1 Chapter 10. Standard Costs. M11-Chp-10-1-Standard-Costs-2011-0524 Edited May 24, 2011. Copyright © 2011, Dr. Howard Godfrey This file contains illustrative.

Slides:



Advertisements
Similar presentations
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs Chapter 11: Flexible Budgeting and the Management of Overhead and.
Advertisements

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Standard Costing and Variances
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Flexible Budgets and Overhead Analysis.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Flexible Budgets Distinguish between.
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
Hilton Maher Selto. 17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc.,
Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead.
©2008 Prentice Hall Business Publishing, Introduction to Management Accounting 14/e, Horngren/Sundem/Stratton/Schatzberg/Burgstahler Introduction.
ACTG 321 Agenda for Lecture 14
Flexible Budgets and Overhead Analysis Chapter 11.
1-1.
Flexible Budgets and Standard Cost Systems
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall
Using Variances under Standard Cost System
Accounting for Overhead .
Copyright © 2003 Pearson Education Canada Inc. Slide 7-91 Chapter 8 Flexible Budgets, Variances, and Management Control: II.
Flexible Budget, Overhead Cost Variances and Management Control
Introduction Overhead costs are a major cost area for many organisations. Planning and control of overhead costs is an ongoing challenge to managers.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 8 - Flexible Budgets and Variance.
Financial and Managerial Accounting
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 17 Flexible Budgets, Overhead Cost Management, and Activity-Based.
Chapter 23 Flexible Budgets and Standard Cost Systems
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
Controlling Manufacturing Costs: Standard Costs
Ch.11 Exercises Norwall Company’s Flexible budget manufacturing overhead (in condensed form) is given below : The following information is available for.
Flexible Budget, Overhead Cost Variances and Management Control Lecture 19 1 Readings Chapter 8,Cost Accounting, Managerial Emphasis, 14 th edition by.
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
ACC3200 STANDARD COSTING.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Flexible Budgets and Variance Analysis.
Flexible Budgeting Chapter 07, 08
The Islamic University –Gaza
Flexible Budgets and Overhead Analysis Chapter 7.
1 Chapter 8. Profit Planning M11-Chp-09-1-Profit-Planning Summer, Edited May 23, Copyright © 2011, Dr. Howard Godfrey This file contains.
1 Chapter 7- Cost Management Systems-ABC. M11-Chp-08-1-Cost-Mgt-Systems-ABC Summer, Edited May 23, Copyright © 2011, Dr. Howard Godfrey.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
1 Chapter 9. Flexible Budgets. Variance Analysis. M11-Chp-10-1-Flex-Bud-Variances Edited May 24, Copyright © 2011, Dr. Howard Godfrey This.
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Accounting Principles Using Excel for Success PowerPoint Presentation by: Douglas Cloud, Professor Emeritus Accounting, Pepperdine University.
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
Flexible Budgeting and Analysis of Overhead Costs CHAPTER 11 Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution.
Part 1 Study Unit 7 Review Jim Clemons, CMA.
Chapter 17 Overhead Cost Management Flexible Budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Production Cost Variance Analysis
Chapter 19 Manufacturing Overhead Standard Costs: Completing the Accounting Cycle for Standards costs.
Flexible Budgets and Overhead Analysis
17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting.
Flexible Budgets and Overhead Analysis
Flexible Budgets and Overhead Analysis
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Chapter 22 Performance Evaluation Using Variances from Standard Costs
Managerial Accounting
MANAGEMENT ACCOUNTING
Flexible Budgets and Overhead Analysis
Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned,
Performance Evaluation Using Variances from Standard Costs
Standard Cost Accounting Materials, Labor, and Factory Overhead
Flexible Budgets and Overhead Analysis
Power Notes Chapter 21 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Presentation transcript:

1 Chapter 10. Standard Costs. M11-Chp-10-1-Standard-Costs Edited May 24, Copyright © 2011, Dr. Howard Godfrey This file contains illustrative problems that will be used in the lecture to illustrate important concepts and procedures. Copyright Dr. Howard Godfrey – M11-Chp-10-1-Standard-Costss

2 After studying Chapter 10, you should be able to: LO1 Compute the direct materials quantity and price variances and explain their significance. LO2 Compute the direct labor efficiency and rate variances and explain their significance. LO3 Compute the variable manufacturing overhead efficiency and rate variances and explain their significance. LO4 (Appendix 10A) Compute and interpret the fixed overhead volume and budget variances. LO5 (Appendix 10B) Prepare journal entries to record standard costs and variances.

Goal Company manufactures a product. Standard for one unit is 9 labor hours at $15 per hour. During this period, 500 units were produced. Actual total direct labor cost was $70,000 for 5,000 labor hours worked. What is the direct labor rate variance? a. $5,000 unfavorable b. $5,000 favorable c. $14,250 unfavorable What is the direct labor efficiency variance? a. $7,500 unfavorable b. $7,500 favorable c. $14,250 unfavorable 3

What is the labor rate variance 4 1.$5,000 unfavorable 2.$5,000 favorable 3.$4,500 favorable

What is labor efficiency variance? 5 1.$7,500 unfavorable 2.$7,500 favorable 3.$14,000 favorable

1: Setting standards 6

2: Materials variances 7

Materials Variances Throop Company had budgeted 50,000 units of output using 50,000 units of raw materials at a total material cost of $100,000 ($2 per unit of raw material). Actual output was 50,000 units of product requiring 45,000 units of raw materials at a cost of $2.10 per unit. The direct-material price variance & usage variance were: Price Usage or efficiency a. $ 4,500 unfavorable $10,000 favorable b. $ 5,000 favorable $10,500 unfavorable c. $ 5,000 unfavorable $10,500 favorable d. $10,000 favorable $ 4,500 unfavorable (Source: CPA) 9

Isolating the Causes of Variances During March, Big Company's direct-material costs for the manufacture of product T were: Actual unit purchase price$6.50 Standard quantity allowed for actual production2,700 Quantity purchased & used for actual production2,900 Standard unit price (Std. cost per unit)$6.25 The material usage variance for March was: a. $1,250 unfavorable b. $1,250 favorable c. $1,300 unfavorable d. $1,300 favorable 12

T Accounts for Variance Entries 14

Material Variances Local Company manufactures sofa's with vinyl covering. The standard material cost for the vinyl for one sofa is $27.00 based on twelve square feet of vinyl at a cost of $2.25 per square foot. A production run of 1,000 sofas resulted in usage of 12,600 square feet of vinyl at a cost of $2.50 per square foot, a total cost of $31,500. The price variance resulting from the above production run was: a. $1,200 unfavorable b. $3,150 unfavorable c. $1,800 favorable d. $3,150 favorable e. None of these 15

3: Direct labor variances 18

Labor Variances Information on Barber Company's direct- labor costs for January is as follows: Actual direct-labor hours34,500 Actual labor rate$7.00 Standard direct-labor hours35,000 Standard labor rate$6.40 What is Barber's direct-labor rate variance? a. $17,250 unfavorable b. $20,700 unfavorable c. $21,000 unfavorable d. $21,000 favorable 19

Isolating the Causes of Variances Information on Barber Company's direct- labor costs for January is as follows: Actual direct-labor hours34,500 Actual labor rate$7.00 Standard direct-labor hours35,000 Standard labor rate$6.40 What is Barber's direct-labor efficiency variance? a. $3,200 unfavorable b. $3,200 favorable 20

4: Variable overhead variances 23

Variable-Overhead Variances Note preceding slide. We were more efficient with labor hours than expected. That means we did not pay as much for labor as we would have expected. Overhead is what we spend to support our workers. If workers complete the work in less time, we have two favorable variances: 1.Labor efficiency variance 2.Variable overhead efficiency variance 24

Flexible Budget for Overhead-1 The exhibit on the second following page shows a flexible budget. The overhead application rate for variable overhead should be unchanged within the relevant range. The overhead rate for fixed overhead depends on the “denominator level.” (like how many students come to the dance to cover fixed band costs – earlier example.) The total overhead rate also depends on the denominator level. 25

Flexible Budget for Overhead-2 The exhibit on the next page shows a flexible budget. Recall from our earlier use of this problem that we used the high-low method to compute the fixed cost element of overhead and compute the variable overhead rate. 26

27

Flexible Budget for Overhead-5 Note on Slide 7 that we budgeted fixed overhead to be $6,400. When the period was over, we found that we spent $6,500 for fixed overhead items. That is a spending problem. We produced enough product to justify using 900 hours of labor, but we actually used 910 hours of labor. That is an efficiency problem. This involves a waste of payroll dollars, but it also involves a waste of support costs (the support costs for the extra 10 hours of work that was wasted.) Etc. 29

Flexible Budget for Overhead-6 Our total overhead for 900 good hours of work should be: (900 good hours X ($ $1.40)) That would be $7,020. We actually spent $8,000 for overhead ($1,500 + $6,500) Our overall budget variance is $980. What are the specific reasons for this variance. One reason: we planned on operating 1,000 hours, but only had 900 standard hours of work. (Too few persons came to the dance) 30

Flexible Budget for Overhead Adams Corp. has developed the following flexible- budget formulas for annual indirect-labor cost: Annual indirect labor cost = $4,800 + $0.50 per machine hour Operating budgets for the current month are based upon 20,000 hours of planned machine time. Indirect-labor costs included in this monthly planning budget are: a. $14,800 b. $10,000 c. $14,400 d. $10,400 32

Flexible Budget for Overhead - Question When using a flexible budget, what will occur to variable costs (on a per unit basis) as production increases within the relevant range? a. Variable costs are not considered in flexible budgeting. b. Variable costs per unit will decrease. c. Variable costs per unit will increase. d. Variable costs per unit will remain unchanged.

Variable-Overhead Spending Variance Martin Company uses a two-way analysis of overhead variances. Selected data for the April production activity are as follows: Actual variable factory overhead incurred$196,000 Variable factory OH rate per direct-labor hour 6.00 Standard direct-labor hours allowed33,000 Actual direct-labor hours32,000 The variable overhead spending variance is: a. $2,000 favorable b. $4,000 unfavorable c. $4,000 favorable d. $6,000 favorable 35

Variable-Overhead Spending Variance A company uses a standard cost system and prepared the following budget at normal capacity for January: Direct-labor hours (denominator hours)24,000 Variable factory overhead$ 48,000 Fixed factory overhead$108,000 Total factory overhead per direct-labor hour$ 6.50 Actual data for January were as follows: Direct-labor hours worked 22,000 Total fixed factory overhead$105,000 Total variable overhead$ 39,000 Standard direct-labor hours allowed for capacity attained 23,000 What is the variable overhead efficiency variance for January? a. $2,000 favorable b. $5,000 favorable c. $2,000 unfavorable d. none of these 37

5: Performance measures 39

6: Fixed overhead variances 40

Production-Volume Variance A production-volume variance is a variance that appears whenever actual production deviates from the expected volume of production used in computing the fixed overhead rate.

Production-Volume Variance Actual volume - Expected volume Difference X Fixed overhead rate = Production-volume variance

Volume Variance Applied fixed overhead – Budgeted fixed overhead = Production-volume variance In practice, the production-volume variance is usually called simply the volume variance.

Other Variances The fixed-overhead flexible budget variance (also called the fixed-overhead spending variance or simply the budget variance) is the difference between actual fixed overhead and budgeted fixed overhead.

Fixed Overhead Variances Universal Co. uses a standard cost system and prepared the following budget at normal capacity for January: Direct-labor hours (denominator hours)24,000 Variable factory overhead$ 48,000 Fixed factory overhead$108,000 Total factory overhead per direct-labor hour$ 6.50 Actual data for January were as follows: Direct-labor hours worked 22,000 Total fixed factory overhead$105,000 Total variable overhead$ 45,000 Standard direct-labor hrs allowed for capacity attained 20,000 Fixed overhead spending variance for January? a. $2,000 favorable b. $3,000 favorable c. $2,000 unfavorable b. $3,000 unfavorable e. other

7: Journal entries 48

Materials Variances During March, Big Company's direct-material costs for the manufacture of product T were: Actual unit purchase price$6.50 Standard quantity allowed for actual production2,700 Quantity purchased & used for actual production2,900 Standard unit price (Std. cost per unit)$6.25 The material usage variance for March was: a. $1,250 unfavorable b. $1,250 favorable c. $1,300 unfavorable d. $1,300 favorable 49

T Accounts for Variance Entries 51

8: Other 52

Raleigh Corp. has developed the following flexible-budget formulas for annual indirect-labor cost: Total annual indirect labor cost = $4,800 + $0.50 per machine hour. Operating budgets for the current month are based upon 19,200 hours of planned machine time. Indirect-labor costs included in this monthly planning budget are: a. $14,800 b. $10,000 c. $14,400 d. $10,400 53

54

55

5: More than one cost driver 56

6: Common errors 57

The End 58