TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley.

Slides:



Advertisements
Similar presentations
University of Kansas EPS of KUTEsat Pathfinder Leon S. Searl April 5, 2006 AE256 Satellite Electrical Power Systems.
Advertisements

LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Yongho Kim Aug 2, : My Job TLM_ReceiverRS decoderGSEOS Nothing.. Interface - Serial line - TCP/IP connection with MPS Functions - CCSDS frame,
Team Phoenix March 15, Project Goal Our team will develop an air vehicle that will not only navigate a course autonomously while providing real.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 MAGIC Patrick Brown Imperial College London.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
TRIO-CINEMA 1 UCB, 2/08/2010 STEIN Intro Davin Larson Space Sciences Laboratory University of California, Berkeley.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
- Recommendations status - PRR Review report: actions - Conclusion EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Status.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
CINEMA (CubeSat for Ions, Neutrals, Electrons & MAgnetic fields) Jerry Kim * David Glaser † Thomas Immel ‡ * Systems Engineer, †
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
Team JHK Project TIC Personnel Supreme Commander Jarrod Marsh.
TRIO-CINEMA 1 UCB, 2/08/2010 Cinema Stein Interface FPGA (CSI) [Part II] Karthik Lakshmanan CINEMA - EE Team Space Sciences Laboratory University of California,
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixtures FEE64 commissioning A few of the remaining tasks 16th July 2009.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
TRIO-CINEMA Meeting at KHU 1 October 19-23, 2009 CINEMA Operations Manfred Bester.
Taeyeon Kim. Page  2 1.Vibration test plan for KHU 2.Harnessing 3.STEIN Housing 4.Future work.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
TRIO-CINEMA 1 KHU, 08/10/2010 TRIO-CINEMA Activity in Korea Jongho Seon 10 Aug 2010.
Solar Probe Plus FIELDS DFB Report Quarterly Management July 18, 2013.
TRIO-CINEMA 1 UCB, 2/08/2010 Solar Array Kevin Jenkins Mechanical Engineering Space Sciences Laboratory University of California, Berkeley.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
SPP FIELDS DFB Quarterly June 16, 2015 Solar Probe Plus FIELDS Instrument Quarterly Q Digital Fields Board (DFB) 1.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Mechanical Systems David Glaser Mechanical Engineering Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Solar Array Design Review Yashraj Khaitan David Glaser Kevin Jenkins Chris Pasma Space Sciences Laboratory University.
FGM peer CDR GSE - 1 Berlin, April 6, 2004 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian Academy of.
TRIO-CINEMA FSW- 1 SSL, 8/10/2010 Flight Software Seyoung Yoon and Sameet Ramakrishnan Space Sciences Laboratory Kyung Hee University University of California,
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review Requirements Definition Peter R. Harvey May 12, 2010.
Introduction: The on-board measurements available for control are a dual-slit sensor to find the elevation of the sun and a magnetometer to measure the.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
TRIO-CINEMA 1 KHU, 10/08/2010 Ground Support Software Yong-ho Kim 22 Feb 2011 School of Space Research Kyung Hee University.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Chris Pasma, SSL Mechanical.
TRIO-CINEMA 1 UCB, 2/08/2010 LVPS & Switching Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 Integration and Test Program Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 10/8/2010 Chassis & Avionics Stack Design Jerry Kim Mechanical Engineering Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA 1 UCB, 2/08/2010 Mission Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
 Mechanical Components have been ordered and should arrive by Week 1 of winter quarter  Outstanding electrical components dependent on varying mechanical.
TRIO-CINEMA 1 UCB, 2/08/2010 ClydeSpace Electronic Power System Yashraj Khaitan Space Sciences Laboratory University of California, Berkeley.
TRIO-CINEMA C&DH- 1 KHU, 10/19/2009 Command & Data Handling System (C&DH) Peter Harvey David Curtis David McGrogan Space Sciences Laboratory University.
TRIO-CINEMA 1 UCB, 2/08/2010 ACS Dave Auslander, Dave Pankow, Han Chen, Yao-Ting Mao, UC Berkeley Space Sciences Laboratory University of California, Berkeley.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
S A Griffiths CM42 June 2015 Electrical & Control.
TRIO-CINEMA 1 UCB, 2/08/2010 FSW & Operations Winter Summary Seyoung Yoon KHU EE Team.
Development of T3Maps adapter boards
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
FGM CDR FGM Electronics (FGE) Ronald Kroth MAGSON GmbH Berlin Germany.
Command & Data Handling
CINEMA System Engineering
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Command & Data Handling
Instrument Interface FPGA
ACS UC Berkeley Space Sciences Laboratory
HA1L High Altitude 1U Laboratory
HA1L High Altitude 1U Laboratory
CubeSat vs. Science Instrument Complexity
<Your Team # > Your Team Name Here
Radio Interface Board Status
Presentation transcript:

TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley

TRIO-CINEMA 2 UCB, 8/10/2010 Summer 2010 Highlights Core Flight Software Complete Mechanical Design Approaching Completion Avionics Stack Moved for MICD v14 Solar Panel Design and Test Complete Attitude Control System Demonstrated w/Simulink Power Systems Tested and Characterized IIF Specification Complete – IIF Spec v2.2 IIB Layout Complete – Ready for Fabrication Magnetometer ICD and Tech Report Revised

TRIO-CINEMA 3 UCB, 8/10/2010 S-Band Radio S-Band Radio:Emheiser Transmitter EDTC-01E1A102-C0 Ready to order once pigtail length is determined (a current Mech and EE task) Max length 10.5”, current estimate 9.4”. RG316 Coaxial to be used for this and UHF Helium Receiver.

TRIO-CINEMA 4 UCB, 8/10/2010 Avionics Stack from Bottom Up Flight Processor not ordered. 2 nd dev unit purchased at SSL, 3 total dev units for UCB CINEMA. Flight Clyde EPS thoroughly tested by Nestor Vargas and FSW team. Charge current calibration Max. Power Point Tracking Battery discharge power cutoff : Found to be instantaneous Flight Battery delivered, cold stored. Flight UHF Helium Radio Receiver powered up. Testing procedures under development, but help is needed here.

TRIO-CINEMA 5 UCB, 8/10/2010 Instrument Interface Board v2.0  Final revision of IIB from John Diaz replaces Nanonics 65 pin connector with 2 (2x17) floppy drive connectors.  This has implications for harnessing that are not completely appreciated at the moment, but it is a much easier connector to work with.  We’re ready to send this board out for quotes. Parts list needs to be checked twice. Layout done in DipTrace

TRIO-CINEMA 6 UCB, 8/10/2010  KHU has also developed a test IIB board.  Layout is quite different, but based upon the same schematic and so should be electrically compatible with UPR IIB.  Incompatible with MICD due to large test connector. Layout done in Allegro Instrument Interface Board v2.0

TRIO-CINEMA 7 UCB, 8/10/2010 MAGIC MAGIC Experiment Test Unit (ETU) delivery end of August. Test board w/PC104 connector and single- axis magnetometer. Other axes provided with test connections for test voltages. Delivery in 4-6 weeks. Preparation for its arrival should include: 1)Initial FPGA programming 2) Test harness preparation 3) Development of testing procedures, CPDs

TRIO-CINEMA 8 UCB, 8/10/2010 CHANGES 1)FPGA MAG interface simplified. dsPIC Flight Software will command all reads of MAGIC ADC. 2)Change to an application-specific integrated circuit (ASIC) necessitates major changes in STEIN electronics. Until that is clarified, STEIN FPGA and electronics work is halted. 3)Development of alternative to GSEOS is now supported at UCB. Presentation and demonstration on Thursday.

TRIO-CINEMA 9 UCB, 8/10/2010 What are our top priorities? Develop UHF radio test procedures. Develop IIB/FPGA code. Produce the first set of IIBs. Produce 10 flight solar panels. Develop the Ground Support Software and Equipment. Prepare to receive the MAGIC ETU. Determine performance of sun sensors.

TRIO-CINEMA 10 UCB, 8/10/2010 What are our top risks? Known Unknowns: Fail to develop Ground Support Software Unexpected glitches with ADC reading of MAGIC Test of S-Band transmitter likely lengthy and difficult. Difficulty with ACS Harness innerconnect to SBAND, HELIUM, IIB, MAGIC, HVPS, STEIN will be difficult, same with all solar panels and radio connections. Unknown Unknowns: Communication with eventual STEIN via new GSE (as if GSEOS would be easier)? Performance of IIB? What will break when we shake?

TRIO-CINEMA 11 UCB, 8/10/2010 What are our top strengths?

TRIO-CINEMA 12 UCB, 8/10/2010