Why do you need a plan for walkers? They can walk anywhere, can’t they?

Slides:



Advertisements
Similar presentations
January 23, 2006 FAIRFAX COUNTY PEDESTRIAN TASK FORCE FAIRFAX COUNTY PEDESTRIAN TASK FORCE FINAL REPORT.
Advertisements

ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
1 ODOTs Complete Streets Initiative. 2 Tipping Point for Complete Streets.
Louisiana Safe Routes To School Program
1. Region of Peel Active Transportation Study2 Where is Peel?
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
U.S. 33 Northern Connector Alternative
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Pedestrian and Bicycle Concerns About Highway Design and Operation Barb Mee, AICP City of Asheville Transportation Department
Introducing Bicycle/Pedestrian Planning & School Travel Plans Presentation prepared for the 2010 Active Transportation Conference Jim Fisher, PhD, AICP.
Complete Streets & Your Local MPO IL APA Conference September 23, 2010 John A. Chambers Senior Planner Tri-County Regional Planning Commission.
Presentation by: Catherine Woodyard, MS: Mississippi Network Organizer for the Safe Routes to School (SRTS) National Partnership Melody Moody: Executive.
 City of Mesa Council Presentation October 23, 2014.
Fundamental Methods for Building More Walkable Communities Mark Fenton Pedestrian and Bicycle Information Center University of North Carolina.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
Complete Streets Policy and Implementation Jason Ridgway February 11, 2014.
County Wide Active Transportation Study (CWATS) Master Plan Active Communities Summit – October 3, 2011.
Building Healthy Communities “ Healthy Places and Healthy People Go Together” Kate Whitehead, BS Tim Scandale, BS Selina Rooney, RCDC Funded through a.
Maintenance and Protection of Traffic (MPT) – HDM Ch 16.
1 ACCESS to QUALITY CULTURAL, RECREATIONAL, EDUCATIONAL and LEISURE OPPORTUNITIES Collaboratively encourages and supports opportunities to focus on the.
Walking and Biking the Busiest Roads Around Atlanta: a Bike/Ped Plan that establishes non-motorized transportation among regional-scale priorities Regan.
History of US Bicycle Routes In 1970’s interest in long distance bicycle travel proliferates.
DATS Bicycle Planning 2009 Bicycle Advisory Committee Kickoff Danville Area Transportation Study July 13, 2009.
Why do you need a plan for walkers? They can walk anywhere, can’t they?
Mapping the Way to Success: the Arkansas Safe Routes to School Program.
City of Leawood Bicycle Friendly Community The Year in Review.
KYTC Bicycle & Pedestrian Program February 24, 2015.
Bicycle and Pedestrian Planning May City of Ellsworth Bike-Ped Planning May 2009 Accomplishments: POLICY and ADMINISTRATION The City Council adopted.
Multimodal Corridor Plan BCC Discussion Item Transportation Planning Division August 19, 2014.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
New Visions Bicycle & Pedestrian Action Plan Bicycle and Pedestrian Transportation – Bicycle and pedestrian travel is vital to the region’s public health,
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Transportation Planning 599 Cooltoolsfor successful transportation projects Troy Hearn Division of Planning.
Lompoc Community Assessments “What We Learned” Presented by Judy Taggart MS, CHES March 25, 2010.
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
Bicycling in Montgomery County Where we are and where we’re going Montgomery Bicycle Advocates (MoBike) – 5/14/11.
Instructions  Check in with Andrew Bomberger at TCRPC to let him know what muni you will be visiting so he can give you any specific info for that muni.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Rural Transportation Planning Eunice Fitzpatrick Transportation Planner Kentucky River ADD Hazard, KY.
County of Fairfax, Virginia Department of Transportation 1 Requirements for Pedestrian Improvements on Road Projects in the Board’s Six Year Priority Plan.
City Leadership & Bike Edina Task Force Annual Work Session February 16 th, 2010.
Atlanta Regional Commission Tom Weyandt, Department Director Comprehensive Planning May 2008.
City Leadership & Bike Edina Task Force Annual Work Session June 7 th, 2011.
Presentation title | Date. Who We Are Building a Healthier Heartland (BHH)  Super-coalition of local and national partners that promotes policy, systems.
Complete Streets Michigan’s Approach Mark A. Van Port Fleet AASHTO SCOD Annual Meeting July 15, 2008.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
Complete Streets Training
Complete Streets The Columbus Experience Road School March, 2014.
District 11 CEAL Meeting: Bike/Ped Update SETH CUTTER DISTRICT BICYCLE AND PEDESTRIAN COORDINATOR APRIL 13, 2016.
2016 Active Transportation Plan Goals, Objectives & Criteria Bicycle and Pedestrian Facilities Advisory Committee March 2, 2016 meeting.
Maintenance and Temporary Traffic Control
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Publication No. FHWA-HRT Bicycle and Pedestrian Planning.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
 The Pedestrian Plan is:  Long Range and Comprehensive  Conceptual  A Vision for the Future  The Plan is not:  Regulatory or Binding  A Master.
REGIONAL BICYCLE AND PEDESTRIAN PLAN
Complete Streets Policy + Bicycle / Pedestrian Plan
Nolanville Main Street Sidewalk & Bicycle Connectivity
NVTA Countywide Pedestrian Plan of July 2016
Rural Transportation Planning
City of Wilmington Bike Plan Update
Emily Guenther Zach Olson Laura Scott Cameron Wein
MPO Board Presentation
Safe Routes to School John Schaefer State Coordinator.
Presentation transcript:

Why do you need a plan for walkers? They can walk anywhere, can’t they?

How to PLAN for Your Community  P People/Professionals/Partners  L Locate Places on a Map  AAssess priority  NNetwork your plan

People and Places: Connections Matter Connecting people to places via all possible modes of Transportation

 Children  Seniors  People using canes, walkers or wheelchairs  Economically disadvantaged  Active walkers or runners  College students  Tourists and visitors  Local business patrons/owners  You and me PEOPLE: Who needs to be served? Know the people who can benefit in your community

PEOPLE (The Professionals): Planning Committee Members  Local/Regional Health Departments & Hospitals  Cooperative Extension  City/County Officials, Planners and Engineers  Area Development District  Tourism/Economic Development  Chamber of Commerce  Local Citizens, Parents, Business Owners  1 st Responders (Police, Fire, EMS)  Advocates Know the people who can help with planning in your community

PEOPLE: Small Project Assistants  Provide assistance with information gathering or project support Church groups Civic groups: Rotary, Civitan/Ruritan, Chamber of Commerce  Accomplish small projects such as area cleanups or bench building School groups Scout and 4-H groups Know the groups or partners who can help with projects in your community

Involvement + Coordination + Communication PEOPLE: Meeting with Your Committee =SUCCESS!

How to PLAN for Your Community  PPeople and Places  L Locate places on a map  AAssess priority  NNetwork your plan

LOCATE: LOCATE: Survey the Community for WHERE METHOD Online— Survey Monkey Facebook QR Code Door-to-door Postcard Paper-pencil Mobile App WHO Churches Schools Social Media Local Business RESPONSES How many do you need? (Estimate) How many did you get? (Actual)

LOCATE: LOCATE: Sample “WHERE “ Survey Questions  For all or part of your trips to work, shopping, parks or other destinations, do you currently travel by foot? Yes (what percentage _____) No  Are any of the following destinations within 2 miles of your home: workplace, shopping place, school or park? Yes (which ones?_________________________) No  Please list the locations where pedestrian facilities need to be provided or improved: a) b) c)

LOCATE: Map the Focus Area  Get a map (Google, ADD, Chamber of Commerce)  Add or mark origin and destination points (homes, schools, recreation/par ks, businesses, etc.)

Working with Russ Clark

 Start small: zero in on an area of 4 to 6 blocks Consider community’s goals, such as safety, connectivity, health, etc. Identify the area with input from your diverse planning committee and/or survey responses LOCATE: Identify Local Priority Health SafetyConnectivity Economic Development

How to PLAN for Your Community  PPeople and Places  L Locate Places on a map  AAssess priority  NNetwork your plan

ASSESS PRIORITY: Review Focus Area Data  Assess the community survey results  Assess walkability in the focus area

ASSESS PRIORITY: What Does Your City Need?  Develop project(s) to respond to identified needs: Project must meet community goals Project reflects the results form the walkability/biking assessment Project must have a “purpose and need statement”

ASSESS PRIORITY: Customize for Your City  Prioritize plan items based on meeting community goals such as health, safety, mobility, connectivity, etc.  Prioritize plan items with input from your diverse planning committee and/or survey responses  Add the priority to the map

ASSESSPRIORITY: Use Other Communities for Examples ASSESS PRIORITY: Use Other Communities for Examples The KYTC Bicycle & Pedestrian program has links to numerous pedestrian and bicycle plans on its website for you to use as templates

ASSESS PRIORITY: Assemble Your Plan Your plan should include:  Discussion of community goals  Process and criteria used to select focus area  Process and criteria used to prioritize projects  Short project description together with a Purpose and Need statement  Summary map of all prioritized projects and individual project maps

ASSESS PRIORITY: Sample Plan Items Vision: Existing roadways and an abandoned rail bed are upgraded to allow safe pedestrian and bicycle connections through the Crestwood neighborhood. The project links to an existing overpass, offering commuters and school children safe crossing over Wilkinson Blvd. Project Specs: Total length: 3.25 miles Hard surface multi-use trail: 1.25 mile Marked road with sidewalks: 1 mile Bike lanes: 1 mile

ASSESS PRIORITY: Your Plan Priority Map

How to PLAN for Your Community  PPeople and Places  L Locate Places on a map  AAssess priority  NNetwork your plan

NETWORK Your Plan: Get Your Plan APPROVED  Talk it up in the community  Committee member(s) discuss with local officials  Take plan to city council/county fiscal court or other responsible local body for consideration  Get a Resolution of Approval Plan Success = Approval By Local Officials!

NETWORK Your Plan: Publish NETWORK Your Plan: Publish Publish your plan:  Put it on a public web page  Provide the link to TROY and KYTC

NETWORK Your Plan: Tell EVERYONE Share your plan with:  TROY /KYTC Bike Ped Program Office  Planning staff at your Highway District Office  Transportation planners at your MPO  Transportation planners at your ADD  ALL other local and regional government staff  Other regional bike/ped groups/clubs  Local colleges  Anyone else you can think of

NETWORK Your Plan: Highway Plan NETWORK Your Plan: Highway Plan  Develop a Project Information Form so the project can be included in the next Highway Plan project prioritization process. Ask the Transportation Planners (Highway District and ADD) to:

KYTC Pedestrian & Bicycle Travel Policy  Adopted in 2002  Provides checklists for locations requiring accommodations for pedestrians or bicyclists  The Kentucky Transportation Cabinet (KYTC) shall consider the accommodation of bicycles and pedestrians on all new or reconstructed state- maintained roadways.

Individual Project Planning  The purpose & need  Unique details for each location & existing conditions  Identify possible issues  Plan considerations/options available  Justification for accommodation  Examples (standard drawings or photos) & sources

Individual Project Planning Funding $$Sources  FHWA -Transportation Alternatives Program  USDOT-TIGER grants  FHWA- CMAQ in Air Quality Areas  Tourism  Parks Departments  KYTC-Paula Nye Grants for Bike/Ped (Safety, Education, Encouragement)  Sell it a Foot at a Time… Private individuals or organizations Corporate Sponsors

Individual Project Planning  Project Purpose and Need:  The pedestrian accommodation across the bridge on Malibu Drive over Hickman Creek near the junction with KY-1974 (Tates Creek Road) needs to be improved for both safety and connectivity.   Local/regional Planning:  Lexington/Fayette Urban County Bicycle and Pedestrian Master Plan:  Lexington Greenways Map (Figure 1) /  Page 62 & 69 identifies this area as a priority trail corridor /  Existing conditions:  CS-3605/Malibu Drive (MP )  ADT is 4850  Posted speed limit is 35 MPH  No paved shoulder, curb and gutter cross section  Bicyclists Comfort Index (BCI) rating is a D  Moderate use by pedestrians (Figure 2)  Moderate use by cyclists (Figure 3)  KY-1974/Tates Creek Road (MP 9.5)  ADT is  Posted speed limit is 45 MPH  No paved shoulder, curb and gutter cross section  Bicyclists Comfort Index (BCI) rating is a E  Moderate use by pedestrians (Figure 2)  Moderate use by cyclists (Figure 3)

Individual Project Planning  Best: Construct a 5 foot (or wider) separated pedestrian facility across Hickman Creek (on the non-cardinal direction side) and provide a connection to the existing sidewalks at MP 1.64 on CS-3605 / Malibu Drive (see Figure 4) and provide a connection to the signalized crosswalks at MP 9.55 on KY-1974 / Tates Creek road (see Figure 5). Improve existing pedestrian facilities within project limits to current ADA standards (see Figure 5).  Good: Construct a 5 foot (or wider) sidewalk across the bridge (both sides) with a 48 inch tall (minimum) barrier between this facility and the travel lane. Connect the sidewalk to existing sidewalks at MP 1.64 on CS-3605 / Malibu Drive (see Figure 4) and provide a connection to the signalized crosswalks at MP 9.55 on KY-1974 / Tates Creek road (see Figure 5). Construct and improve pedestrian facilities within project limits to current ADA standards (see Figure 5).  Fair: Construct a 5 foot (or wider) sidewalk across the bridge (non-cardinal direction) and connect to existing sidewalks at MP 1.64 on CS-3605 / Malibu Drive (see Figure 4) and provide a connection to the signalized crosswalks at MP 9.55 on KY-1974 / Tates Creek road (see Figure 5). Construct and improve pedestrian facilities within project limits to current ADA standards (see Figure 5).

Individual Project Planning  Figure 2 / Strava Heat Source Map (pedestrian activity) of the project area / / /gray/run / /gray/run

Individual Project Planning  Public meetings  Right-of-way  Project design

Individual Project Planning  Project funding  Operations  Maintenance  Realistic time expectations

Individual Project Construction  Project bids for construction work  Pre-construction public notice signs along project area  Phases of construction

Bike/Ped Planning Provides Opportunity

Questions?