Larry Sweet Chair, IT PMB JSC CIO August 2010.
National Wildland Fire Weather Needs Assessment National Wildland Fire Weather Needs Assessment Mr. Mike Babcock Senior Staff Meteorologist, OFCM CCAMS.
JAG/CCM Update COPC Spring 2006 Mr. Walter Coley JAG/CCM Chairman Distribution Authorized to U.S. Government Agencies and their Contractors only.
Allan Darling Deputy Director, NCEP Central Operations NOAA NWS NCEP
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
JAG/ODAA Fall 2008 James Vermeulen & Jon Whiteside JAG-ODAA Co-Chairs Recommend NCEP's Bradley Ballish replace Jon Whiteside (term completed)
WG-CSAB Update Fall 2010 COPC Meeting (FNMOC – Monterey, CA) Allan Darling WG-CSAB Chair.
1 JAG/CCM Status Updates and Recommendations Spring COPC Meeting May 27-28, 2015 Craig Wade JAG-CCM Chairperson.
CGMS-40, 5 November 2012 Coordination Group for Meteorological Satellites - CGMS Towards a CGMS High Level Priority Plan (HLPP)
WG-CSAB Update Fall 2009 COPC Meeting Allan Darling WG-CSAB Chair.
1 JAG/CCM Status Updates and Recommendations Fall COPC Meeting November 20-21, 2013 JAG-CCM Team Craig Wade (CCM Chair)
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
1 COPC/CSAB JAG-CCM Status Updates and Recommendations October 21, 2009 JAG-CCM Team version
Connecting People With Information 1 DoD Enterprise Software Initiative  Alignment with High-Level Goals –Transform Enterprise Management –Strategic Sourcing.
Working Group for Consolidated Communications Management (JAG-CCM) Update Fall COPC 2007 Mr. Walter Coley JAG Chairman.
Deloitte Consulting LLP Commonwealth of Massachusetts IT Consolidation Initiative IT Governance Target State Update Briefing for Statewide Working Group.
1 COPC JAG-CCM Status Updates and Recommendations May 4, 2010 JAG-CCM Team version
1 COPC/CSAB JAG-CCM Status Updates and Recommendations April 7, 2010 JAG-CCM Team version
MPE – Enabling ALL to securely SEE, DECIDE, ACT MPE - Highlights  Establish Core Implementation Working Group  Build Joining, Membership, and Exiting.
1 Joint Action Group for Operational Community Modeling Dr. Nelson Seaman JAG/OCM Chair Fall COPC 2008 AFWA, Omaha, NB 13 November 2008.
Target State High-level IT Governance Model
Federal Software Asset Management Initiative Concept of Operations Report to the Executive Steering Committee March 8, 2004 Implementing the President’s.
WG-CSAB Updates Spring 2013 COPC Meeting (FNMOC, Monterey, California) November 20-21, 2013 Dave McCarren WG-CSAB Chair.
1 JAG/CCM COPC Status Updates and Recommendations NOV 4-5, 2015 LCDR Tristan Borne JAG-CCM Chairperson.
V7 July 22, Analysis of Alternatives Decision Brief to the SPSRB Instructions / Guidance This template will be used by NESDIS personnel to present.
WG-CSAB Updates Fall 2015 COPC Meeting (Offutt AFB, Omaha, NE) November 4-5, 2015 Lamar Russell WG-CSAB Chair.
CEOS Self-Study Preliminary Ideas on Implementation: Toward a Refined CEOS Michael H. Freilich Incoming Chair, CEOS-SIT
State of Georgia Release Management Training
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
WG-CSAB Update Fall 2008 CDR Mark Moran, NOAA WG-CSAB Acting Chair.
COPC Action Item : The COPC/CSAB shall work with the NUOPC Deputy PM to develop a proposed structure for the working relationship between NUOPC.
NSDI Strategic Plan Update FGDC Coordination Group Meeting November 19, 2013.
UNCLASSIFIED 1 United States Joint Forces Command Joint Warfighting Center United States Joint Forces Command Joint Warfighting Center LTC John Janiszewski.
Power to the Edge A Net-Centric DoD NII/DoD CIO IT Acquisition Management Transformation Rapid Improvement Team (RIT) Principals Meeting November 18, 2003.
1 JAG/CCM COPC Status Updates and Recommendations May 4-5, 2016 LCDR Tristan Borne JAG-CCM Chairperson.
WG-CSAB Update Fall 2009 COPC Meeting Allan Darling WG-CSAB Chair.
WG-CSAB Update Spring 2010 COPC Meeting Allan Darling WG-CSAB Chair.
Implementation Strategy July 2002
Establishing Strategic Process Roadmaps
Employee engagement Delivery guide
Presentation transcript:

1 COPC/CSAB JAG-CCM Status Updates and Recommendations Prepared for: CSAB Spring Meeting April 15, 2009 By: CCM Team version

2 Outline CCM Team Membership Status Updates and Recommendations –Encryption requirements for Controlled Unclassified Information (CUI) –Development of the Next Generation COPC Enterprise Network –Requirements gathering across the COPC partners Summary

3 CCM Team MemberOrganization Charles AbelAir Force/AFWA/A6 Kenneth BarnettOFCM Luis Cano*NOAA/NWS/NCEP/NCO Patrick GregoryNOAA-NESDIS-OCIO Craig HegemannNOAA/NWS/OCIO/TOC Seyed HosseiniNOAA/NESDIS/OSDPD/IPD Ben KygerNOAA/NWS/NCEP/NCO Sherryl PanekNavy/FNMOC Casey SwansonNavy/CNMOC/N6 VacantNavy/NAVO *JAG-CCM Chair

4 Encryption Requirements for Controlled Unclassified Information (CUI) COPC Action Item : JAG CCM will provide analysis of recent changes to DoD IA requirements regarding the category “unclassified but sensitive” and determine if this new guidance requires encryption for meteorological data. AFWA TD will capture the new guidance and provide to JAG CCM. [NUOPC related] Priority: (H) Advocate: JAG/CCM – [Luis Cano (Chair)] Suspense: Spring 2009 CSAB meeting or (April 1, 2009). Status as of 19 March 2009: Open.

5 Encryption Requirements for Controlled Unclassified Information (CUI) Status: –CUI analysis completed Information designated as CUI requires encryption for electronic transmission Encryption shall be implemented in accordance with FIPS 140-2, Security Level 1 Five years to implement CUI framework - due May 2013 Encryption requirements captured within “Requirements Gathering Across COPC Partners” action item See next slide for COPC partners’ CUI encryption status Recommendation: –close Action Item

6 Encryption Requirements for Controlled Unclassified Information (continued) Data SourceData DestinationProtocol*Meets CUI encryption requirement? AFWAFNMOCFTPN AFWANWSTGIP SocketsN FNMOCNWSTGHTTPSY FNMOCAFWAFTPN FNMOCNAVOFTPN NAVOFNMOCFTPN NAVONWSTGFTPN NAVONWSTGSFTPY NESDISAFWAFTPN NESDISFNMOCFTPN NESDISNAVOFTPN NWSTGAFWAFTPN NWSTGAFWAIP SocketsN NWSTGFNMOCFTPN Assumption: COPC shared data designated as CUI (*Currently, no data is designated as CUI)

7 Development of the Next Generation COPC Enterprise Network COPC Action Item : JAG CCM shall coordinate the development of the next generation COPC shared network infrastructure with DoD and NOAA IT leadership. The JAG CCM shall leverage projects currently underway that are planning a NOAANet-DoD enterprise network capability. [NUOPC related] Priority: (M) Advocate: JAG/CCM – [Craig Hegemann] Suspense: Spring 2009 CSAB meeting or (April 1, 2009).

8 Development of the Next Generation COPC Enterprise Network Due Date MilestonesAssigned toStatusComments 4/13/09NWS TOC meet with DISA to connect with appropriate level of DISA leadership NWS TOC DirectorComplete NWS TOC and DISA establish strategic alliance to work NOAANet-DoD enterprise network program 5/01/09NWS TOC coordinate draft high-level milestones and schedule NWS TOC DirectorOpen High level milestones and schedule provides insight to the development and deployment of NOAANet-DoD enterprise network capabilities Milestones and schedule to be presented at the COPC meeting scheduled for May 13-14, 2009

9 Development of the Next Generation COPC Enterprise Network Status: –actively working action item Recommendation: –keep action item open

10 Requirements Gathering Across COPC Partners COPC Action Item : JAG CCM will provide an ongoing process to capture and coordinate telecommunication requirements across COPC partners. These requirements would include the size of the data, when the data needs to be transmitted, when the data needs to be received, which COPC partner will send the data, which COPC partner will receive the data, the schedule of when new data will or needs to be enabled, encryption requirements, other data restrictions, and related COPC business functions. As a follow-on action item, this process would be used to validate technical designs and resource estimates for new network infrastructure initiatives. This process would provide COPC continuing value by supporting network capacity management for existing infrastructure and help justify funding requests for future network upgrades. [NUOPC related] Priority: (M) Advocate: JAG/CCM – [Luis Cano (Chair)] Suspense: Spring 2009 CSAB meeting or (April 1, 2009).

11 Requirements Gathering Across COPC Partners Due Date MilestonesAssigned to StatusComments 2/26/09CCM meet with COPC Senior IT Leadership CCM, OFCM and COPC Senior IT Leadership Complete CCM communicated issue of lack of progress in providing needed network infrastructure for COPC missions CCM assigned action to initiate shared network requirements data-call to COPC CIOs 3/19/09OFCM send shared network requirements data- call to COPC CIOs CCM and OFCM Complete CCM coordinated design of requirements template with DISA Template design captures annual requirements for 5-years into future 4/24/09COPC CIOs send completed shared network requirements template to OFCM CIOsOn-track 4/2/09: Navy and Air force actively working data-call. 4/13/09: Acknowledgment from NESDIS of working on data call 4/13/09: NWS TOC to leverage climate data requirements and coordinate with NESDIS OCIO 5/29/09CCM analyze requirements and report-out to CSAB, COPC CIOs and DISA CCM and OFCM Open COPC CIOs and DISA use requirements to provide COPC shared network infrastructure AnnualUpdate COPC shared network requirements using annual data-call process CCM, OFCM and COPC CIOs Open Annually update 5-year projection of COPC shared network requirements and share with COPC CIOs and DISA

12 Requirements Gathering Across COPC Partners Status: –actively working action item Recommendation: –keep action item open

13 Summary COPC Action ItemStatusRecommendation Encryption Requirements for Controlled Unclassified Information CompleteClose action item Development of the Next Generation COPC Enterprise Network On trackKeep action item open Requirements Gathering Across COPC Partners On trackKeep action item open