Inspection- “back-end quality control” BUT, Start by designing quality into the front end of the process- the design QFD (Quality Function Deployment)

Slides:



Advertisements
Similar presentations
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Advertisements

Operations Management Statistical Process Control Supplement 6
Chapter 10 Quality Control.
Chapter 9A Process Capability and Statistical Quality Control
Quality Assurance (Quality Control)
Chapter 9A. Process Capability & Statistical Quality Control
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 9 Process Capability and Statistical Quality Control.
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
BMM 3633 Industrial Engineering
Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render Principles.
1 Statistics -Quality Control Alan D. Smith Statistics -Quality Control Alan D. Smith.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter Seventeen Statistical Quality Control GOALS When.
Quality Control Pertemuan 12 Mata kuliah: J Manajemen Operasional Tahun: 2010.
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
Adeyl Khan, Faculty, BBA, NSU Quality Control Adeyl Khan, Faculty, BBA, NSU Phases of Quality Assurance 10-2 Figure 10.1 Acceptance sampling Process.
Chapter 18 Introduction to Quality
Chapter 10 Quality Control McGraw-Hill/Irwin
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
© 2008 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control PowerPoint presentation to accompany Heizer/Render Principles.
J0444 OPERATION MANAGEMENT SPC Pert 11 Universitas Bina Nusantara.
Operations Management
CHAPTER 8TN Process Capability and Statistical Quality Control
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Quality Control.
10 Quality Control CHAPTER
Rev. 09/06/01SJSU Bus David Bentley1 Chapter 10 – Quality Control Control process, statistical process control (SPC): X-bar, R, p, c, process capability.
10-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Statistical Process Control
Statistical Process Control. Overview 1.Definition of Statistical Process Control 2.Common causes and assignable causes of variation 3.Control charts.
10-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER 10 Quality Control/ Acceptance Sampling McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The.
10-1Quality Control William J. Stevenson Operations Management 8 th edition.
Process Capability and SPC
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 17-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 IES 303 Chapter 5: Process Performance and Quality Objectives: Understand.
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 8 Process Capability and Statistical Quality Control.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.
Welcome to MM305 Unit 8 Seminar Prof Greg Statistical Quality Control.
Process Capability and SPC
Process Capability and Statistical Process Control.
Control Charts for Attributes
Chapter 10 Quality Control.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Welcome to MM305 Unit 8 Seminar Diallo Wallace Statistical Quality Control.
Statistical Process Control (SPC)
CONTROL CHART FOR QUALITY CONTROL _ X-R CHART _ X-R chart is a pair of chart consisting of a average chart (X chart) and a range chart (R chart). The X.
Operations Management
Managing Quality CHAPTER SIX McGraw-Hill/Irwin Statistical Process control.
11/23/2015ENGM 720: Statistical Process Control1 ENGM Lecture 08 P, NP, C, & U Control Charts.
Statistical Quality Control/Statistical Process Control
Statistical Quality Control
Production and Operations Management: Manufacturing and Services PowerPoint Presentation for Chapter 7 Supplement Statistical Quality Control © The McGraw-Hill.
1 Slides used in class may be different from slides in student pack Technical Note 8 Process Capability and Statistical Quality Control  Process Variation.
Statistical Process Control Production and Process Management.
Quality Control  Statistical Process Control (SPC)
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Process Capability and Statistical Quality Control.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 30 1.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
Welcome to MM305 Unit 8 Seminar Prof. Dan Statistical Quality Control.
Chapter 16 Introduction to Quality ©. Some Benefits of Utilizing Statistical Quality Methods Increased Productivity Increased Sales Increased Profits.
Statistical Process Control (SPC)
10 Quality Control.
10 Quality Control.
What is the point of these sports?
QUALITY CONTROL AND QUALITY ASSURANCE (Contd.)
Process Capability.
Presentation transcript:

Inspection- “back-end quality control” BUT, Start by designing quality into the front end of the process- the design QFD (Quality Function Deployment) lets customer determine the functions of quality, which are then deployed through design and manufacture. Hoshin Kanri- Japanese methodology for “cascading” front line expertise on how to deploy quality into the design and manufacture.

Cost of inspection Total Cost Cost of passing defectives Optimal Inspection Costs

Using SPC as part of the inspection process “Is our process in control?” I.e. what are the limits we set, using statistics to determine if we need to take corrective action process distribution vs. sample distribution We use a sampling distribution of means of measurements… because it is normal and has less variability. (we’re taking averages of averages) even though the process distribution may not be normal, stats theory tells us the distribution of samples means probably is Translated: We take numerous samples of numerous observations

Sampling distribution Process distribution Mean A sample of means has less variability because the data has been “smoothed” twice

Setting control limits We usually use 2 standard deviations from mean (about 95% of distribution captured) or 3 standard deviations from mean (about 99.7% captured) to set control limits Any values that fall outside of these limits are considered “out of control”… and usually are considered non-random, and therefore, actionable variations TYPE I error: sample mean falls outside of control limits when variation is actually random TYPE II: mean inside control limits when actually non-random

Type I Error Mean LCLUCL  /2  Probability of Type I error

Control Chart UCL LCL Sample number Mean Out of control Normal variation due to chance Abnormal variation due to assignable sources

Calculating Control limits for variables- mean charts Monitor how close the data sticks to the average when we are measuring (not counting) Control Limits= the average of sample means + & - (z *  sample means ) Z is determined by how much of the distribution you want to consider “in control” (Usually 2 or 3)  sample means =std dev. of process samples/ square root of the number of samples

Calculating mean chart control limits

What happens when we go to z=2?

Range charts- a different perspective While mean charts are sensitive to changes in the process mean, range charts give you a feel for process dispersion Because mean charts take averages of means, they don’t tell you when variability is increasing in the process

Mean and Range Charts Sampling Distribution (process variability is increasing) x-Chart UCL Does not reveal increase Reveals increase R-chart

Control charts for summarizing attributes of process, e.g. defects Used when variables are counted, not measured P-chart monitors proportion of defectives used in binomial distribution situations (e.g. answer is “good” or “bad” p= proportion of defectives UCL = p + z(  p ) LCL = p - z(  p )  p = SQR RT of(p(1-p)/n) where n= sample size of each observation

P-chart example. Are we in control?

C-charts: use when non- occurrences can’t be counted (i.e. a continuous variable) Example: initial defects per units of new cars Control limits = c + & - z*(SQR RT of c) where c= mean # of defects per unit and std dev = SQR RT of (c)

You try one What is mean defects per unit? What is Square root of c? What’s the z=2? *10.78= *10.78=94.44 In control? NO

c-chart example. You do z=3.

Run tests Sometimes, all data within a control chart may be within limits, but there is a trend or cycle to the data within limits. This trend or cycle may need management action. Example: machine tolerances loosen before weekend down time, within limits. Run tests attempt to characterize these trends or cycles.

Process Capability analysis Comparing process variability with designed- for variability. (“Are we producing our Mercedes only to Yugo tolerances?” Expressed in terms of standard deviation typically +&- 3 standard deviations from mean (total of 6  ) “6 sigma quality”

Let’s do one Given that machine tolerance is defined as.75mm-1.25mm and you get to choose from 3 machines, which can you choose? Therefore, width=.50 mm ( ) Machine  (mm) (given)Capability A.05 B.08 C.12

Let’s do one Given that machine tolerance is defined as.75mm-1.25mm and you get to choose from 3 machines Machine  (mm) (given)Capability A.05.05*6=.30 B.08.08*6=.48 C.12.12*6=.72 MACHINES A & B function within the.50 specification ( ).

Now compute the capability ratio Given that machine tolerance is defined as.75mm-1.25mm and you get to choose from 3 machines Process capability ratio C p = specification width (“what is our tolerance”)/ process width of machine same as saying upper spec-lower spec/ 6  of machine Machine  (mm) (given)C p A.05.50/.30=1.66 B.08.50/.48=1.04 C.12.50/.72=0.69 MACHINE A is preferable because it has the highest capability ratio. It has the greatest probability of functioning within design specs. Any machine with ratio >= 1.33 is acceptable in generally accepted practiced

For next time Chapter 10 PROBLEMS 2,3,6 to hand in For problem 3, pay special attention to range chart factors in the body of the chapter For problem 2, use appropriate Z table from back of book.

Problem 2 A) mean = 1 ; std. dev = 0.1 n=25 observations z=2.17 (to get 97%) Control limits are mean + and - z*(std dev./ square root of n) (see page 448) UCL = *(.01/SQR(25))= LCL = 1 – 2.17* (.01/SQR(25))= The 5th sample mean of is out of control, and should be investigated. See page 881. We’re using this chart because we’re analyzing both “tails” for upper and lower control limits. Because this table only shows area from mean to one tail, you look for the Z value equal to.9700/2.

Problem 3 we don’t know the std dev. of process sample First get your mean of X and mean of R. Mean of x= 18.6/6=3.1, Mean of R (range) = 2.7/6=.45 Range chart factors table in body of the chapter gives you factors to plug into a formula if you want to compute range chart UCL and LCL figures to 3S if std deviation of process sample is unknown. Let's do the range chart first. The formulas given are UCL = D4*(mean of R) and LCL = D3*(mean of R) In this problem, you are told that n=20. So, start by pulling all the info off table 10-2 you see: at n=20... A2= 0.18; D3=0.41; and D4= Now, you need to figure out your control limits. UCL = D4* mean of R = 1.59*.45=.7155 LCL = D3* mean of R =.41 *.45 =.1845 Now let's do mean chart control limits. From page 470, your mean chart limit formulas using sample range are: UCL = mean of x + A2*R =3.1+ (.18*.45) = LCL = mean of x - A2*R = (.18*.45) = Now, you can compare x and r values from the data to see if they are within limits.

Problem 6 “must be repeated” is code for binomials, and therefore proportion. So, use formulas for p-chart. Given n=200; z =2 In sample 1, p= 1/200=.005 the mean of p= 25/(13*200)=.0096 Control limits = & - 2* SQR((mean of p* 1- mean of p)/n)= & =.0234 and (effectively 0)

Problem 6 continued Now, as instructed, we’ll throw out sample 10 (it’s value is too large) and re-compute mean of p= 18/(12*200) =.0075 Limits = & - =.0197 and = (0)